ML20028A303
| ML20028A303 | |
| Person / Time | |
|---|---|
| Issue date: | 10/20/1982 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Bessey R SOUTHWEST RESEARCH INSTITUTE |
| Shared Package | |
| ML20028A304 | List: |
| References | |
| REF-QA-99900909 NUDOCS 8211180212 | |
| Download: ML20028A303 (2) | |
Text
,
J p
e OCT 20 M Docket No. 99900909/82-02 Southwest Research Institute ATTN: Mr. Roger L. Bessey Group Leader 6220 Culebra Road San Antonio, TX 78284 Gentlemen:
This refers to the inspection conducted by Mr. A. L. Smith of this office on of your facility at San Antonio, Texas, and to the September 20-21, 1982,ings with Mr. Tim Fey and members of your staff at the discussion of our find conclusion of the inspection.
Areas examined during this inspection and our findings are discussed in the Within these areas tion of procedures and representative, the inspection consisted of an examina-re enclosed report.
observations by the inspector.
Within the scope of this inspection, we found no instance where you failed to meet NRC requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains an information that you believe to be exempt from disclosure under 10 CFR 9.5(a)y(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a reguest for withholding; and (b) submit within 25 days from the date of this letter a written a) plication to this office to withhold such information.
If your receipt of t11s letter has been delayed such that less than 7 days are available for your review, please notify this Consistent with office promptly)so that a new due date may be established.Section 2.790(b (1), a executed by the owner of the information which idantifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure.
This section further requires the statement to address with The information specificitytheconsiderationslistedin10CFR2.790(b)(4)bleintoaseparate sought to be withheld shall be incorporated as far as possi part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
ES SC:E S BC:VPBCl AD:V8 D:
RA: V ALSmth/jkh HSPh llips UPotapovs RLBah /t E
son JTCollins, 10/;f/82 10/if/82 10/g/82 10/$82
)/
10/f{/82
.(f\\
w s
8211180212 821020
~
d)
, PDR GA999 EXISWRI 99900909 PDR
~
1.
D Southwest Research Institute Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
~
"Ortcital S E U. POTAPOVS*'
Uldis Potapovs Chief Vendor Program, Branch
Enclosures:
1.
Appendix A - Inspection Report No. 82-02 2.
AppendixB-InspectionDataSheets(2pages) bcc:
IE Files AE0D QAB NRR-EQB NRC:PDR Rec. Administrators I, II, III, IV, V EH:ohnson RLBangart ZRRosztoczky,.EQB NBle,hardson IE WSFarmer,RE5IE SDRic Sandia DMJeppesen, Laboratories, Albuquerque,NM National
,