Requests Delay of Implementation Deadline for Training Licensed Operators on Emergency Plan Until 821215
ML20027E567
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/15/1982
From: Crouse R, Crouse R
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20027E555 List:
References
1-297, F03045882, F3045882, NUDOCS 8211150497
Download: ML20027E567 (2)


Text

-

Fo3o *s2#2_.

s' 1

PRINCIPAL STAFF q$dh of g STRA EHF Docket No. 50-346 A/PA lSP O

PSRP PAO.

Eit) lei (314 MPsos 34-4/adaiz h

License No. NPF-3 f

DESTP Serial No. 1-297

'il AcHue P. CRMEE OL FILE

/,,.,

U=

October 15, 1982 un $ 25S22' James G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

By this letter, Toledo Edison is formally notifying you that its annual commitment to train licensed operators at the Davis-Besse Nuclear Power Station, Unit 1 on the emergency plan is required to be extended.

The Davis-Besse Emergency Plan, Section 8, identifies that licensed operators will receive training on the plan and procedures "once a year".

Due to a series of circumstances, the annual 1982 emergency plan training for these operators has not been completed during the 15 month (12 + 25%)

scheduled period. The extended refueling / maintenance outage, specialized training required prior to startup, and previously scheduled simulator training, have combined to cause a delay in this training. Additionally, to ensure the utmost effectiveness, the format and content of the emer-gency plan training are being revised to be more responsive to the needs and requests of the licensed operators. This effort is currently being completed. The Nuclear Training Department plans to complete the training of all emergency response personnel, including licensed operators using this new 8-hour classroom lecture, multi-media course and also a hands-on scenario activity within the classroom. This is commencing on October 21, 1982. Due to the standard shift rotation, all personnel will not be completed until mid-December.

Toledo Edison feels this delay in no way degrades the capability of our personnel to respond in the event of an emergency. Major Procedure and Plan changes are included as required reading distributed to emergency response personnel to ensure their awareness of these matters.

Additionally, it has not been a full year since the licensed operators received an emergency planning review.

In January, 1982, prior to our annual emergency exercise, each shift of operators received a minimum four hour lecture / review on the Plan, Procedures, and equipment.

8211150497 821108

~

PDR ADOCK 05000346 F

PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43E52 OCT 2 pf 082

y 9

o Docket No. 50-346 License No. NPF-3 Serial No. 1-297 October 15, 1982 Page 2 An extension of the " annual" requirement until December 15, 1982, is required to allow the best presentation of material to the emergency response personnel.

If you require additional information on this matter, please contact Miss Hirsch, our Emergency Planning Supervisor, directly.

Very truly yours,