ML20028A020
ML20028A020 | |
Person / Time | |
---|---|
Site: | Midland |
Issue date: | 11/12/1982 |
From: | Wilcove M NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
To: | Bechhoefer C, Cowan F, Harbour J Atomic Safety and Licensing Board Panel |
References | |
ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8211160273 | |
Download: ML20028A020 (1) | |
Similar Documents at Midland | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20137N1591997-03-31031 March 1997
[Table view]Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20034E2721992-11-23023 November 1992 Partial Response to FOIA Request for Documents Re NRC Papers at Hoover Library.Records Subj to Request in App a Are Being Withheld in Part (Ref FOIA Exemption 5) ML20101Q4331991-10-30030 October 1991 Partial Response to FOIA Request Re Investigation of Zack Co Done by Nrc.App E Records Encl & Are Being Made Available in Pdr.App D Records Already Available in Pdr.App F Records Withheld in Entirety (Ref FOIA Exemption 6 & 7) ML20044A9881990-07-11011 July 1990 Responds to Re Util Application to Conduct Onsite Disposal of Dredging Spoils.Concerns of Michigan Eco-Watch Will Receive Appropriate Attention ML20044B0001990-06-18018 June 1990 Forwards Correspondence from Northern Michigan Eco-Watch of Petoskey,Mi for Response ML20044A9951990-04-27027 April 1990 Forwards Response to to Chairman Carr Re Onsite Disposal of Dredging Spoils ML20044B0011990-03-29029 March 1990 Expresses Alarm Re Application for Disposal of Dredged Discharge Canal Sediment.Investigation of Activity Level Requested ML20248D6521989-07-20020 July 1989 Forwards Response to Util Re Bills D0184 & D0185 for Plant OL Application Review Costs by Various Program Ofcs Through June 1984 ML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20237B4361987-12-14014 December 1987 Final Response to FOIA Request for Documents.App B Document, Board Notification 84-024,encl & Also Available in PDR ML20236X6141987-12-0808 December 1987 Final Response to FOIA Request All Documents.No Addl Records Subj to Request Located ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20235K1731987-07-0909 July 1987 Partial Response to FOIA Request for Info Re Certain Contracts Awarded by NRC for Reporting Svcs.Forwards App a & B Documents.Documents Also Available in PDR ML20234F0911987-06-26026 June 1987 Responds to Appeal Re Denial of FOIA Request for Documents. Forwards Document 5 in App F.Portions of Document 5 Withheld (Ref FOIA Exemptions 6 & 7).Other Requested Documents Withheld (Ref FOIA Exemption 6) ML20215K1981987-06-19019 June 1987 Final Response to FOIA Request for Documents Re Allegations Concerning Plant.Forwards App G & H Documents.Documents Also Available in Pdr.App H Documents Partially Withheld (Ref FOIA Exemption 6) ML20213F9351987-05-0808 May 1987 Partial Response to FOIA Request.Forwards App F Document & Weld Allegations.App G Documents Partially Withheld (Ref FOIA Exemption 6) ML20206H4951987-04-13013 April 1987 Partial Response to FOIA Request for Documents Re Bechtel Employment Discrimination.Forwards App E Documents.App D Documents Withheld (Ref FOIA Exemption 6) ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20211A9531987-02-13013 February 1987 Advises That Financial Info Submitted for 1987 in Util Satisfies Requirements of 10CFR140.21 That Each Licensee Maintain Guarantee of Payment of Deferred Premiums for Operating Reactors Over 100 Mwe ML20212M7651987-01-16016 January 1987 Informs That Due to Demands on Staff,Nrc Will Respond by 870430 to 850607 Request for Review of Invoices D0184 & D0185 Re OL Application Review Costs Through 840623 ML20207C0151986-12-19019 December 1986 Forwards Notice of Withdrawal of Application for OLs & Termination of Proceeding,Per Util 860711 Request & ASLB 861217 Memorandum & Order Granting Motion ML20207C1191986-12-18018 December 1986 Forwards Order Terminating CPPR-81 & CPPR-82 Based on Fact That Const of Facility Ceased,Units Inoperable & Site Environmentally Stable,Per Util 860701 Request to