Text

- _

l i . 2 .

l

.

  • e .

DDCRET NO. 50 - 277 DATE NOVEMBER 10, 1982 f* __

COMPLETED BY PHILADELPHIA ELECTRIC CDMPANY W.M.ALDEN

( ENGINEER-IN-CHARGE NUCLEAR SECT 1DN i GENERATIDN DIVISION-NUCLEAR TELEPHONE (2158 841-5022 OPERATING STATUS ,

1 NOTES: UNIT 2 EXPERIENCED TWO I

1. UNIT NAME8 PEACH SOTTDM UNIT 2

. g i i

2. REPORTING PERIDO: DC108ER, 1982 i SCHEDULED LDAD REDUCTIONS g

_ _ _ __ _ g AND TWO FORCED SHUTDOWNS. l

3. LICENSED THERMAL POWER (MWilt 3293 1 i

-- I 1

4. NAMEPLATE RATING (GROSS MWEls 1152 l l l 1065 l l
5. DESIGN ELECTRICAL RATING (NET MWEls I 1 1

4

6. MAXIMUM DEPENDABLE CAP ACITY (GROSS MWEls -1098 1 1

1051 i l

7. MAXIMUM DEPENDABLE CAPACITY (NET MWEls i 8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE RE A
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWElt
10. RE ASONS FOR RESTRICTIDNS, IF ANY 4

$ YR-TO-D AT E CUMULATIVE THIS MONTH 7,296 72,984 745 ,

11. HOURS IN REPDRTING PERIOD 670.8 4,053.9 53,79T.3
12. NUMBER OF HOURS REACTOR WAS CRITICAL f 0.0 0.0 0.0

' 13. RE ACTOR RESERVE SHUTDOWN HOURS 649.0 3,803.7 52,260.2

14. HOURS GENERATOR DN-LINE 0.0 0.0 0.0
15. UNIT RESERVE SHUTDOWN HOURS 2,062,387 11,204,909 152,428,225
16. GROSS THERMAL ENERGY GENERATED (MWH) 683,290 3,666,300 50,170,070 1T. GROSS ELECTRICAL ENERGY GENERATED IMWH) ' ~

657,166 3,501,361 48,09II0 6

18. NET ELECTRICAL ENERGY GENERATED (MWH) 87.I 52.I 71.6
19. UNIT SERVICE FACTOR

+

87.1 52.1 71 6 I--- 20. UNIT AV AILABILITY FACTDR 83 9 45.7 62.7

21. UNIT CAPACITY FACTOR (USING MDC NET) 45.1 -

61.9

- --- - 82.s

22. UNIT CAPACITY FACTOR (USING DER NET) 12 9 4.2 7.9
23. UNIT FORCED DUTAGE RATE
24. SHUTDOWNS SCHEDULED O'VER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF E ACHis 9

i

25. IF SMUTDOWN AT END OF REPORT PERIOD, EST1 MATED DATE OF STARTUP FORECAST ACHIEVE 0
26. UNITS IN TEST STATUS (PRIOR 10 COMMERCIAL OPERATIONis INITIAL CRITICALITY .

INITI AL ELECTRICITY . ..-- --

~

COMMERCIAL OPERATION ___

om+-

8211160179 821110 PDR ADOCK 05000277

, R PDR

OPERATItat. DATA REPORT

  • COCRET NO. 50 - 2T8 . ..

DATE NOVEMBER 10, 1982 COMPLETED BY PHILADELPHI A ELECTRIC COMP ANY W.M.ALDEN ENGINEER-IN-CHARGE

- NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS .

i NOTES 8 UNIT 3 EXPERIENCED ONE l

1. UNIT NAME8 PE ACH BOTTOM UNIT 3 l

._ -- l OCTOBER, 1982 l SCHEDULED LOAD REDUCTION. l

2. REPORTING PERIOD: l

__ l 3293 .6 l

3. LICENSED THER$AL POWER (MWils -- i 1152<jaI l
4. NAMEPLATE RATING (GROSS MWElJ 1

- l 4 1065 l l

5. DESIGN ELECTRICAL RATING (NET .U7: - i 1

I l

. 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWEls 1998 I

' I 1035 l l

7. MAXIMUM DEPENDA8LE CAPACITY (NET MWEls

, 8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 73 SINCE LAST REPORT, GIVE REASONS 8 I 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY , NET ( MWEls i

! 10. REASONS FOR RESTRICTIONS, IF ANY8 I

THIS MONTH VR-T D-D AT E CUMUL ATIVE 745 7,296 68,880

11. HOURS IN REPDATING PERIOD __ . .

745.0 6,918.3 52,465.7

12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 0.0 9
13. REACTOR RESERVE SHUTDOWN HOURS 745.0 6,910.0 51,136.8 t 14. HOURS GENERATOR ON-LINE - --- .

