Monthly Operating Rept for May 1981
ML20027E448
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/15/1981
From: Bramlett L
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20027E447 List:
References
NUDOCS 8211150327
Download: ML20027E448 (5)


Text

. .. _ .

, AVERAGE DAILY UN!T POWER LEVEL DOCKET NO. 50-368 UNIT 2 DATE 6/15/81 COMPLETED BY L.S. Bra alett TELEPHONE (501)968-2519 MONm May 1981

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M We. Net) (MWe Net) 1 0 17 'O 2 0 Ig 0 3 0 19 0 4 0 ;0 0 5 0 21 0 1 6 0 .

22 0 7 0 23 0 8 0 24 0

9 0 25 0 10 0 26 0 1I O 27 0 12 0 2g 0 13 0 0 29 14 0 0 '

30 l 15 0 31 0 16 0 INSTRUCTIONS On this format, hst the "a ser. ige caily unit pim er level in MWe. Net for each day in the repiiriing mienth. Cismpute io l the nearest whole megawait.

l I t9/771 l . ,

8211150327 810615 PDR ADOCK 05000368

! R PDR t-.

i OPERATING DATA REPORT DOCKET NO. 50-368 DATE 6/15/81 COMPLETED BY L.S.Bramlett TELEPHONE (En1 M6R 2519 OPERATING STATUS N"

1. Unit Name:

Arkansas Nuclear One - Unit 9 May 1-31. 1981

2. Reporting Period:
3. Licensed Thermal Power (MWtI:

2815 _

4. Nameplate Rating (Gross MWe):

942.57 912

5. Design Electrical Rating (Net MWe):

897

6. Masimum Dependable Capacity (Gro,s MWe):

NO

7. Maximum Dependable Capacity (Net MWe):

S. If Changes Occur in Capacity Rating (items Number 3 Through 7) Since Last Report.Gise Reasons:

None None

! 9. Power Lesel To Which Restricted. lf Anv Net MWe):

10. Reasons For Restrictions. If Any:

This Month Yr..t o.Da t e Cumulative

^

744.0 3623.0 10367.0 i1. Ilours in Reporting Period

12. Number Of liour, Reactor Was Critical 0.0 1968.0__ 6998.8 0.0 54.9 859.5
13. Reactor Resene Shutdown llours 0.0 1952.2-- 6868.2
14. Ilours Generalor On-Line 0.0 0.0 75.0
15. Unit Resene Shutdown liours 0 5094885 16939047
16. Gross Thermal Energy Generated (MWill 0 1673589 5506490
17. Gross Electrical Energy Generated (MWill 0 1599905 5247102
18. Net Electrical Energy Generated (MWill 0.0 53.9 66.3
19. Unit Senice Factor
20. Unit Availability Factor 0.0 53.9 67.0 0.0 51.5 59.0
21. Unit Capacity Factor (Using MDC Net)
  • 0.0 48.4 55.5
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.0 5.5 22.0-
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eachl:

i

25. If Shut Down At End Of Report Period. Estimated Date of Startup: June 20.1981
26. Units In Test Status (Prior to Commencial Operation): Forecast Achiesed j INITI A L CRITICA LITY INITI A L ELECTRICITY COM\lERCIA L OPER AllON 08/771

. ' DATE: June, jggj REFUELING INFOR.MATION

'a

1. Name of facility. Arkansas fluclear One - Unit 2
2. Scheduled date for next refueling shutdown. 3/28/81 (Shutdown)
3. Scheduled date for restart following refueling. 6/20/81
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, what, in general, will these be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

Yes. Descriotion of effects of new core loading.

5. Scheduled date(s) for submitting proposed' licensing action and supporting information. Has been submitted for Cycle 2.
6. Important licensing considerations associated with refueling, e.g. ,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

~

As a part of a research and development effort, two fuel assemblies

__w ill be loaded possessing design characteristics related to extended burnup.

7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool. a) 177 b) 60
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies. .

present 486 increase size by 0

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

DATE: 1989

. c DOCKET NO. 50-368 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME ANU-Uriit II DATE O-1-61 COMPLETED BY L.S. Branilett REPORT MONTil May. 1981 TELEPif0NE (501)968-2519 i

E E

, .5 ? 3 $ YE Licensee j-t, j'1 Cause & Corrective.

No . Date g 3g jgE Event g? gl Action to H yE i

$ jgg Report e mU g' Prevent Recurrence 6

81-06 710328 S 744 C 4 N/A ZZ ZZZZZZ Refueling Shutdown 1

2 3 4

1 F: Forced Reason: Method: Ex!nbit G . Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintcnance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Repor (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161i E-Operator Training & License Examination 5-Load Reduction F Administrative 5 9-Other Exhibit I - Same Source G-Operational Error (Explain)

W/77) Il Other (Explain) 4

NRC MONTHLY OPERATING REPORT OPERATING

SUMMARY

- MAY 1981 UNIT II The unit continued in the refueling outage with expected outage completion at this time to occur in late June.