Withdraw Application to Amend CPs ML20215B9641986-12-0505 December 1986 Notifies Util of 870204-05 Early Emergency Responders Workshop in Chicago,Il to Discuss Lessons Learned & Current Problems in Coordination & Integration of Emergency Response Efforts.Meeting Agenda & Preregistration Form Encl ML20214Q0911986-11-24024 November 1986 Partial Response to FOIA Request for Documents Re Ofc of Inspector & Auditor Investigations.Forwards App B Documents. Documents Also Available in PDR ML20214A0761986-11-14014 November 1986 Forwards Insp & Evaluation of Plant for Adequacy of Stabilization Plan,Documenting 861015-16 Site Insp & Review & Insp of Site Stabilization Rept.Environ Stabilization Satisfactory ML20215M8851986-10-28028 October 1986 Forwards Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.No Violations Identified ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20211B5401986-10-0909 October 1986 Further Response to FOIA Request for Eight Categories of Documents Re Ee Kent Allegations Concerning Facilities. Forwards Documents Listed in App K ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20209E6621986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR IA-86-235, Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR1986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR ML20212K9061986-08-21021 August 1986 Forwards Request for Addl Info Re Environ Review of Util 860711 Request to Withdraw Applications for OL by 860828 ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20203B2351986-07-10010 July 1986 Informs That Review of 820622 Application to Receive Unirradiated Nuclear Fuel Assemblies Terminated,Per .Fission Chambers Should Be Disposed of & Licenses SNM-1904 & SNM-1905 Terminated,Per 10CFR70.38(b) ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 1997-03-31 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20245D2661988-04-15015 April 1988
[Table view]Requests That Project Managers for Listed Plants Notify Respective Utils of Potential for Unqualified Penetrations. Licensee Should Verify Qualification & Rept Results by 880422 ML20235V3031987-07-17017 July 1987 Forwards Summary of OL Review Costs in 6-month Intervals for Period 840624-860621.Costs for Full Costs Records Through ASLB 861217 Dismissal of OL Proceeding for Plants Will Continue to Be Computed ML20101Q7831987-03-10010 March 1987 Forwards Reformatted Memo Requesting OI to Initiate Investigation Into Alleged Employment Discrimination by Zack Co,Per 870218 Request ML20237E7281986-10-0303 October 1986 Forwards Wj Dircks 811119 Testimony Before Subcommittee on Energy & Environ in Washington,Dc Re QA for Nuclear Power Plants Under Const,Per Request ML20209H8181986-09-12012 September 1986 Advises That Time for Commission to Review ALAB-842 Expired. Commission Declined Review.Decision Became Final Agency Action on 860910.Served on 860912 ML20203P1581986-04-24024 April 1986 Forwards CPC Notifying ASLB of Intent to Convert Facility to Combined Cycle gas-fired Plant,In Response to 860414 Memo.Board Notification by Staff Unnecessary ML20155D6591986-04-14014 April 1986 Provides New Info & Relevant Matl to Ol/Om Proceeding Re Util 860407 Notification of Petition to PSC of Mi for Conversion of Nuclear Plants to Natural Gas ML20198A7141985-10-0505 October 1985 Advises That Licensee Does Not Intend to Pursue Issue of Facility Settlement Exceeding freeze-wall Heave Due to Discontinuation of Const.Issue Will Not Be Pursued Until Project Reactivated ML20140G9421985-09-30030 September 1985 Forwards SER Input.Outstanding Issues Listed,Including Flood Protection of Settled Structures & Adequacy of Dewatering Sys.Related Info Encl ML20133G1281985-05-0303 May 1985 Advises of ASLB Support of All Seismic Conclusions Except Definition of Tectonic Province.Board Found Staff Placed Too Much Reliance Upon Seismicity in Definition of Tectonic Province within Which Site Lies ML20132C9551985-04-12012 April 1985 Forwards B Garde Requesting Commissioners to Appoint ASLB Member to Review,Investigate & Issue Findings