LILCO, November 9, 1982 9
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION l
Before the Atomic Safety and Licensing Board i
T I
In the Matter of
)
)
Docket No. 50-322-OL LONG ISLAND LIGHTING COMPANY
)
)
(Emergency Planning -
(Shoreham Nuclear Power Station,
)
Phase I)
Unit 1)
)
LILCO'S MOTION FOR
SUMMARY
DISPOSI* ION OF THE TRAFFIC CONGESTION ISSUES,..
EP 2(B) AND 5(B), AND THE AUGMENTATION OF ONSITE STAFF ISSUES, EP 5(B) AND 7(B) s I
I.
==
Introduction:==
Contentions and Legal Standards I
LILCO hereby moves, pursuant to 10 C.F.R. 5 2.74?b for summary disposition of the Phase emergency planning contentions having to do with traffic congestion, EP 2(B) and 5(B), and onsite augmention, EP 5(B) and 7(B).1/
Attached to I
this motion are a " Statement of Material Facts as to Which
\\
There Is No Genuine Issue To Be Heard on Contentions EP 2(B),
5(B), and 7(B)" (Attachment 1) and affidavits by Messrs.,
\\
1/
The Board has said that motions for summary disposition i should be filed at the same time as motions to strike testi-g mony.
See the transcript of November 2, 1982 at Tr. 12,581.
8211150482 B21109
~7 PDR ADOCK 05000322 G
PDR i
)
\\
I
~ I l
DiMascio, Lieberman, and Blauer supporting that statement i -
i l
(Attachments 2, 3, and 9).
s The contentions and applicable legal standards are as l
I follows:
EP 2(B):
MEDICAL AND PUBLIC HEALTH SUPPORT (SC, joined by NSC and SOC) t r
B.
Furthermore, LILCO has failed to l
adequately demonstrate that ground trans-portation (Plan at 6-16) is adequate for conveyance.of contaminated injured individuals to Central Suffolk Hospital under the congested traffic or radiolog-ical conditions that are likely to exist during a radiological emergency.
- Thus, LILCO has failed to sat sfy 10 OFR.
550.47(b)(12), 10 CFR Part 50, Appendix E,
Item IV.E.6, and NUREG 0654, Item II.L.4.
r The legal standards for EP 2(B) are that "[a]rrangements h
are made for medical services for contaminated injured l
I individuals" (10'C.F.R. 5 50.47(b)(12)); that "[ajdequate prb-visions shall be made and described for emergency facilities and equipment, including
[a]rrangements for transporta-tion of contaminated injured individuals from the site to spe-cifically identified treatment facilities outside the site boundary" (10 C.F.R. Part 50, Appendix E, Item IV.E.6); and that "[e]ach organization shall arrange for transporting victims of-radiological accidents to medical support facil-ities" (NUREG-0654, Rev.
1, Item II.L.4).
/
t
' EPS:
OFFSITE RESPONSE ORGANIZATION AND ONSITE RESPONSE AUGMENTATION (SC, joined by NSC and SOC)
Suffolk County contends that LILCO has failed to provide reasonable assurance that onsite assistance from offsite agencies will be forthcoming in the event of a radiological emergency at the Shoreham site (see, e.g.,
Plan at 5-8 and 6-15).
LILCO has therefore not met the requirements of 10 CFR $550.47(b)(1),
(2), (3), (8), (12) and (15), 10 CFR Part 50, Appendix E, Item A, and NUREG 0654.
In addition, LILCO has not demonstrated adequately that it will be able to augment its onsite emergency response staff in a timely manner (see Plan, Ch.
5).
LILCO has also, therefore, failed to meet the requirements of 10 CFR 550.47(b)(1) and (2).
Thus:
B.
LILCO has not adequately demonstrated the possible effects of traffic congestion during evacuation of the pop-ulation upon the ability of offsite personnel and/or onsite augmenting personnel to respond promptly to the Shoreham site.
The standards and criteria cited in contention EP 5 are SS 50.47(b)(1), (2), (3), (8), (12), and (15); Appendix E, Item II.A; and NUREG-0654.
These regulations and guidelines (except NUREG-0654, which is too lengthy to include) are Attachment 4 to this motion.
EP 7:
ONSITE RESPONSE ORGANIZATION (SC, joined by NSC and SOC)
Suffolk County contends that LILCO has not satisfactorily delineated the responsibilities of LILCO response personnel, nor has it demonstrated ade-quately that it will be able to augment
. its emergency response staff in a timely manner.
Thus, LILCO's emergency response plan is not in compliance with 10 CFR 5550.47(b)(1)(2)(3) and (8), 10 CFR Part 50, Appendix E, Items A and C, and NUREG 0654, Items II.A, B, C and H for the following reasons:
B.
Table 5-1 does not clearly demonstrate LILCO's ability to augment its staff within 30 minutes of declaration of an emergency and is not in compliance with Table B-1 of NUREG 0654.
The guideline for EP 7(B) is Table B-1 in NUREG-0654 (Attachment 5 to this motion).
Summary disposition is governed by 10 CFR 5 2.749.
The standard that LILCO must meet is to show that there is no
" genuine issue of fact" with respect to all or part of a contention.
Summary disposition has been viewed with approval by the Appeal Board as "an efficacious means of avoiding unnec-essary and possibly time-consuming hearings on demonstrably insubstantial issues," Wisconsin Electric Power Company (Point Beach Nuclear Plant, Unit 1), ALAB-696, 16 NRC (Oct.
1, 1982) (slip op. at 32), citing Houston Lighting and Power Co.
(Allens Creek Generating Station, Unit 1), ALAB-590, 11 NRC 542, 550 (1980).2/
2/
See also the Statement of Policy on Conduct of Licensing Proceedings, CLI-81-8, 13 NRC 452, 457 (1981) ("[B]oards should encourage the parties to invoke the summary disposition proce-dure on issues where there is no genuine issue of material fact so that evidentiary hearing time is not unnecessarily devoted to such issues.")
. The basis for this motion for summary disposition is that the material facts needed to decide these three contentions are relatively simple and, we believe, largely undisputed.
The effect of other traffic on the emergency vehi-cles can indeed be a complicated subject. involving computer models.
LILCO's consultant KLD has such a model, and so has the County's consultant Mr. Kanen (see Direct Testimony of Andrew C.
Kanen on Behalf of Suffolk County, Regarding Contentions EP 2B and EP 5B at 12, referring to computer simu-lations of traffic conditions).
But these details need not be litigated to resolve the Phase I issues, for the following reasons.
First, most of the travel of emergency vehicles is toward the plant, while the evacuating public would move away; that is, emergency vehicles would be on one side of the road traveling toward the plant while evacuating vehicles would be on the other side moving away from the plant (the "counterflow" idea);3/
Second, most 3/
To be sure, the County's witness foresees two ways in which traffic toward the plant could be delayed.
One is the slowdown of traffic toward the station caused by checkpoints at a perimeter; the other is the effect of people returning home before evacuating.