0.0 0.0 0.0

15. UNIT RESERVE SHUTDOWN HOURS 22,072,533 148,764,055

! 16. GROSS THERMAL ENERGY GENERATED (MWHI 2,357,239 g 48,772,330 L

789,170 7,383,410

17. GROSS ELECTRICAL ENERGY GENERATED (MWH)

N 759,108 7,127,378 46,837,851

18. NET ELECTRIC L ENERGY GENERATED (MWH)

I .

74.2 100.0 94.7

19. UNIT SERVICE FACTDR m .._

.- 100.0 94.7 74 2

20. UNIT AV AILABILITY FACTOR - -

98.4 94.4 65.7

21. UNIT CAPACITY FACTOR (USING MDC NET) .

ar 95s? - -- 91.7 -

~~

63.8 j 22. UNIT CAPACITY FACTDR (USING DER NET) n - 77; +

0.0 5.3 T((

23. UNIT FORCED OUTAGE RATE ,

]

24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DA1E, AND DURATION OF EACHlt SCHEDULED SHUTDOWN FOR REFUELING AND MAINTENANCE, ST ARTS 2/12/83, FOR E1GHT WEER DUTAGE.

25.1F SHUTDOWN AT END OF REPDRT PERIOD, ESTIMATED DATE OF STARTUPs FORECAST ACHIEVED

26. UNITS IN TEST ST ATUS (PRIOR TO COMMERCI AL OPERATIONis INITIAL CRITICALITY .- .

INITIAL ELECTRICITY. . ._ ---

COMMERCIAL OPERATION ._

' ' - ' ~ w -

-s> - - - , . _ _ _ , , _ , ,

v"C .

~5

[

rf UNIT SRUTDOWNS AND POWER REDUCTIONS DOCERT NO. 50 - 277 UNIT NARE PEACE BOTTOR UNIT 2 ,j j

= - .

.l DATE NOTENBER 10, 1982

~ ~

REPORT NORTE OCTOBER, 1982 CORPLETED BY PHILADELPHIA ELECTRIC C05PANY

~l

-l N.R.ALDEN '

ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISIDE-NUCLEAR _j TELEPHONE (215) 841-5022 2

l l l l l NETHOD OF l LICENSEE lSYSTERlCORPONENTl CODE l CAUSE AND ACTION TOCORRECTIVE EVENT l CODE l l lTYPElDURATIONlREASONISHUTTING DOWNl (5) l PREVENT RECURRENCE W3.l DATE l (1) l (R0035) l (2) l REACTOR (3) l REPORT 8 l (4) l 7 t l l l l l 1 I l 5 I 4 l .NA i RC I EEEEEE I STARTED LOAD REDUCTION FOR TEE ADJWSTRENT C 11 l 821022 l S l 00.0 l l l l l l OF THE CONTROL BOD PATTERN.

I l l l l l l l j I I l l 1

36.0 l B l 1 i NA l CB i PUNPIZ l CONTINUED TO SEUTDOWN AFTER & LON OIL [

12 l 821023 l Fl I I I LEVEL ALARN NAS RBCIETED ON TEE '24' l l l l 1 1 l l RECIRCULATION PURP.

l l l l l  ! l <

l l l l l l l l ,1 I 3 B1 l CC l TALTEI l CONTINUATION OF TER OUTAGE SINCE DURING TEE 60.0 1 1 1 I l RETURN TO SERTICE (AT APPROE. 800 PSI) , TER 1 12 l 821024 i FI l l l l l l l l 'J' R&IN STEAM LINE RELIEF TALTE OPENED l l l l v. ;

l l l l l l I I I l CAUSING & REACTOR SCRAR ON LON LITEL.

I I l l ,

l l l l t i I l i I 4 N& l RC l EEEEEE l LOAD REDUCTION FOR TER ADJDSTRENT OF TWE 5 l l 13 l 821029 l 5 1 00.0 l

! l l l 1 1 ----- l l I I i l l l I I I l l 96.0 l l I i l

w (3) (4)

(1) (2)

NETHOD EIRIBIT G - INSTRUCTIONS F - FORCED REASON 1 - NANUAL FOR PREPARATION OF DATA .

