Forwards Revision 0 to Mark I Vacuum Breaker Improved Valve Dynamic Model - Model Development & Validation & Revision 0 to Revised Vacuum Breaker Valve Response for Fermi-2
ML20027E820
Person / Time
Site: Fermi 
Issue date: 11/09/1982
From: Tauber H
DETROIT EDISON CO.
To: Kintner L
Office of Nuclear Reactor Regulation
Shared Package
ML20027E821 List:
References
EF2-60-296, NUDOCS 8211160213
Download: ML20027E820 (3)


Text

___ -- - -..

Harry Tcubar Group Vice President a e 28 7

3 November 9, 1982 i

EF2 - 60,296 Mr. L. L. Kintner U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing i

Washington, D. C. 20555

Dear Mr. Kintner:

References:

(1)

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 (2)

Detroit Edison to NRC letter, " Evaluation of the Enrico Fermi 2 Drywell-to-Wetwell Vacuum Breakers", EF2-59,061, August 18, 1982 (3)

Detroit Edison to NRC letter, " Schedule for the Resolution of NRC Open Items in the Review of the Fermi 2 Mark I Contain-l ment", EF2-60,113, October 15, 1982

Subject:

Submittal of Reports for the Fermi 2 Vacuum Breakers The Reference 2 letter summarized the results of stu-dies made of the Fermi 2 design basis Drywell-to-Wetwell vacuum breakers in response to a design basis LOCA.

The letter also presented the Detroit Edison

()()

program for intended modifications to the valves to i

replace valve components calculated to exceed code S

gj allowable stresses and provided justification for CfI) interim operation in case those modifications couldn't j

be made prior to fuel load.

Subsequent to this, as documented in Reference 3, GE gave a brief presentation at a meeting with your Staff on September 9 and 10, 1982 summarizing the generic Mark I effort in developing the methodology for the analysis of the vacuum breakers.

Your Staff stated in response that they would like a report describing the methodology and the appropriate plant unique calculations.

DO K 05hhh34g l

PDR

'Mr. L. L. Kintner November 9, 1982 EF2 - 60,296 Page 2 s

The applicable reports have been developed, and forty copies are attached for your use.

General Electric will also be submitting the generic report (CDI Tech Note 82-31) on behalf of the Mark I Owners Group.

It is also our understanding that General Electric is planning to give a presentation to you on this subject in the December 1st time frame.

Should you have any further questions, please contact Mr. L. E. Schuerman, (313) 649-7562.

Sincerely, cc:

Mr. B. Little Mr. B. Siegel 4

, e w"**

Mr. L. L.'Kintner November 9, 1982' EF2 - '60,296 Page 2' bec:

T. A. Alessi E. L. Alexanderson H. O. Arora M. L. Batch

0. K. Earle L. E. Eix W. J. Fahrner E. P. Griffing W. H. Jens/W. R. Holland L. E. Kanous A. K. Lim E. Lusis P. A. Marquardt J. W. Nunley L. E. Schuerman R. A. Vance A. E. Wegele Document Control C. M. Johnson (GE-San Jose)

R. Mapes (GE-San Jose)

J. E. Slider (NUS-Gaithersburg)

L. Steinert (NUTECH-San Jose)

F. H. Sondgeroth (NUS-Troy)

(