In short, Mr. Kanen's testimony predicts congestion if (1) emergency vehicles travel to the site during a brief " window" of time after the working public has been notified and starts for home but before.most people have reached home and turned around to evacuate or (2) emergency vehicles come from outside the evacuation area after police have set up a perimeter and traffic has started to back up.
But even accepting these scenarios, the delay envisioned by Mr.
l Kanen is immaterial, as we show in sections III, V,
and VI below.
of the emergency personnel (LILCO personnel and the police, certainly) would be notified and head for the plant well before evacuation of the public was underway.
Third, even if the predicted congestion in the County's testimony is accepted without question, the delays it would cause are immaterial --
they do not cause LILCO to fall out of compliance with the NRC requirements.
This third point is the most important.
There is simply no indication in the NRC regulations that traffic congestion that might slow down emergency vehicles renders an applicant's emergency planning arrangements unacceptable.
The legal stand-ards cited by the County are that arrangements (or " adequate",
arrangements) have been made (10 C.F.R. 5 50.47(b)(12); 10 C.F.R. Part 50, App.
E, IV.E.6; NUREG-0654, Rev.
1, II.L.4),
that responsibilities of local organizations have been assigned and established (10 C.F.R. 5 50.47(b)(1)), that timely augmentation of response capabilities is available (10 C.F.R. 5 50.47(b)(2)), that arrangements for effectively using assist-ance resources have been made (10 C.F.R. 5 50.47(b)(3)), and that offsite organizations for coping with emergencies have been described (10 C.F.R. Part 50, App.
E, II.A).
LILCO has done these things.
At some point, it is true, a showing of traffic congestion might be capable of demonstrating that the applicant's arra'~ aments are not (for example) " adequate" (if
. traffic congestion were shown to prevent vehicles from getting to a site altogether, for example), but the County's evidence is not of that sort.
Even accepting the traffic congestion predicted by the County's witness as correct, the congestion is simply too short in duration or too late in getting started to make a material difference, as we shall point out in the sections of this motion that follow.
II.
Ambulances going to the plant For the Shoreham Station, ambulances are supplied by local volunteer fire departments.
LILCO's agreement for ambu-lance service is with the Wading River Fire Department (1),4/
which is about a mile and a half from the Shoreham Station through a. rural area (3,4).
If Wading River could not raspond, other volunteer fire departments party to the Mutual Aid Agreement are available (9).
Ambulances traveling to the plant from Wading River (or any other fire department) would be traveling counter to the flow of evacuating traffic, which would be moving away from the plant (5).
If no ambulance could get to the plant at all, an injured person could be put into a station vehicle and driven to the hospital by a LILCO employee (10).
4/
Numbers in parentheses refer to the numbered " material facts" in Attachment 1 to this motion.
_8-III.
Ambulances going from the plant to Central Suffolk Hospital LILCO's emergency plan calls for contaminated injured people to be taken from the site to Central Suffolk Hospital, about 10 miles southeast of Shoreham along a route about 12 miles long (11, 12, 14).
The preferable route is eastbound P.long North Country Road and Sound Avenue to Roanoke Avenue, then south along Roanoke Avenue to the hospital (13).
This route is not a major evacuation route (15).
Suffolk County's witness Mr. Kanen testifies that congestion would begin to have a significant impact on travel of emergency vehicles from the Shoreham Station to Central Suffolk Hospital approximately one to one-and-a-half hours after public notification and that the delay likely to be expe-rienced by a single vehicle could range from 15 minutes to one hour of congestion time (Direct Testimony of Andrew C. Kanen on Behalf of Suffolk County, Regarding Contentions EP 2B and EP SB at 14-15).
This testimony appears to say, then, that the trip to the hospital could take as long as one hour plus the ordinary travel time for the 12-mile trip.
LILCO submits that there is no requirement that an applicant show that ambulances must be able to get to the designated hospital quicker than that; even if it is true that the delay would be one hour, LILCO still
. would have complied with the regulations.
Therefore, on the basis of the County's own testimony, LILCO believes it is entitled to summary disposition on this issue.5/
IV.
Fire trucks going to the plant The same considerations that govern ambulances going to the plant (except for the use of onsite vehicles as a last resort) govern fire trucks, since both types of vehicles are supplied by the Wading River Fire Department a mile and a half from the plant or, barring that, by other fire departments party to the Mutual Aid Agreement (22).
V.
Police cars going to the plant LILCO procedure SP 69.009.01, " Notifications," requires that the Suffolk County EOC and the Suffolk County police headquarters be notified within 15 minutes of the declaration of an emergency (23),s/ well before the onset of any 5/
The County is apparently contending in contention EP 2(A)(1) that Central Suffolk Hospital is too close to the Shoreham Station and in EP 2(B) that it will take too long to get to that hospital.
Choosing a hospital farther away would, of course, only aggravate any delay in getting to the hospital, s/
Presumably police headquarters would radio mobile police units to respond to the site, and the mobile units closest to the site would be assigned to respond.
But this is beyond LILCO's control, and we do not know whether the County will dispute it.
I i
1
congestion.
Also, these police units would be traveling toward the station, whereas evacuating traffic would be traveling away from the station (24).
Finally, Suffolk County police could respond by helicopter or boat if necessary (25).
VI.
Offsite LILCO personnel going to the plant The issue in contention EP 7(B) is whether sufficient numbers of LILCO personnel can respond in sufficient time to meet the recommendations of Table B-1.
Part of the evidence is simply the normal commuting times of LILCO employees, as reported by those employees and provided on Attachment 7(B)-9 to LILCO's written testimony (Attachment 6 to this motion) (26, 27).
In order to make this evidence clearer, we have combined the commuting times with the Table B-1 recommendations on to this motion.7/ shows unequivocally that LILCO meets its commitmentg/ in section 5.2 of the onsite emergency plan 7/
The information about the " Rad Waste Operator" category was inadvertently left out of Attachment 7(B)-9.
It is supplied, from LILCO records, in Attachment 7 to this motion.
We have also added the distances the employees live from the plant where they were available; the distances show that some of the employees could walk to the site if they had to.
Due to the press of time, neither the Rad Waste Operator travel times nor the distances are covered by the attached affidavits.
g/
Contention EP 7(B) refers specifically to the 30-minute column of Table B-1, and LILCO admittedly has not committed to meet that 30-minute recommendation at all times in the future.
(footnote continued)
. (Attachment 2 to SNRC-764, letter of September 1, 1982, from LILCO's J.
L. Smith to the NRC's Mr. Harold R. Denton):
The augmentation of the onshift personnel shall be accomplished as soon as possible upon notification, and, based upon the average, normal one-way commute time for these personnel, meets the objectives of NUREG-0654 Table B-1 for a 30sto 60 minute response Suffolk County filed no testimony on contention EP 7(B) as such, but presumably the County contends that traffic congestion may delay the arrival of the onsite augmentation personnel.
Assuming this is the County's position, it has two flaws.9/
First, the County's witness testifies that if offsite personnel had to travel to the site at any time subsequently to approximately 1 1/2 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after public notification of an emergency, they would encounter substantial congestion (Direct Testimony of Andrew C. Kanen at 16).
