Text

.

Commonwealth Edison one First National Plata. Chicago liisnois Accress Reply to: Post Office Box 767 Cmcago. Hhnois 60690 October 2 9, 1982 Mr. Harold R. Den to n, Director O f fice o f Nuclear Reactor Regulation U.S. Nuclea r Regulatory Commission Casnington, DC 20555

Subject:

LaSalle County Station Unit 1 Results o f Independent Review I

o f HVAC NRC Docket No. 50-373 Re ference (a):

License NPF-ll, Co ndition 2.C. (3 3). (b).

Daar Mr. Denton:

Re ference (a) states:

" Prior to exceeding 50% power oporation, the licensee shall submit the results of an independent review acceptacle to the NRC staf f of the HVAC system, inclucing design changes, fabrication, and installation.. The review shall encompass all safety-related HVAC systems and the e ffect o f non-safety related HVAC system failures on safety systems."

On October 27, 1982, Mr. Andrew J. Kempiak, C.

F. Braun Project Manager, simultaneously transmitted copies o f the "Indepen-cent HVAC Review Final Report" to the o f fice o f NRR (Dr.

A.

Bournia),

Region III ( Jame s G. Keppler), and Commonwealth Edison.

Tn o last paragraph o f the Independent HVAC Review Final R; port, Section 3, Conclusions states :

"C. F.

Braun recognizes that criticism has been mace about the Zack quality assurance program.

However, after our investigation o f the ductwork and the supports associatec with that ductwork, we feel the quality o f tne hardware and craftmanship that went into the actual installation was not aaversely af fected by the Zack quality assurance program.

Thus, we conclude that the installed HVAC systems and associated supports were in conformance with the requirements o f the Sargent anc Lundy casign."

Commonwealth Edison Company agrees with this conclusion.

It is our unoerstancing, based upon Reference (a), that your staf f acceptance of the Independent HVAC Review Final Report is required prior to LaSalle County Station Unit 1 exceeding 50% power operation.

The LaSalle County Station startup test program ha s progresse0 to the point that the station is prepared to exceed 50%

power.

Therefore, your prompt attention to this review and approval is appreciated.

Y{)

F 8211160265 821109 lI VO

^~

PDR ADOCK 05000373 P

PDR

H. R. Denton October 29, 1982 Encloseo for your use are one (1) signed original and thirt y-nin e (39) copies of this letter and o f the C. F.

Braun Indepenoent HVAC Review Final Report.

If there are any questions in this matter, please immedi-ately contact C.

W. Schroeder, Nuclear Licensing Administrator for LaSalle County Station.

Ve ry truly yours, h

i Y

l Wayne L. Stiede Assistan t Vic e-Presiden t l

CWS/1m l

I Enclosure cc:

J.

G. Keppler - Region III NRC Resident Inspector - LSCS i

I i

i l

l 5339N l

l l

l l

l l

l

l C F BR AU N & CO engin rtn, no construenon suo..oiary of sente r. ini.mation i corporation October 27, 1982 B R Shelton Commonwealth Edison Co BL-25 SNED-35 FNB P O Box 767 Chicago, IL 60690 Dear Mr. Shelton INDEPENDENT HVAC REVIEW FINAL REPORT LA SALLE STATION ADVANCE PURCHASE ORDER 805-023 BRAUN PROJECT 6356-N Attached to this letter is the October 27, 1982 Final Report, Volumes 1 through 4, for the Independent HVAC Review of Commonwealth Edison's La Salle County Nuclear Plant. In accordance with the Project Instructions, we are simultaneously sending copies of the report to Dr.

A Bournia, Office of Nuclear Reactor Regulation and Mr. James G Keppler, Regional Administrator, United States Nuclear Regulatory Coinnission.

Sincerely yours

/

MK br Andrew J Kempiak Project Manager Dr. A Bournia, " Eyes Only"-4 copies Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 NR C Docket Nos. 50-373/374 James G Keppler, Regional Administrator George R Boddeker U.S. Nuclear Regulatory Commission Manager Nuclear Projects 799 Roosevelt Road C F Braun & Co Glen Ellyn, IL 60137 1000 So Fremont Alhambra, CA 91802 Daniel L Shamblin/ Joe Dierbeck Commonwealth Edison Company La Salle County Station Sections 1 through 5 only 1000 So. Fr.mont Av... Am.mbra, Califomi. 91802. (213) 5701000. T.6.x 67-4888