S - SCHEDULED & - EQUIPRENT FAILURE (EIPLAIN) 2 - MANUAL SCR&B. ENTRY SHEETS FOR LICENSEE .

B - RAINTENANCE OR TEST 3 - AUTOE& TIC SCR&R. EVENT REPORT (LER)

C - REFUELING 4 - OTHER (EITLAIN) FILE (EUREG-0161) m D - REGULATORY RESTRICTION E - OPER ATOR TR AINING + LICENSE RIARINATION (5)

F - A DRINISTR&TIVE ,

G - OPERATIONAL ERROR (EIPL&IN) IIRIBIT I - SARE SOURCE E - OTHER (EIPL&IN) c______ - .. .

, _m g- g-- q- 4_. - ;.__ v - - - - - - - - -- --- - - - - - - - -

l 1

l 1 ,

n UNIT SHUTDOWNS AND POWER REDUCTIDNS DDCKET No. 50 - 2Te _

I ,

UNIT NAME PEACH BOTTUM UNIT 3 DATE NDVEMBER 10, 1982 REPORT MONTH DC TOBER, 1982 CDNPLETED SY PHILADELPHI A ELECTRIC COMPANY W.N.ALDEN ENGINEE R-IN*C HARGE NUCLEAR SECTIDM GENERATION DIVISION-NUCLEAR '

i TELEPHONE (215) 841-5022 l l l l 1 METHOD DF l LICENSEE ISYSTENICDMPONENTl CAUSE AND CORRECTIVE I I T YP E l DU RA T I ON I RE A S DN I S HUT T I NG DOWN 1 EVENT l CDDE I CDDE i ACTIDN TD -

DATE i (131 (HOUR $ll (2) l REACTOR 43) l REPDRT s I (48 I (53 i PREVENT RECURRENCE ND.i 1 I I I I I I I i -

16 8 821015 1 5i DD.0 l- H l 4 l NA l RC l ZZZZZZ l LOAD REDUCTION FDR THE ADJUSTMENT DF THE l l l l l l CONTRDL RDO PATTERN.

l l l I I 1 1 I I I I I -

1 I- I i l l I '

I I 1 i i 1 - l 1 I I I i ,

i ,

}

i i >

} L (1) (2) (3) ,

(4)

! METHDD EXHIBIT G - INSTRUCTIDNS

! F - FORCED RE A SDN FDR PREPARATION OF DATA l A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL S - SCHEDULED 2 - MANUAL SCRAM.

!! 8 - MAINTENANCE DR TEST ENTRY SHEETS FDR LICENSEE- -

C - REFUELING 3 - AUTDMATIC SCRAM. EVENT REPDRT (LER)

D - REGULATORY RESTRICTIDN 4 - DTHER (EXPLAIN) FILE INUREG-0161) 1

! E - OPERATDR TRAINING + LICENSE EXANINATIDN (5)

F - ADMINISTRATIVE l G - OPERATIONAL ERADR (EXPLAIN) EXHIBIT I - SAME SDURCE er

, H - DTHER(EXPLAINI w

I

. . . AVERAGE DAILY UNIT POWER LEVEL DDCKET NO. 50 - 277 i

UNIT PEACH BOTTOM UNIT 2

==

DATE NOVEMBER 10, 1982 l COMPANY PHILADELPHIA ELECTRIC COMPANY


-  ?;

(

i W.M.ALDEN "

l ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLE AR l

i TELEPHONE (215) 841-5022 l MONTH OCTOBER 1982 6

l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL L ( MW E-N ET ) (MWE-NET) 1 1049 17 1050.