Since the offsite (footnote continued)
LILCO's position is that its commitment to meet "the objectives of NUREG-0654 Table B-1 for a 30 to 60 minute response," plus the measures it has taken to facilitate a prompt response (listed in the attached affidavit of H. Mark Blauer), plus the present normal commuting times in Attachment 6, are sufficient to meet the objectives of Table B-1 and to comply with NRC regulations.
This position, LILCO believes, is consistent with NRC Staff practice and with the " Recommended Requirements" of SECY 82-111 (Attachment 7(B)-8 to LILCO's written testimony).
9/
Also, the onsite augmentation personnel will be traveling toward the station, whereas evacuating traffic will be traveling away.
This is not a complete answer to the County, however, because the County's witness predicts some traffic effects that may delay travel toward the plant, as noted above.
- personnel would be informed before the public was notified, and since the offsite people can arrive at the site within one hour, even if the County's testimony is correct it does not demonstrate lack of compliance with Table B-1.
Second, LILCO beljeves that the times in Table B-1 are for normal conditions, not highly congested conditions such as the County says would occur during an evacuation.
In LILCO's view this interpretation is supported by Attachment 7(B)-7 to LILCO's written testimony (Attachment 8 to this motion).
VII.
Conclusion The issue of what routes to use for evacuation of the public and how much traffic will result is a complex one involving analysis by computer models.
But LILCO believes those models need not be litigated in Phase I of the emergency planning case.
Phase I issues can be handled much more simply by recog-nizing (1) that police and LILCO personnel would be called to the site well in advance of the public evacuation, (2) that fire trucks and ambulances are garaged close to the station and would travel counter to evacuating traffic to get to the station, and (3) that the route to the hospital from the station is not a major evacuation route and therefore is not likely to be congested with traffic.
Finally, it is
- _ =
t s appropriate to conclude that even if traffic delay of the duration predicted by the County's testimony occurs, it does i
not establish noncompliance with the requirements that LILCO make arrangements for ambulances, police, fire and onsite augmentation.
Respectfully submitted, LONG ISLAND LIGHTING COMPANY l
WI7' By mes N. Christman Hunton & Williams 707 East Main Street P.O.
Box 1535 Richmond, Virginia 23219 DATED:
November 9, 1982 i
LILCO, November 9, 1982 CERTIFICATE OF SERVICE In the Matter of LONG ISLAND LIGHTING COMPANY (Shoreham Nuclear Power Station, Unit 1)
Docket No. 50-322 (OL)
I hereby certify that copies of LILCO's Motion for Summary Disposition of the Traffic Congestion Issues, EP 2(B) and,5(B), and the Augmentation of Onsite Staff Issues, EP 5(B) and.7(B), were served upon the following by first-class mail, postage prepaid, by Federal Express (as indicated by an aster-isk), or by hand (as indicated by two asterisks), on November 9, 1982:
Lawrence Brenner, Esq.**
Secretary of the Commission Administrative Judge U.S.
Nuclear Regulatory Atomic Safety and Licensing Commission Board Panel Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Washington, D.C.
20555 Appeal Board Panel U.S. Nuclear Regulatory Dr. Peter A. Morris **
Commission Administrative Judge Washington, D.C.
20555 Atomic Safety and Licensing Board Panel Atomic Safety and Licensing U.S.
Nuclear Regulatory Board Panel Commission U.S.
Nuclear Regulatory Washington, D.C.
20555 Commission Washington, D.C.
20555 Dr. James H. Carpenter **
Administrative Judge Daniel F.
Brown, Esq.
Atomic Safety and Licensing Attorney Board Panel Atomic Safety and Licensing U.S.
Nuclear Regulatory Board Panel Commission U.S. Nuclear Regulatory Washington, D.C.
20555 Commission Washington, D.C.
20555 1
n-.
. Bernard M. Bordenick, Esq.**
David J.
Gilmartin, Esq.
David A.
Repka, Esq.
Attn:
Patricia A.
Dempsey, Esq.
U.S. Nuclear Regulatory County Attorney Commission Suffolk County Department of Law Washington, D.C.
20555 Veterans Memorial Highway Hauppauge, New York 11787 Herbert H. Brown, Esq.**
Stephen B.
Latham, Esq.*
Lawrence Coe Lanpher, Esq.
Twomey, Latham & Shea Karla J.
Letsche, Esq.
33 West Second Street Kirkpatrick, Lockhart, Hill, P.
O.
Box 398 Christopher & Phillips Riverhead, New York 11901 8th Floor 1900 M Street, N.W.
Ralph Shapiro, Esq.*
Washington, D.C.
20036 Cammer and Shapiro, P.C.
9 East 40th Street Mr. Mark W. Goldsmith New York, New York 10016 Energy Research Group 4001 Totten Pond Road Howard L.
Blau, Esq.
Waltham, Massachusetts 02154 217 Newbridge Road Hicksville, New York 11801 MHB Technical Associates 1723 Hamilton Avenue Matthew J.
Kelly, Esq.
Suite K State of New York San Jose, California 95125 Department of Public Service Three Empire State Plaza Mr. Jay Dunkleberger Albany, New York 12223 New York State Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 A
r; ! O ames N.
Christman Hunton & Williams 707 East Main Street P.O.
Box 1535 Richmond, Virginia 23212 DATED:
November 9, 1982
Attechmsnt 1 LILCO, November 9, 1982 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of
)
)
Docket No. S0-322 (OL)
LONG ISLAND LIGHTING COMPANY
)
(Emergency Planning -
)
Phase II)
Shoreham Nuclear Power Station,
)
Unit 1)
)
STATEMENT OF THE MATERIAL FACTS AS TO WHICH THERE IS NO GENUINE ISSUE TO BE HEARD ON CONTENTIONS EP 2(B), S(B), AND 7(B)
AMBULANCES I.
From the fire station to the plant.
A.
From Wading River to the plant 1.
LILCO has an agreement with the Wading River Fire Department to provide ambulances.
2.
The route from the Wading River Fire Department to the Shoreham Station is westward along North Country Road to the site.
- 3. The distance from the Wading River Fire Department to the site along the route described above is about 1 1/2 miles.
. 4.
This 1 1/2 mile stretch of road is rural and the surrounding area sparsely populated.
5.
Evacuating vehicles will move away from the plant, while ambulances from Wading River will go toward the plant.
B.
From other fire departments to the plant 6.
Other fire departments in the SNPS vicinity are the following:
(1)
Rocky Point Fire Department (2)
Ridge Fire Department Substation (3)
Jamesport Fire Department (4.)
Miller Place Fire Department (5)
Manorville Fire Department (6)
Riverhead Fire Department.
7.
Two of these fire departments (nos. 1-2 above) are within five miles of the Shoreham Station; two of them (nos. 4 and 5) are 5 to 10 miles from the plant; one of them (no. 6) is outside the 10-mile EPZ.
8.
The above fire departments are parties to the Mutual Aid Agreement with the Wading River Fire Department.
9.
In the event the Wading River Fire Department is j
unable to supply an ambulance, the Mutual Aid Agreement calls for the other member departments to send ambulances.
l
. 10. As a last resort, LILCO vehicles are available at the Shoreham Station and could be used to transport contaminated injured personnel to the hospital.