Re NRC Handling of E Kent Allegations.Info Supplemental to Previous Board Notifications 82-117 & 83-102 ML20138L2321985-04-0404 April 1985 Forwards BNL Insp Rept Re Gap Allegations Concerning Region III Conduct During Plant Insps.Based on Review of BNL Recommendations,Two Allegations of Improper Conduct Valid. Technical Divs Will Reemphasize Insp Policy.W/O Encl ML20127F8811985-03-22022 March 1985 Documents 820317 Telcons W/B Stamaris & Ee Kent Re Allegations of Welding Deficiencies at Plant.Region III Insps Described,Indicating Welds Acceptable.Kent Disagreed. ASME Code Re Socket Weld Engagement Discussed ML20215K7531985-03-14014 March 1985 Submits Evaluation of BNL Rept on Plant Allegations. Allegation Did Not Identify Any Specific Wrongdoing on Part of Any Named NRC Employee.Insp Effort Would Be Encumbered If Entrance Interview Modified ML20127F9701985-02-20020 February 1985 Forwards BNL Insp Rept Re Allegations 19 & 20 of Employment Discrimination by Bechtel at Plant,For Info.Ch Weil 850327 Handwritten Note Included.W/O Rept ML20127F9951985-02-20020 February 1985 Forwards BNL Rept Re Ee Kent Allegations at Midland Plant. Info Re San Onofre Discovered in Course of Review ML20215K4411984-09-28028 September 1984 Advises That Due to Suspension of Const at Facility,Insp Work on Listed Allegations Will Be Deferred Until Project Restarted.Two Allegations Open & Still Being Actively Pursued ML20215L7581984-08-28028 August 1984 Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR IA-85-213, Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR1984-08-28028 August 1984 Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR ML20066K6881984-08-22022 August 1984 Discusses Manpower Data Re Prof Regular Hours Expended on CP & OL Applications Currently on File.No Travel Time Included in Computations ML20095A1971984-07-18018 July 1984 Determines That Info Transmitted by 830721 Memo Should Be Issued as Board Notification 83-106 ML20095A2411984-07-18018 July 1984 Submits Package Received from B Jones from H Singh, Consisting of Questions of Dr Peck by H Singh,J Dunnicliff to Afifi & Summary of J Kane Deposition ML20094M3701984-06-0404 June 1984 Forwards Rev 4 to Region III SALP Schedule. Schedule Changes to Listed Facilities Explained in Remarks Sections of Schedule.Addl Handwritten Notes Also Encl ML20215K3131984-05-18018 May 1984 Forwards Inquiry Rept Q3-83-001 for Review & Necessary Actions.Discriminatory Employment Termination Still Under Investigation by Ofc of Investigations.Insp of Allegers Technical Concerns Contracted to Bnl.W/O Encl ML20094M6081984-05-11011 May 1984 Advises That Allegations Received from Dow Chemical & Util Are Treated Equally.Forwards E Driker Re Dow Chemical Vs CPC Lawsuit ML20091F5291984-05-0707 May 1984 Forwards Initial Response to R Landsman Concerns Re Integrity of Diesel Generator Bldg,Prepared During 830728 Working Meeting ML20091F5231984-05-0707 May 1984 Responds to 830727 Request for Comments Re RB Landsman 830719 Concerns for Diesel Generator Bldg.Listing of Transcript Pages Will Permit Reviewer to Recognize & Evaluate Similarities & Differences ML20093N9101984-05-0303 May 1984 Forwards Request for Addl Structural Engineering Info Needed to Continue OL Review of NPP Application as Applicable to Seismic Margins Review,Svc Water Pump Structure & Diesel Generator Bldg ML20094M7961984-04-13013 April 1984 Forwards Advance Copy of Proposed Rev to Manual Chapter 0516,SALP,for Review ML20087N3351984-03-16016 March 1984 Summarizes 840305 Meeting in Glen Ellyn,Il Re Approval of Const Completion Program Phase I Activities to Support Turbine Roll Milestone.Meeting Provided Addl Info to Suppl 840215 Request for Release of Phase I Activities ML20091F2961984-03-14014 March 1984 Requests Documents Subj to Encl FOIA Request 84-158 Re Novak Visits to Site or Region During Sept-Dec 1982.Related Info Encl,Including Tera Corp Agenda for 840313 Meeting Re Idcvp ML20210S4691984-03-13013 March 1984 Advises Not to Do Any Housecleaning of Paperwork Re Zack,Due to