2 1051 18 1052 3 1052 19 1051 4- 1052 20 1049 5 1048 21 1052 G 1050 22- 1051 l

7 1054 23 50 ,

8 1055 24 0 9 1051 25 0 10 1049 26 0 I 11 1049 27 -

512 12 1052 28 968 -.

i n 13 1051 29 988 e i

14 1051 30 .. 738 s e

15 1052 31 993 J t l

10 1051 i J

  • s 3

- o

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE NOVEMBER 10, 1982 ,-

COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH OCTOBER 1982 l

l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) ( MW E -N E T )

1 1041 17 99'I i

I 2 1038 ~

18 1047 3 1036 19 1048 l

! 4 1033 20 1048 t

, 5 1028 21 1048 1

0 1027 22 -

1047 7 1027 23 1045 '

e i 8 1025 24 1037 L

9 1018 25 1038 I 10 1016 26 1032 i

} '

11 1017 27 1029

~

i 12 1014 28 1027 l

) 1 1

I 13 1010 29 1024

{

' 14 1006 30 1019  ?

s  ;

15 1010 31 3o'16 'h l 16 738 $

I

?

f l

PEACH BOTTOM ATOMIC POWER STATION Narrative Summary of Operating Experiencas October 1982 i s i

L UNIT 2 i

The unit began the month at full power. On October 22, during a power reduction for a control rod pattern adjustment, the "A" recirculation pump was manually tripped due to a low oil level alarm. A unit shutdown was completed with the generator i being removed from ,ervice at 3:12 a.m. on October 23. An entry into the drywell w6s made and oil was added to the pump motor lower bearing. Control rod withdrawal commenced at 6:35 a.m. on e October 24 and continued until 3:07 p.m. on October 24 when, with  !

the reactor at 832 psig, the "J" main steam relief valve opened.

q I

A reactor SCRAM occurred when the reactor vessel level dropped to 0 inches. The HPCI System was manually started before its f automatic start level of -40 inches was reached, in order to y promptly recover water level. An Unusual Event was declared because of the unplanned shutdown. The Unusual Event was y

i terminated at 5:40 p.m. on October 24. The "J" main steam relief l

valve was replaced and an inspection of its discharge piping in '

i the drywell and torus was mad 1. No structural damage was found.

( A reactor startup was begun and inerting of primary containment began after a drywell inspection at approximately 500 psig reactor pressure. A 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> extension had been granted by the NRC for the 90 hour0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> limit for opening of the primary containment i ventialation valves with the reactor pressure above 105 psig to accommodate this inspection. The Unit was returned to service on October 27 and reached full load at 3:00 p.m. on October 31.

UNIT 3 The unit began the month at full power. On October 15 reactor power was reduced for a control rod pattern adjustment and returned to full power on October 17. On October 20 the HPCI was removed from service for 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> to repair a steam leak on the HPCI steam supply line drain valve. Following repairs, the 1 g HPCI system was tested and returned to service. The unit ended h the month at full power.

l1 p

i O

e

p. . _

- - , ~ , - , , _ - , . . , _ , , _ , _ , , . , , ,

Nt$$cbm$bth

/

, Monthly Operating

- R3 port for October, 1982 e

REFUELING INFORMATION

1. Name of facility:

Peach Botton Unit 2

2. Scheduled date for next refueling shutdown:

October 15, 1983

3. Scheduled date for restart following refueling:

December 10, 1983

4. Will refueling or resumption of operation thereafter require

' a technical specification change or other license amendment?

j Yes i If answer is yes, what, in general, will these be?

I i

Technical Specifications to accommodate reload fuel.

Modifications to reactor core operating limits are expected, y 5. Scheduled date(s) for submitting proposed licensing action and supporting information:

September 10, 1983 5

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures

{

l None expected

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pools (a) Core - 764 Fuel Assemblies (b) Fuel Pool - 1170 Fuel Assemblies, 58 Fuel Rods d 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.

. 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

September, 1990

.-.----..-.......,.~,.;-. .__. _.

--.---~~~~n---.--- ..

Attcchment to Monthly Opercting R; port for Octcber, 1982 REFUELING INFORMATION

1. Name of facility Peach Botton Unit 3
2. Scheduled date for next refueling shutdown:

February 12, 1983

3. Scheduled date for restart following refueling:

April 5, 1983

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If answer is yes, what, in general, will these be?

Technical Specifications to accommodate reload fuel.

Modifications to reactor core operating limits are expected.

5. Scheduled date(s) for submitting proposed licensing action and supporting information December 24, 1982 s
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or rarformance analysis methods, significant changes i in fuel design, now operating procedures:

I

^

None expected

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pools (a) Core - 764 Fuel Assemblies (b) Fuel Pool - 928 Fuel Assemblies, 6 Fuel Rods

, 8. The prenent licensed spent fuel pool storage capacity and the size of. any increase'in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

k, The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.

. 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

September, 1991

._ .....-= - - - . - - - . - - - . - - -. . . - . . - - -