II.
From the plant to the hospital
~11. The LILCO plan calls for contaminated injured i
people from the Shoreham Station to be transported to Central Suffolk Hospital.
- 12. Central Suffolk Hospital is located about 10 miles southeast of the Shoreham site.
i
- 13. The preferable route from Shoreham to Central Suffolk Hospital is eastbound along North Country Road and Sound Avenue to Roanoke Avenue, then south along Roanoke Avenue to the hospital.
- 14. The route described above is about 12 miles long.
- 15. The portion of Sound Avenue that would be used by ambulances is not an evacuation route and is unlikely to be 1
heavily congested during an evacuation.
- 16. The distance from Sound Avenue to the hospital along Roanoke Avenue is about 3 miles.
- 17. Roanoke Avenue is unlikely to be congested.
4
-,.w.--
4_
1.8. An alternate route from the Shoreham Station to the hospital would be turning south onto Wading River Manorville Road and traveling to the Long Island Expressway, then east to Route N.Y. 25, then east to Roanoke Avenue, then North on Roanoke Avenue to the hospital.
- 19. Another route to the hospital is east on Route 25A to Route 25, then east to Roanoke Avenue, then North on Roanoke Avenue to the hospital.
- 20. The ambulances are equipped with two-way radios and can communicate with suffolk County Medical Control for information regarding traffic congestion.
- 21. The Wading River Fire Department ambulance has responded to automobile accidents on local highways during highly congested conditions in summer peak traffic and has succeeded in conveying victims to the hospital in a timely manner (see the NRC Staff Supplemental Testimony of John Sears Regarding Onsite Emergency Planning (Phase I) at 13).
FIRE TRUCKS
- 22. The fire trucks would depart for the Shoreham Station from the same fire departments and same locations as the ambulances.
- POLICE CARS
- 23. LILCO procedure SP 69.009.01, Rev. O,
" Notifications," requires that the Suffolk County Emergency Operations Center and Suffolk County police headquarters be notified by means of a " hotline" within 15 minutes of the declaration of an emergency.
- 24. Police units would travel toward the station, whereas evacuating vehicles would travel away from the station.
- 25. Suffolk County police could respond by helicopter or boat if necessary.
VEHICLES OF LILCO PERSONNEL AUGMENTING THE ONSITE STAFF
- 26. The LILCO employees who might be called to augment the onsite staff are listed in Attachment 6 accompanying this Statement.
- 27. Each of these individuals was asked to give his
" normal one-way commuting time" from home to the Station, and he responded as indicated under column 4 in Attachment 6,
" Normal commute time."
- 28. Procedure SP 69.009.01, Rev.
O,
" Notifications,"
requires that emergency response personnel be notified immediately following notification of the Suffolk County EOC.
i 4
. 29. Once notified, LILCO offsite personnel are to respond immediately if required.
- 30. LILCO site augmentation personnel will be traveling toward the station, whereas evacuating vehicles will be traveling in the opposite direction.
MEASURES TAKEN BY LILCO TO FACILITATE ONSITE AUGMENTATION
- 31. LILCO has instituted a duty officer system; certain personnel who might be needed in an emergency are required, on a rotating basis, to be on call.
- 32. Senior management personnel (those 8 people indicated on Attachment 6 accompanying this affidavit) are assigned pagers (" beepers").
- 33. Those people designated to assume the Emergency Director role will have two-way radios installed in their cars, permitting direct communication with the Main Control Room.
- 34. Conference call capability has been provided so that a single phone call from the Control Room will connect several key personnel at once.
- 35. Automatic card dialer capability allows the communicators at the site to dial offsite personnel simply by inserting a card into the phone.
Atti.shmsnt 2 o
LILCO, November 9, 1982 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board o
In the Matter of
)
)
Docket No. 50-322-OL LONG ISLAND LIGHTING COMPANY
)
)
(Emergency Planning -
(Shoreham Nuclear Power Station,
)
Phase I)
Unit 1)
)
AFFIDAVIT OF NICHOLAS J.
DiMASCIO ON EMERGENCY VEHICLES State of New York )
) to wit:
County of Suffolk )
My name is Nicholas J. DiMascio.
I am Assistant Health Physics Engineer at the Shoreham Nuclear Power Station, and in that capacity I am responsible for the development of many station radiation protection programs and activities.
I have also been assigned the job of Onsite Emergency Planning Coordinator.
My duties include the preparation of the onsite emergency plan and the site Emergency Plan Implementing Procedures for compliance with the guidance of NUREG-0654, Rev.
1.
I am also a member of the Wading River Fire Department.
I
. live in Wading River, about 1 1/2 miles from the Shoreham Station.
The following facts are true and correct to the best of my knowledge and belief; they are numbered consistent with the
" Statement of the Material Facts as to Which There Is No Genuine Issue To Be Heard on Contentions EP 2(B), 5(B), and 7(B)," dated November 9, 1982.
AMBULANCES I.
From the fire station to the plant.
A.
From Wading River to the plant 1.
LILCO has an agreement with the Wading River Fire Department to provide ambulances.
2.
The route from the Wading River Fire Department to the Shoreham Station is westward along North Country Road to the site.
- 3. The distance from the Wading River Fire Department to the site along the route described above is about 1 1/2 miles.
4.
This 1 1/2 mile stretch of road is rural and the surrounding area sparsely populated.
. 5.
Evacuating vehicles will move away from the plant, while ambulances from Wading River will go toward the plant.
B.
From other fire departments to the plant 6.
Other fire departments in the SNPS vicinity are the following:
(1)
Rocky Point Fire Department (2)
Ridge Fire Department Substation (3)
Jamesport Fire Department (4)
Miller Place Fire Department (5)
Manorville Fire Department (6)
Riverhead Fire Department.
7.
Two of these fire departments (nos. 1-2 above) are within five miles of the Shoreham Station; two of them (nos. 4 and 5) are 5 to 10 miles 'from the plant; one of them (no. 6) is outside the 10-mile EPZ.
8.
The above fire departments are parties to the Mutual Aid Agreement with the Wading River Fire Department.
9.
In the event the Wading River Fire Department is unable to supply an ambulance, the Mutual Aid Agreement calls for the other member departments to send ambulances.
. 10.
As a last resort, LILCO vehicles are available at the Shoreham Station and could be used to transport contami-nated injured personnel to the hospital.
II.
From the plant to the hospital 11.
The LILCO plan calls for contaminated injured peo-pie from the Shoreham Station to be transported to Central Suffolk Hospital.
12.
Central Suffolk Hospital is located about 10 miles southeast of the Shoreham site.
13.
The preferable route from Shoreham to Central Suffolk Hospital is eastbound along North Country Road and Sound Avenue to Roanoke Avenue, then south along Roanoke Avenue to the hospital.
14.
The route described above is about 12 miles long.
16.
The distance from Sound Avenue to the hospital along Roanoke Avenue is about 3 miles.
17.
Roanoke Avenue is unlikely to be congested.
18.