Interrogatories & Document Production Pending ML20091G5601984-03-0101 March 1984 Forwards Draft Ack Ltr & Draft Fr Notice Re Lone Tree Council 2.206 Petition on Facilities.Directors Decision DD-83-16 Denied Similar Relief Requests ML20091F2691984-02-28028 February 1984 Requests Attendance at 840313 Public Meeting in Bethesda,Md Re Idcvp ML20091F2731984-02-23023 February 1984 Requests Info Re Plans for Addl Inspectors at Site in Order to Reply to Lr Romo (Lone Tree Council) .Draft Reply Encl ML20091F2891984-02-21021 February 1984 Summarizes 840112 Meeting Re Responsibility for Idcvp. Agreements Listed,Including Technical Support from NRR & Region III in Reviewing Design ML20095A2281984-02-18018 February 1984 Forwards Board Notification 83-16 Which Supersedes 830215 Notification ML20086Q1061984-02-15015 February 1984 Forwards New Index for Const Implementation Overview Procedures & Instructions & Rev 3 to Third-Party Cost Implementation Overview ML20090H5971984-02-13013 February 1984 Discusses 840124 Memo Re Task Interface Agreement 83-78 Re Region III Request for Design Adequacy of HVAC Sys Hardness Tested Bolts.Highest Hardness Found in Sample Bolts Was Rockwell C 29.Testing Unnecessary ML20091G5911984-02-10010 February 1984 Forwards Oeld Analysis in Response to SECY-84-42 Re Directors Denial of 2.206 Relief (DD-83-16 & DD-84-2). Directors Decision Legally Sufficient Under Applicable Stds of Judicial Review ML20088A0511984-01-30030 January 1984 Responds to 840119 Telcon Re Status of Affidavit Received from Bp Garde,Govt Accountability Project.No Evidence of Misconduct Found.Subj Matter Closed by 830419 Memo to File. Info Deleted ML20091N3381984-01-25025 January 1984 Advises That Recent S&W Hiring of Field Ofc Clerk Whose Spouse Is Employed by Util Does Not Constitute Violation of Independence Criteria.Position Is Local Hire & Nontechnical. Related Info Encl ML20090H5341984-01-24024 January 1984 Forwards Safety Analysis Input Re Structural Design Adequacy of HVAC Sys,Per Task Interface Agreement 83-78. Investigation Did Not Disclose Discrepancies Expected to Cause Operating Problems ML20094K1401984-01-23023 January 1984 Documents Contacts by Kirkland & Ellis Attys Representing Dow Chemical in Suit Against Cpc.Summary of Meeting by Geotechnical Engineering,Inc Encl ML20094P7341984-01-18018 January 1984 Submits List of Documents Supplied or Withheld by Jj Harrison & RB Landsman,In Response to FOIA Request 84-24 ML20094M3521983-12-29029 December 1983 Forwards HR Denton Distinguishing Between Terms Important to Safety & safety-related. Related Info Encl ML20125B5191983-12-0707 December 1983 Expresses Appreciation for Technical Assistance Offered by L Abramsom & D Lurie Re Containment Protective Coating Deficiency ML20080T4951983-11-25025 November 1983 Advises That Vollmer Recommended Reopening Midland Hearing on Diesel Generator Bldg Structural Adequacy Issue,Based on Task Group Rept.Vollmer Memo Encl.W/O Encl ML20080T4821983-11-25025 November 1983 Forwards Guidance for Use in Deciding Whether to Recommend That Hearing Be Reopened.Hearing Should Be Reopened Based on Listed Reasons ML20093C4401983-11-25025 November 1983 Forwards Technical Evaluation of HVAC Structural Design Adequacy,Based on Findings of Mechanical Engineering Branch Design Review & Audit 1988-04-15 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20245D2661988-04-15015 April 1988
[Table view]Requests That Project Managers for Listed Plants Notify Respective Utils of Potential for Unqualified Penetrations. Licensee Should Verify Qualification & Rept Results by 880422 ML20235V3031987-07-17017 July 1987 Forwards Summary of OL Review Costs in 6-month Intervals for Period 840624-860621.Costs for Full Costs Records Through ASLB 861217 Dismissal of OL Proceeding for Plants Will Continue to Be Computed ML20101Q7831987-03-10010 March 1987 Forwards Reformatted Memo Requesting OI to Initiate Investigation Into Alleged Employment Discrimination by Zack Co,Per 870218 Request ML20237E7281986-10-0303 October 1986 Forwards