ML20028A359

From kanterella
Jump to navigation Jump to search
Forwards LER 82-022/03L-0
Date released: 02/11/2020 Download: ML20028A359


LER 82-022/03L-0:on 821005,diesel Generator a Failed to Reach Required Voltage & Frequency within Tech Spec Time Limit.Caused by Fuel Oil Return Line Check Valve Failure. Valve Replaced
ML20028A360
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/03/1982
From: Pelletier J
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20028A360 (1)
Forwards LER 82-022/03L-0
ML20028A358
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/03/1982
From: Pelletier J
VERMONT YANKEE NUCLEAR POWER CORP.
To: HAYNES R C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20028A358 (1)