An alternate route from the Shoreham Station to the hospital would be turning south onto Wading River Manorville Road and traveling to the Long Island Expressway, then east to
. Route N.Y. 25, then east to Roanoke Avenue, then North on Roanoke Avenue to the hospital.
19.
Another route to the hospital is east on Route 25A to Route 25, then east to Roanoke Avenue, then North on Roanoke Avenue to the hospital.
20.
The ambulances are equipped with two-way radios and can communicate with Suffolk County Medical Control for information regarding traffic congestion.
21.
The Wading River Fire Department ambulance has responded to automobile accidents on local highways during highly congested conditions in summer peak traffic and has succeeded in conveying victims to the hospital in a timely manner (see the NRC Staff Supplemental Testimony of John Sears Regarding Onsite Emergency Planning (Phase I) at 13).
FIRE TRUCKS 22.
The fire trucks would depart for the Shoreham Station from the same fire departments and same locations as the ambulances.
POLICE CARS 23.
LILCO procedure SP 69.009.01, Rev.
O,
" Notifications," requires that the Suffolk County Emergency Operations Center and Suffolk County police headquarters be notified by means of a " hotline" within 15 minutes of the declaration of an emergency.
24.
Police units would travel toward the station, whereas evacuating vehicles would travel away from the station.
25.
Suffolk County police could respond by helicopter or boat if necessary.
VEHICLES OF LILCO PERSONNEL AUGMENTING THE ONSITE STAFF 26.
The LILCO employees who might be called to augment the onsite staff are listed in Attachment 6 accompanying this Statement.
27.
Each of these individuals was asked to give his
" normal one-way commuting time" from'home to the Station, and he responded as indicated under column 4 in Attachment 6,
" Normal commute time."
28.
Procedure SP 69.009.01, Rev.
O,
" Notifications,"
requires that emergency response personnel be notified immediately following notification of the Suffolk County EOC.
3
,a
. 7 29.
Once notified; _ LILCO offsite personnel are.to respond immediately if required.
4 I
Date Name i
Subscribed and sworn to before me on the day of 1982.
Notary Public 1
/
1 1
i i
/
e Attachmsnt 3 x
LILCO, November 9,i,'1982 i
y UNITED STATES OF AMERICA 3
NUCLEAR REGULATORY COMMISSION j
i l
Before the Atomic Safety and Licensing Board s
In the Matter of
)
)
Docket No. 50-322-OL LONG ISLAND LIGHTING COMPANY
)
)
(Emergency Planning -
(Shoreham Nuclear Power Station,
)
Phase I Unit 1
)
)
AFFIDAVIT OF EDWARD LIEBERMAN ON TRAFFIC CONGESTION t
State of New York )
) to wit:
County of Suffolk )
My name is Edward Lieberman.
My firm, KLD Associates, Inc., has been retained by LILCO to do evacuation traffic studies for the Shoreham emergency planning effort.
From the surveys conducted in connection with this work, I am familiar with the roads that would be used in an evacuation.
The following facts are true and correct to the best of my knowledge and belief; they are numbered consistent with the
" Statement of Facts as to Whic. ; hsre Is' No Genuine Issue To Be Heard on Contentions EP 7 s
S :> ), and 7(B)," dated November 1
f 9,
1982.
?
t l
. AMBULANCES I.
From the fire station to the plant.
A.
From Wading River to the plant 2.
The route from the Wading River Fire Department to the Shoreham Station is westward along North Country Road to the site.
\\
- 3. The distance from the Wading River Fire Department to the site along the route described above is about 1 1/2 miles.
4 4.
This 1 1/2 mile stretch of road is rural and the surrounding area sparsely populated.
I S.
Evacuating vehicles will move away from the plant, while ambulances from W' ding River will go toward the II.
From the plant to the hospital 12.
Central Suffolk Hospital is located about 10 miles i
southeast of the Shoreham site.
13.
The preferable route from Shoreham to Central Suffolk Hospital is eastbound along North Country Road and Sound Avenue to Roanoke Avenue, then south along Roanoke Avenue to the hospital.
t
4 14.
The route described above is about 12 miles long.
15.
The portion of Sound Avenue that would be used by ambulances is not an evacuation route and is unlikely to be heavily congested during an evacuation.
16.
The distance from Sound Avenue to the hospital along Roanoke Avenue is about 3 miles.
17.
Roanoke Avenue is unlikely to be congested.
18.
An alternate route from the Shoreham Station to the hospital would be turning south onto Wading River Manorville Road and traveling to the Long Island Expressway, then east to Route N.Y. 25, then east to Roanoke Avenue, then North on Roanoke Avenue to the hospital.
19.
Another route to the hospital is east on Route 25A to Route 25, then east to Roanoke Avenue, then North on Roanoke Avenue to the hospital.
POLICE CARS 24.
Police units would travel toward the station, whereas evacuating vehicles would travel away from the station.
o VEHICLES OF LILCO PERSONNEL AUGMENTING THE ONSITE STAFF 30.
LILCO site augmentation personnel will be traveling toward the station, whereas evacuating vehicles will be traveling in the opposite direction.
Date Name j
Subscribed and sworn to before me on the day of 1982.
Notary Public m-
--y-.,
. --,er p.-
+
y-+
-n r-e-
.,-.+
ATTACHMENT 4
^
)k 6-([
A9.
(Di Mascio, Lieberman]
10 C.F.R. 5 50.47(b)(1):
(b) The onsite and offsite emergency response plans for nuclear power reactors must meet the following standards [ footnote omitted):
(1) Primary responsibilities for emergency response by the nuclear facility licensee and by State and local organizations within the Emergency Planning Zones have been assigned, the emergency responsibilities of the various supporting organizations have been specifically established, and each principal response organization has staff to respond and to augment its initial response on a continuous basis.
5 50.47(b)(2):
(2) On-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to f
provide initial facility accident response
(
in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified.
5 50.47(b)(3):
(3) Arrangmentc for requesting and effectively using assistance resources have been made, arrangements to accommodate State and local staff at the licensee's near-site Emergency Operations Facility have been made, and other organizations capable of augmenting the planned response have been identified.
5 50.47(b)(8):
(8) Adequate emergency facilities and j
equipment to support the emergency response j
are provided and maintained.
j i
4
L p'
~7-(,
5 50.47(b)(12):
(12)
Arrangements are made for medical services for contaminated injured individuals.
5 50.47(b)(15):
(15)
Radiological emergency response training is provided to those who may be called on to assist in an emergency.
Appendix E, II.A:
As a minimum, the following items shall be described:
A.
Onsite and offsite organizations for coping with emergencies and the means for-notification, in the event of an emergency, of persons assigned to the emergency organizations.
(
Q10. Considering the possible effects of traffic congestion, in your judgment does the LILCO emergency plan fail to comply with any of these regulations?
A10. [Di Mascio, Lieberman]
No.
l
^
ichte B-1 MINIMUM STARRING REIRllRLMENTS FOR NRC LICENSEES FOR NUCLEAR POWETTilhTEH[lidLNCIES (See B.S.)