Wj Dircks 811119 Testimony Before Subcommittee on Energy & Environ in Washington,Dc Re QA for Nuclear Power Plants Under Const,Per Request ML20209H8181986-09-12012 September 1986 Advises That Time for Commission to Review ALAB-842 Expired. Commission Declined Review.Decision Became Final Agency Action on 860910.Served on 860912 ML20203P1581986-04-24024 April 1986 Forwards CPC Notifying ASLB of Intent to Convert Facility to Combined Cycle gas-fired Plant,In Response to 860414 Memo.Board Notification by Staff Unnecessary ML20155D6591986-04-14014 April 1986 Provides New Info & Relevant Matl to Ol/Om Proceeding Re Util 860407 Notification of Petition to PSC of Mi for Conversion of Nuclear Plants to Natural Gas ML20199F5231986-04-0202 April 1986 Board Notification 86-012:forwards Interim Rept of Investigation Conducted by Ofc of Investigations at Plant in Midland,Mi for in Camera Consideration.W/O Rept ML20151L2411985-10-22022 October 1985 Board Notification 85-088:forwards CE Norelius 851005 Memo Advising That Licensee Does Not Intend to Pursue Issue of Exceeded freeze-wall Heave Due to Discontinuation of Const at Facility.No Further Reporting on Issue Planned ML20133F3951985-10-0707 October 1985 Board Notification 85-086:suppls Board Notifications 82-117, 83-102 & 85-045 Re welding-related Allegations at Midland 1 & 2.H Wahl (Bechtel) 850916 Summary of Developments in Suit Filed Re E Kent Allegations & Encl ML20198A7141985-10-0505 October 1985 Advises That Licensee Does Not Intend to Pursue Issue of Facility Settlement Exceeding freeze-wall Heave Due to Discontinuation of Const.Issue Will Not Be Pursued Until Project Reactivated ML20140G9421985-09-30030 September 1985 Forwards SER Input.Outstanding Issues Listed,Including Flood Protection of Settled Structures & Adequacy of Dewatering Sys.Related Info Encl ML20128G7621985-06-28028 June 1985 Staff Requirements Memo Re 850620 Affirmation/Discussion & Vote in Washington,Dc.Edo & RES Should Forward Fr Notice Re Approved Final Rule on Pressurized Thermal Shock for Signature & Publication ML20133G1281985-05-0303 May 1985 Advises of ASLB Support of All Seismic Conclusions Except Definition of Tectonic Province.Board Found Staff Placed Too Much Reliance Upon Seismicity in Definition of Tectonic Province within Which Site Lies ML20132C9551985-04-12012 April 1985 Forwards B Garde Requesting Commissioners to Appoint ASLB Member to Review,Investigate & Issue Findings Re NRC Handling of E Kent Allegations.Info Supplemental to Previous Board Notifications 82-117 & 83-102 ML20138L2321985-04-0404 April 1985 Forwards BNL Insp Rept Re Gap Allegations Concerning Region III Conduct During Plant Insps.Based on Review of BNL Recommendations,Two Allegations of Improper Conduct Valid. Technical Divs Will Reemphasize Insp Policy.W/O Encl ML20127F8811985-03-22022 March 1985 Documents 820317 Telcons W/B Stamaris & Ee Kent Re Allegations of Welding Deficiencies at Plant.Region III Insps Described,Indicating Welds Acceptable.Kent Disagreed. ASME Code Re Socket Weld Engagement Discussed ML20215K7531985-03-14014 March 1985 Submits Evaluation of BNL Rept on Plant Allegations. Allegation Did Not Identify Any Specific Wrongdoing on Part of Any Named NRC Employee.Insp Effort Would Be Encumbered If Entrance Interview Modified ML20127F9701985-02-20020 February 1985 Forwards BNL Insp Rept Re Allegations 19 & 20 of Employment Discrimination by Bechtel at Plant,For Info.Ch Weil 850327 Handwritten Note Included.W/O Rept ML20127F9951985-02-20020 February 1985 Forwards BNL Rept Re Ee Kent Allegations at Midland Plant. Info Re San Onofre Discovered in Course of Review ML20215K4411984-09-28028 September 1984 Advises That Due to Suspension of Const at Facility,Insp Work on Listed Allegations Will Be Deferred Until Project Restarted.Two Allegations Open & Still Being Actively Pursued IA-85-213, Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR1984-08-28028 August 1984 Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR ML20215L7581984-08-28028 August 1984 Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR ML20066K6881984-08-22022 August 1984 Discusses Manpower Data Re Prof Regular Hours Expended on CP & OL Applications Currently on File.No Travel Time Included in Computations ML20095A1971984-07-18018 July 1984 Determines That Info Transmitted by 830721 Memo Should Be Issued as Board Notification 83-106 ML20095A2411984-07-18018 July 1984 Submits Package Received from B Jones from H Singh, Consisting of Questions of Dr Peck by H Singh,J Dunnicliff to Afifi & Summary of J Kane Deposition ML20094M3701984-06-0404 June 1984 Forwards Rev 4 to Region III SALP Schedule. Schedule Changes to Listed Facilities Explained in Remarks Sections of Schedule.Addl Handwritten Notes Also Encl ML20215K3131984-05-18018 May 1984 Forwards Inquiry Rept Q3-83-001 for Review & Necessary Actions.Discriminatory Employment Termination Still Under Investigation by Ofc of Investigations.Insp of Allegers Technical Concerns Contracted to Bnl.W/O Encl ML20094M6081984-05-11011 May 1984 Advises That Allegations Received from Dow Chemical & Util Are Treated Equally.Forwards E Driker Re Dow Chemical Vs CPC Lawsuit ML20091F5291984-05-0707 May 1984 Forwards Initial Response to R Landsman Concerns Re Integrity of Diesel Generator Bldg,Prepared During 830728 Working Meeting ML20091F5231984-05-0707 May 1984 Responds to 830727 Request for Comments Re RB Landsman 830719 Concerns for Diesel Generator Bldg.Listing of Transcript Pages Will Permit Reviewer to Recognize & Evaluate Similarities & Differences ML20093N9101984-05-0303 May 1984 Forwards Request for Addl Structural Engineering Info Needed to Continue OL Review of NPP Application as Applicable to Seismic Margins Review,Svc Water Pump Structure & Diesel Generator Bldg ML20094M7961984-04-13013 April 1984 Forwards Advance Copy of Proposed Rev to Manual Chapter 0516,SALP,for Review ML20087N3351984-03-16016 March 1984 Summarizes 840305 Meeting in Glen Ellyn,Il Re Approval of Const Completion Program Phase I Activities to Support Turbine Roll Milestone.Meeting Provided Addl Info to Suppl 840215 Request for Release of Phase I Activities ML20091F2961984-03-14014 March 1984 Requests Documents Subj to Encl FOIA Request 84-158 Re Novak Visits to Site or Region During Sept-Dec 1982.Related Info Encl,Including Tera Corp Agenda for 840313 Meeting Re Idcvp ML20210S4691984-03-13013 March 1984 Advises Not to Do Any Housecleaning of Paperwork Re Zack,Due to Interrogatories & Document Production Pending ML20091G5601984-03-0101 March 1984 Forwards Draft Ack Ltr & Draft Fr Notice Re Lone Tree Council 2.206 Petition on Facilities.Directors Decision DD-83-16 Denied Similar Relief Requests ML20091F2691984-02-28028 February 1984 Requests Attendance at 840313 Public Meeting in Bethesda,Md Re Idcvp ML20091F2731984-02-23023 February 1984 Requests Info Re Plans for Addl Inspectors at Site in Order to Reply to Lr Romo (Lone Tree Council) .Draft Reply Encl ML20091F2891984-02-21021 February 1984 Summarizes 840112 Meeting Re Responsibility for Idcvp. Agreements Listed,Including Technical Support from NRR & Region III in Reviewing Design ML20095A2281984-02-18018 February 1984 Forwards Board Notification 83-16 Which Supersedes 830215 Notification IA-87-778, Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines1984-02-15015 February 1984 Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines ML20086Q1061984-02-15015 February 1984 Forwards New Index for Const Implementation Overview Procedures & Instructions & Rev 3 to Third-Party Cost Implementation Overview ML20244C8141984-02-15015 February 1984 Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines ML20090H5971984-02-13013 February 1984 Discusses 840124 Memo Re Task Interface Agreement 83-78 Re Region III Request for Design Adequacy of HVAC Sys Hardness Tested Bolts.Highest Hardness Found in Sample Bolts Was Rockwell C 29.Testing Unnecessary ML20091G5911984-02-10010 February 1984 Forwards Oeld Analysis in Response to SECY-84-42 Re Directors Denial of 2.206 Relief (DD-83-16 & DD-84-2). Directors