Position Title On Capability for Additions Major Functional Area Location Major Tasks or Expertise Shif t*
30 min 60 min m
Plant Operations and g4 Assessment of Shift Supervisor (SRO) 1 Shift Foreman (SRO) 1 y
Operational Aspects Control Room Operators 2
g Auxiliary Operaters 2
N Emergency Direction and Shift Technical Advisor, 1**
y Control (Emergency Shift Supervisor or
,t; Coordinator)***
designated facility manager Notification /
Notify licensee, State 1
1 2
Comun ica t t orf * **
local and Federal personnel & maintain comunication e
Radiological Accident Emergency ~ Operations Senior Manager ti 1
Assessment and Support Facility (EOF) Director of Operational Accident Offsite Dose Senior Health Physics Assessment Assessment (llP) Expertise 1
Offsite Surveys 2
2 Onsite (out-of-plant) 1 1
In-plant surveys HP Technicians 1
1 1
Chemistry / Radio-Rad / Chem Technicians 1
I chemistry Plant System Technical Support Shift Technical Advisor 1
Engineering, Repair and Corrective Actions Core /Thennal Hydraulics 1
Electrical 1
Mechanical 1
Repair and Corrective Mechanical Maintenance /
1**
1 Actions Rad Waste Operator 1
Electrical Maintenance /
1**
I I
i Instrument and Control IIAC) lechnician 1
f.
4 e
a i
Table B-1 (contd)
Position Title On Capability for Additions
__ Major functional Area Major Tasks or Expertise Shift
- 30 min 60 min Protective Actions Radiation Protection:
IIP Technicians 2**
2 2
(In-Plant) a.
Access Control b.
IIP Coverage for repair, corrective actions, search and rescue first-aid & firefighting c.
Personnel monitoring d.
Dosimetry Fire Brigade Local Support Firefighting per Technical Spectfications a
2**
Local Support i
Rescue Operations j
and First-Ald Site Access Control Security, firefighting Security Personnel All per and Personnel comunications, personnel Security plan
,m Accountability accountability Total 10 11 15 e
Notes:For each unaffected nuclear unit in operation, maintain at least one shift foreman, one control room operator and one auxiliary operator except that units sharing a control room may share a shif t foreman if all functions are j
i covered.
Hay'be provided by shift personnel assigned other functions.
Director Overall direction of facility response to be assumed by E0F director when all centers are fully manned.
of minute-to-minute facility operations remains with s >ninr manager in technical support center or control room.
- May be performed by engineering aide to shift supervisor.
O i
I D
d
Response Time Survey 1
2 3
4 5
Normal Major functional Position LILCO personnel commute area title or expertise to fill position time Beeper l
Notifications /
N/A Individual 1 20 min.
no Communications Individual 2 20 min.
no Individual 3 30 min.
no Individual 4 40 min, no Individual 5 45 min.
no Individual 6 75 min.
no Rad Accident Senior Mgr.
Individual 1 30 min.
yes Assessment and Individual 2 30 min.
yes Support of Oper-Individual 3 50 min.
yes ational Accident Assessment ba Senior Health Individual 1 18 min.
yes Physics Expertise Individual 2 30 min.
yes g
Individual 3 5 min.
yes g
5 m
HP Technicians Individual 1 13 min.
no Individual 2 15 min.
no Individual 3 15 min.
no Individual 4 15 min.
no Individual 5 15 min.
no
1 2
3 4
5 Normal Major functional Position LILCO personnel commute 4
area title or expertise to fill position time Beeper Individual 6 20 min.
no Individual 7 25 min.
no Individual 8 35 min.
no i
Individual 9 45 min.
no 4
Rad Chem Individual 1 15 min.
no Technicians Individual 2 10 min.
no Individual 3 20 min.
no Individual 4 30 min.
no Individual 5 40 min.
no Individ.ual 6 45 min.
no Individual 7 45 min.
no Individual 8 45 min.
no Individual 9 60 min.
no Individual 10 60 min.
no Individual 11 60 min.
no Plant System Core / Thermal Individual 1 25 min.
yes Engineering, Hydraulics Individual 2 10 min, no Repair and Cor-Individual 3 15 min.
no rective Actions Electrical Individual 1 5 min.
yes Individual 2 45 min.
no
1 2
3 4
5 Normal Major functional Position LILCO personnel commute area title or expertise to fill position time Beeper Mechanical Individual 1 25 min.
no Individual 2 8 min.
no Electrical and Mechanics A1 i
Mechanical Maintenance Individual 1 20 min.
no Individual 2 20 min.
no Individual 3 20 min.
no Individual 4 25 min.
no Individual 5 30 min.
no Individual 6 30 min.
no Individual 7 38 min.
no Individual 8 40 min.
no Individual 9 40 min.
no Individual 10 40 min.
no Individual 11 40 min.
no Individual 12 45 min.
no Individual 13 66 min.
no j
Individual 14 75 min.
no Mechanics B_1 Individual 1 4 min.
no Individual 2 7 min.
no Individual 3 10 min, no Individual 4 15 min.
no Individual 5 20 min.
no I
s, 1
2 3
4 5
Normal Major functional Position LILCO personnel commute area title or expertise to fill position time Beeper Individual 6 20 min.
no Individual 7 30 min.
no Instrumentation Individual 1 5 min.
no and Control Individual 2 8 min.
no Individual 3 20 min.
no Individual 4 20 min.
no Individual 5 25 min.
no Individual 6 25 min.
no Individual 7 25-30 min.
no Individual 8 25-30 min.
no Individual 9 30 min.
no Individual 10 40 min.
no Individual 11 45 min.
no Individual 12 45-60 min.
no Individual 13 60 min.
no Individual 14 60 min.
no Individual 15 65 min.
no Individual 16 75 min.
no Individual 17 90 min.
no
Table B-1 Augmentation Guidel ines Compa red to LILCO Personnel No rma l Commutino Times
" Functional Area" or " Major Tasks" o r "Posi t ion T i tle Table B-1 Table B-1 Table B-1 or Expertise" On Shift 30-minute LILCO 60-minute LILCO from Table B-1 J/
Cuideline 2/
Guideline Capability }/
Guideline Capability
- 1. Shift Supe rv i so r 1
- 2. Shi f t Foreman 1
- 3. Control Room Op-2 e ra tors
- 4. Aux i l ia ry Ope ra-2 tors
- 5. Shift Technical 1**
Advisor
- 6. Notification /
1 1
20 min.(15 mi.)
2 40 min.(25 mi.)
Communication 20 min.( 6 mi.)
45 min.(20 mi.)
30 min.(18 mi.)
75 min.(45 mi.)
- 7. Senior Manager 30 min.b 1
50 min.b 30 min.b
- 8. Senior Hea lth 1
5 min. (1.5 mi.)b Physics (HP) 18 min (7.5 mi.)b Expertise 30 mi n. ( 15. 3 mi. )b
- 9. Orf site Surveys 2
Performed by 2
HP Technicians, ilP Technicians Rad / Chem or Rad / Chem Technicians, Technicians - same or 1 Mechanic people as lines 11 per team - lines and 12 below. One 11, 12, and 17 member of each 2-below.
man survey team
( the driver) may rt be a Mechanic -
rt line 17 below.
y
- r 9m D
rt N
))
)
)))
)
2 s
1 ii n -
mm i iii i m mmm m a
d imsn 50 5 5so 0 y
cena 24 2
3' 4
i iha
((
(
(
t l
nCi1 Obi h/c1 eansw inn nn-. nnn n
cdi e
i ii'm m m m meiii i
Ca TRheo mm mm m
Lp cnl I a Preie 55 0555000 5
LC HoTlb 34 4444666 4
1 ee tn Bui nl eie 1
1 1
1 1
l md bi a0u T6C
)
)
))b
))
..)
)
2
)))))
i)i) ii.
b s
1
.....ii m.m.
/
n -
iiiiimm i i mmi
)
)i m
. m 5. m 5 5.3 i
i.m J
ya d
mmmmm 1
bimsn 05 m
m3 y
cena 8477511 5253 221 1
i diha
(((((((
1
(((
2 2(
t enCi1
((((
(
(
l mh/c1 i
rcdi nnnnnnn Ob oeansw iiiiiii nnnn nnn
.n Ca fTRheo mmmmmmm iiii iii n ni mmmm mmm i im Lp r
cnl m
m 2
I a ePreie 3555505 0500 055 5
LC PHoTlb 1111122 1123 112 5
82 1 ee tn Bui nl eie l md bi 1
1 1
a0u T3C
/
2 1
e tn Bfi il ehe lSd 1
1 1
b i anu TOC t
t t
t r
r r
r
/
ol o
o o
e 1 f
s pa p
p p
"a "
l o
n pc p
p p
t a
ui ul u
u esi t
i s
Sn Sa S
S rkT 1
u c
n hr ms l a l a l
l As o
i a
l co l rc a n"e B
(
n mi aes aei ac ac lTos h
ec icTi chl ci ci a
iie e) c hi v
iTu ir in nrttl tt e
Cn ntr n/a nt na o oi rb in T
/h hfe her hc hh ijsea sa dc ci p crd ce cc t a o pT nl P
ae ehu eoy el ee cMPx Op H
o frrrr 0
1 2
3 4
5 6
" ooof 1
1 1
1 1
1 1
- 1
!l I
I
C.
---=====
g-g Ca>
goo EEEEEEEE em
-am
(
O O O - G3 O @ A 4
e NNNN-MNX eCN w
a wwwwwwww eEe
.O.
cm
-mg Om-C CCCCCCCC CCC C
C e
ee-Om E
EEEEEEEE EEE C -
JQ o
o-
-a 00COOce4A COA c G3 #
JO Z
MMMMXMCN MW2 Eam
-OO e&C G3 3 -
C-Q-C
-Et ae-en C :
HQQ
==
~ ~ ~~
.a eg N
EEEEEE EC
a
mi E-.E-EE-
-m-4 ONhone 33 E
E
< ta =
e e
- 40. E O Oc e
w e
wwwwww w
-A--m eaw.
U U
etwwwww U
45 Om-C CCCCCC ww.....
C
.CCCCC CCCCCCCCC C 23 0 0 e
--~~--
a C C - -- - - -
Om EEEEEE E
--EEEEE es e - m EEEEEEEEE c am e
do u
U EE uno m
-m COOCOO O
ObOOO COCOOOOOO CCCW e
.J O Z
NNNNmm Z
CN--NNm mmmmmmmmm E cc a-eOC eaC CD 3 -
C-D-C e
-Et e
ae-4O
>mQ NNi C
eaC CD.b =-
3 C2C 3
8
-@D-
-e e
m tG C 3 WOO O
.. e a N
eaCW eW e
-t 6 C = es LCL c
O O c5 3 OO@
WE W U-Z 0-a N
pm-a n wO o
u.d k mu=a DU
-u (W
3 e C 4 c5 E C4O e5 C e C C G3 m
ONb e5 d
Q e5
-hoe O-0O ce
-C e
==C b> cow b > eU N LC CLMw-
= - es C 4
- = 3 :1 ww OO-ba es a c eg 6 en a 6
oC
=
- 3 W C es GOUCO 40tO Q-M e3 O a>
DCDDa G @ en d
=m Q E CL X ELEwo EbEm WE CE E WE 3
0 6LLLL N
a3 m
a OOOb
e
" Functional Area" e
or " Major Tasks" or "Pos i tion T i tle Table B-1 Table B-1 Table B-1 or Expertise" On Shift 30-minute LILCO 60-minuto LILCO f rom Table B-1 J/
Cuideline 2/
Cuideline Capability J/
Guideline Capability
- 20. Instrument and 1
5 min.(1.5 mi.)
40 min. (13 mi.)
Control (l&C) 8 min.(4 mi.)
45 min. (20 mi.)
Technician 20 min.(10 mi.)
45-60 min. (35 mi.)
20 min.(12 mi.)
60 min. (46 mi.)
25 min.(19 mi.)
60 min. (50 mi.)
25 min.(12 mi.)
65 min. (45 mi.)
25-30 min.(17 mi.)
75 min. (40 mi.)
25-30 min.(16 mi.)
90 min. (60 mi.)
30 min.(11 mi.)
- 21. Radia t ion Pro-2**
2 Same people 2
Samo people tection: HP as line 11 as line 11 Technicians above above
- 22. F i re f i ght i ng fire Bri-Local gado per Support Technical Specifica-tions
- 23. Rescuo Opera-2**
Local tions and first Support Aid
- 24. Site Access All per and Personnel Security Accountability plan Total 10 11 15 J/ For this table, the " Major functional Area," " Major Tasks," and " Position Title or Expertise" columns f rom Table B-1 have been combined. Each of the Table B-1 lines that contains numbers of people has been separately numbered (1-24) he re.
2/ The on shift complement is not at issue in EP 7(B), since the contention refers only to LlLCO's ability to
" augment" its staff.
The "on shif t" column of Table B-1 is included here only because i f the re is one HP Technician (for example) on shirt, then the number of people available to augment is one less than shown in the "LILCO Capability" columns. LILCO's on shif t organization is described in section 5.1.1 of Attachment 7(B)-4 to LILCO's written testimony on EP 7(B).
J/ Each listed travel time represents a different individual, h/ The line 18 functional a rea is covered at Shoreham by Nuclear Assistant Station Operators. The travel times for these people were taken, not f rom a su rvey, but f rom station records used to pay employees for travel time.
The employees themselves provided these travel times.
~4-1
- ++ +-~
e 6
W i
a om-i Os JG 4
-g dQ J
5 i'
wCG 9 aC 10 3 -
C-C-C
-EU Ae-403 M40 f
N Mi
>a W
=
C Om-C Om a
e d
U aC\\
-m C
e 4
dQ 3
6 L
O Ca e-e o eaC D
CD 3 -
O C-C
).