Decision Legally Sufficient Under Applicable Stds of Judicial Review ML20088A0511984-01-30030 January 1984 Responds to 840119 Telcon Re Status of Affidavit Received from Bp Garde,Govt Accountability Project.No Evidence of Misconduct Found.Subj Matter Closed by 830419 Memo to File. Info Deleted ML20091N3381984-01-25025 January 1984 Advises That Recent S&W Hiring of Field Ofc Clerk Whose Spouse Is Employed by Util Does Not Constitute Violation of Independence Criteria.Position Is Local Hire & Nontechnical. Related Info Encl ML20090H5341984-01-24024 January 1984 Forwards Safety Analysis Input Re Structural Design Adequacy of HVAC Sys,Per Task Interface Agreement 83-78. Investigation Did Not Disclose Discrepancies Expected to Cause Operating Problems ML20094K1401984-01-23023 January 1984 Documents Contacts by Kirkland & Ellis Attys Representing Dow Chemical in Suit Against Cpc.Summary of Meeting by Geotechnical Engineering,Inc Encl 1988-04-15 Category:NRC TO ASLP MONTHYEARML20091P1901983-08-19019 August 1983
[Table view]Forwards Correction to Board Notification 83-106.NRC Ltr Authorizing Resumption of safety-related Welding on HVAC Inadvertently Omitted.W/O Stated Encl ML20024A0091983-05-13013 May 1983 Concurs W/Util Identifying Portions of AB Savage Deposition Transcript to Be Admitted Into Evidence W/ Exception.Page 101,Lines 19 - 24,outside Scope of Contention ML20028A0201982-11-12012 November 1982 Advises That NRC Intends to Sponsor Listed Sections of SER & Ser,Suppl 2 ML20027D1951982-11-0202 November 1982 Advises That No Supplemental Testimony Will Be Filed Re Svc Water Pump Structure & Permanent Dewatering ML20054J8351982-06-29029 June 1982 Advises That Previous Testimony by Region 3 Needs to Be Supplemented ML20052G1731982-05-12012 May 1982 Forwards Ser,Issued on 820511.W/o Encl ML20049K0511982-03-26026 March 1982 Forwards Findings of Fact & Conclusions of Law Supplementing 811230 Findings ML20038A8801981-11-20020 November 1981 Forwards D Hood,J Kane,H Singh & F Rinaldi Testimony Re Proposed Remedial Measures for Auxiliary Bldg at Facility. Certificate of Svc Encl ML20009D9021981-07-23023 July 1981 Forwards J Kane Testimony Re B Stamiris Contention 4.B & Hn Singh Testimony Re Stability of Dikes Adjacent to Emergency Cooling Water Reservoir,To Be Presented During Continuation of 810804-14 OL Hearing ML20005A7541981-06-25025 June 1981 Forwards Suppl to Ds Hood 810608 Testimony Re ASLB Question Concerning Continued Const of Permanent Backup Interceptor Wells ML20126L7991981-06-0808 June 1981 Forwards NRC Testimony for 810707 Evidentiary Hearing ML20008E3861980-10-24024 October 1980 Advises That Applicant & NRC Discovery Will Take Longer than Time Stated at 800910 Prehearing Conference.Status Will Be Reported Periodically ML19337A4791980-09-24024 September 1980 Responds to Ga Linenberger 800910 Inquiry Re NRC Conclusion on Page 3 of 790906 Order Modifying Cps.Safety Issues in Question Are Associated W/Remedial Action Correcting Soil Deficiencies ML19338C1951978-08-31031 August 1978 Notifies That Commission Decided to Accept ASLB 780607 Condition in Midland Special Proceeding Settlement Proposal. Us Comptroller General Has Been Informed by Encl Ltr ML19338C2051978-04-28028 April 1978 Responds to ASLB & Encl 780313 Motion & Stipulation Re Midland Special Proceeding Settlement Proposal.Discusses NRC Authority to Reimburse Expenses. Commission Declines to Endorse Paragraph 9 of Stipulation ML19338C0641978-03-14014 March 1978 Forwards 780313 Motion & Stipulation by Parties Proposing Settlement of Special Proceeding.Motion Not Encl.Certificate of Svc Encl ML19338C2001978-01-30030 January 1978 Discusses Commission Conclusions Re Prof Misconduct Charges Before Special Board.Case Should Be Tried Before Outside Board,If Settlement Cannot Be Reached Before Special Board ML19338C1551977-12-28028 December 1977 Informs That NRC Assessment of W Jordan Concerns Re Radon Significance & Contribution to Environ Impacts Will Be Completed in Jan 1978 ML19347A6351977-07-0606 July 1977 Responds to ASLB 770629 Request Re Status of Suppl to Fes & Suppl to Ser.Fes Transmitted 770628.SER Suppl in Preparation & Will Be Issued by 770715 ML19344D7971977-04-19019 April 1977 Discusses Arrangements for R Timm Appearance for Deposition on 770505 ML19354C3201977-04-18018 April 1977 Notifies That Wj Gundersen Testimony Filing Will Be Delayed Due to Schedule Complications Re FPC Responsibilities. Wj Gundersen Testimony Will Be Filed Prior to Scheduled 770509 Hearing Resumption ML19344A1271977-01-13013 January 1977 Forwards Corrections to Ah Meltz 761105 Testimony ML19338C0411977-01-11011 January 1977 Ack Misstatement in NRC 761230 Memorandum in Response to ASLB Order Re Preparation of Testimony of Dow Witness Temple as Noted in Util .Dow Mi Div Position in 760913 Meeting Notes Available 761105 to All Parties ML19347A6261977-01-0505 January 1977 Responds to ASLB 761223 Order Re Parties Agreement on Schedule of Witnesses for 770118.No Need to Fix Schedule for NRC Direct Witnesses.Util & Dow Chemical Attorneys Notified 770104.Other Parties Failed to Reach Agreement ML19344A1051976-11-0505 November 1976 Forwards LP Crocker,Fs Echols,Ah Meltz, & SE Feld Testimonies Per 761021 Memorandum & Order.Se Feld & Fs Echols Prof Qualifications Encl ML19338C0261976-10-13013 October 1976 Forwards VT Yankee 760927 Motion for Recall of Orders in Light of Changed Circumstances & Requests Reply by 761022. Suspension of All Pending Show Cause Proceedings Re Fuel Cycle Issues Is Being Considered ML19338C1401974-05-24024 May 1974 Forwards Info Per ASLB 740510 Order.Lists of Plant Matl & Region 3 740522 Memo Encl ML19347A5961972-09-25025 September 1972 Submits Comments to Applicant Proposed Findings of Fact & Conclusion of Law.Concurs,Subj to Certain Exceptions & Qualifications,W/Applicants Proposed Findings of Fact & Conclusion of Law ML19344D7931972-01-14014 January 1972 Forwards 720114 Suppl to 701112 SER Re Proposed Facility. Suppl Sets Forth ECCS re-evaluation Results.Reflects AEC Review of Amends 20 & 21 to CP Application Re Radwaste & Financial Qualifications.W/O Encl 1983-08-19 |
Text
.
November 12, 1982 Charles Bechhoefer, Esq.
Dr. Jerry Harbour Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Comission U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Washington, D.C.
20555 DISTRIBUTION:
Dr. Frederick P. Cowan NRC Docket Paton Administrative Judge LPDR Wilcove 6152 N. Verde Trail PDR Wright Apt. B-125 FF (2)
Adensam Boca Raton, Florida 33433 Murray Hood Christenbury/Scinto In the Matter of Rutberg Chron.
CONSUMERS POWER COMPANY Chandler (Midland Plant, Units 1 and 2)
Docket Nos. 50-329 OM & OL and 50-330 OM & OL
Dear Administrative Judges:
With respect to the hearing sessions on '.~ne diesel generator building, scheduled for December 6 to December 10, 1982, the Staff intends to sponsor the following sections of the Safety Evaluation Report (SER) and its second supplement (SSER #2).
SER $$ 1.12, 1.12.5, 2.5.4, 3.8.3, 3.8.4 SSER #2 $$ 2.5.4.1.2, 2.5.4.1.3, 2.5.4.2, 2.5.4.3, 2.5.4.4.2, 2.5.4.5.1,
_ 2.5.4.5.2 (Section titled " Diesel Generator Building", p. 2.41),2.5.4.5.4, 2.5.4.5.6, 2.5.4.6.3, 2.5.4.7, 2.5.4.8, 3.8.3.4, 3.8.3.5, 3.8.3.7.
Sincerely, Michael N. Wilcove 8211160273 821112 PDR ADOCK 05000329 Counsel for NRC Staff O
PDR cc:
Frank J. Kelley Steward H. Freeman Ms. Mary Sinclair Michael I. Miller, Esq.
Ronald G. Zamarin, Esq.
Alan S. Farnell, Esq.
James E. Brunner, Esq.
Ms. Barbara Stamiris James R. Kates Wendell H. Marshall Wayne Hearn Paul C. Rau Myron M. Cherry Peter Flynn T. J. Creswell Atomic Safety & Licensing Board Steve J. Gadler Atomic Safety & Licensing Appeal Panel Frederick C. Williams Docketing & Service Section Lee L. Bishop DESIGNATED CRIGi!M
\\
A i, 0FC 0EL%gg :0E QA mnra MWilcove/cm : _ __
_____:____________:____________:____________:__ ________:___ ~_______
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ : J Rtrt6 G -r NAME e____:____________:___f_______:____________:____________:____________:____r___L__:___________
pA1E.11/\\D gp
/
11/}L 82
-