D-O
=gy De-W mC3 W
MMO 4
j T
G N
C e
i fyl C
j C
a
- e W
i.
eaC L
CD.6 -
O g
g Cao C
-mu a -
i J -
6 mC3
- O WOO E -
e a O
h O i
a a i
N O
z
- M e
w SS a
.D
<L g W.=
L L.at >
e 4W = a O
a
@ COD L
->cW a o i
--D D
CLaa-C0-6a a e
-980m I
a fD Q GM h
2 oEAx m a C
E WE E =
4 3
C 6LLLL x C00%
D d
J
--rw--
- +,
c
_r.2... -,_..
3..,.
..sy
,,,+--,,,,
..y 7,
,,._e---#,
,- w r,
-=,
--!-em
)
)
i a
UNITED STATES e Ww,[o ATTACHMENT 8 p
NUCLEAR REGULATORY COMMisslON
, y,i g
y g
wasmNoTON, D. C. 20555 w%,,,j#
007 2 & 1981 Dr. Donald F. Knuth President KMC, Inc.
1747 Pennsylvania Avenue, N.W.
Washington, D.C.
20006 l
Dear Dr. Kntrtff:
)#
This is in response to your letter dated October 5,1981 regarding the capability for rapid augmentation of a nuclear power plant staff in the event of an emergency.
We expect that each utility will expend its best efforts to meet tne augmentation criteria of Table B-1 of NUREG-0654/FEliA-REP-1 with respect to additional skills, such as professional health physics expertise, which may not be present on shift and to assure that enough " hands" are available to perform the many tasks that would result from an emergency.
Therefore, consistent with our policy for Regulatory Guides, we regard the Table B-1 criteria as having the same level of authority as a Regulatory Guide.
(Revision 2 to Regulatory Guide 1.101 is now in publication which incorporates NUREG-0654 by reference).
Facilities whose staffing augmentation capabilities meet the Table B-1 criteria would be acceptable.
Those facilities which do not meet these criteria will be reviewed on a case-by-case basis.
Failure to meet the criteria in a particular drill would clearly not call for a civil penalty as indicated in your letter.
Repeated failure to meet the design objective (goal) would be cause for the NRC to request utility manage-ment attention to this problem.
The response times listed in Table B-1 are certainly not rigid inviolate requirements as suggested in your letter because weather conditions, for example, could influence arrival times. A treatment of this problem in a recent SER (for the Callaway plant) is enclosed which gives an indication of the staff approach to this matter.
Sincerely, j
William J. Dircks Executive Director for Operations
Enclosure:
Excerpt from Appendix F of the Callaway SER
)
ENCLOSURE 1 EXCERPT FROM APPENDIX F OF THE CALLANAY SER DATED OCTOBER 1981 "The onsite (=4 n4=na) emergency organization for non-normal working hours, backshifts, and holidays is described in the Plan.
Emergency assignments have been made, and the relationship between the emergency organization and the normal staff complement are described in the Plan. Positions and/or titles and qualifications of shift and plant personnel both onsite and offsite who are assigned major emergency functional duties are listed.
M n 4=_=__ shift manning and shift augmentation are in the Plan and guidance for timely shift augmentation is provided.
The =4n4== on-shift staffing levels discussed in the Plan meet the objectives of Table B-1 of NUREG-0654.
The Plan describes the capability to augment the min 4== on-shift staff after declaration of an emergency.
This capability meets the design objectives of Table B-1 and is prioritized to provide capability within 30 to 45 minutes and 60 to 75 minutes.
The following minimum on-shift expertise will be maintained 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day:
one Shift Supervisor (SRO), one Operating Supervisor (SRO), two Unit Reactor Operators, two Equipment Operators, two Assistant Equipment Operators, one Instrument-Control Tech., one Radiation-Chemistry Tech., and one Shift Technical Advisor.
This makes a total of eleven persons on shift capability of performing all necessary major functions called for in Table B-1.
A person on-shift will be qualified to conduct in-plant radiation surveys. This is maintained 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day.
Within 30 to 45 minutes, depending on road and weather conditions, the additional personnel will be available for communications, in-plant protective actions, radiological accident assessment and operational support, and plant system engineering and repair actions. Within 60 to 75 minutes, fifteen additional i
persons will be available to augment the above mentioned functional area.
Because shift augmentation does not conform to the staff guidelines of 30 to 60 minutes, the licensee has committed to an extensive duty officer system to l
strengthen their existing augmentation capability.
Further, periodic unannounced drills will be conducted of the system to ensure the design objectives of Table B-1 can be achieved.
Records will be maintained for inspection.
The duty officer system will ensure sufficient management and supervisory personnel will be on call 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day with a reliable pager system or automatic telephone system.
Prioritized shift augmentation procedures will be developed and tested.
In addition to the above, a dedicated Emergency Duty Officer will be maintained 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day who can act as the EPOM.
The staff finds that adequate shift staffing and augmentation capabilities exist and will = =ine the duty-officer system during the preoperational inspection".
l
LILCO, November 9, 1982 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board 4
In the Matter of
)
)
Docket No. 50-322-OL LONG ISLAND LIGHTING COMPANY
)
)
(Emergency Planning -
(Shoreham Nuclear Power Station,
)
Phase I)
Unit 1)
)
AFFIDAVIT OF H. MARK BLAUER ON MEASURES TAKEN BY LILCO TO FACILITATE PROMPT ONSITE AUGMENTATION Commonwealth of Virginia )
) to wit:
City of Richmond
)
My name is H. Mark Blauer.
I am Chairman of LILCO's Emergency Planning Task Force and Emergency Planning Coordinator.
My duties include overall technical and adminis-trative responsibility for the Emergency Planning Task Force.
The Task Force is responsible for developing and maintaining
'the Shoreham Nuclear Power Station Emergency Plan; Emergency Training curriculum, manuals, and lesson plans; qualification and selection of emergency response personnel; Emergency Plan
a
~2-procedures; onsite and offsite emergency support facilities; the Prompt Notification System; the interfacing with Federal (NRC, DOE, FEMA, Coast Guard), State (Department of Health, Disaster Preparedness Commission) and Local (Suffolk County, hospitals and fire departments) authorities as well as other nuclear industry support groups (INPO).
Because of my perform-ance of these duties I am familiar with the measures LILCO has adopted to ensure prompt augmentation of the Shoreham Station staff in the event of an emergency.
The following. Tacts are true and corract to the best of my knowledge and belief; they are numbered consistent with the
" Statement of Material Facts as to ilhich There Is No Genuine Issue To Be Heard on Contentions EP 2(B), 5(B), and 7(b),"
dated November 9, 1982.
31.
LILCO has instituted a duty officer system; certain personnel who might be needed in an emergency are required, on a rotating basis, to be on call.
32.
Senior management personnel (those 8 people indi-cated on Attachment 6 accompanying this affidavit) are assigned pagers (" beepers").
33.
Those people designed to assume the Emergency Director role will have two-way radios installed in their cars, permitting direct communication with the Main Control Room.
E I
34.
Conference call capability has been provided so j
that a single phone call from the Control Room will connect several key personnel at once.
35.
Automatic card dialer capability allows the commu-nicators at the site to dial offsite personnel simply by inserting a card into the phone.
ab IL El L
'Dhte
/
Name Subscribed and sworn to before me on the'l day of 2 #tMW 1982.