ML20027E416

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Aug 1981
ML20027E416
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/10/1981
From: Abercrombie H
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20027E417 List:
References
NUDOCS 8211150198
Download: ML20027E416 (1)


Text

.v b

)

a

/

TENNESSEE VALLEY AUTHORITY Browns Ferry Nuclear Plant P. O. Box 2000 Decatur, Alabama 35602 l

September 10 ',^

-F-7 Nuc1 car Regulatory Commission Office of Management Information and Program Control Washington, DC 20555 Gentlemen:

Enclosed is the August 1981 Monthly Operating Report for Browns Ferry Nuclear Plant Units 1, 2, and 3.

Very truly yours, TENNESSEE VALLEY AUTHORITY vi LAWN L. Abercrombic

,'lant Superintendent Enclosure ec:

Director, Region II Mr. Bill Lavalec Nuclear Regulatory Commission Nuclear Safety Analysis Center (NSAC)

Office of Inspection and Enforcement 3412 Hillwood Avenue 101 Marietta Street P. O. Box 10412 Suite 3100 Palo Alto, CA 94303 Atlanta, CA 30303 (1 copy)

Director, Office of Inspection and Enforcement Nuclear Regulatory Commission Washington, DC 20555 (10 copies)

Mr. A. Rubio, Director l

Electric Power Research Institute P. O. Box 10412 Palo Alto, CA 94304 8211150198 810910 ~

~

PDR ADOCK 05000259 R

PDR A r. E m.;! 0; r or *.m h Enm.m. e-

.. ~,

OPER ATING DATA REPO!tT DOCKET NO.

50-260 DATE 8-1-81_

C051PLETED BY Bike Chm' man TELEPilONE 20$-72926840 OPI:R ATING ST \\TUS Notes

1. Unit Name:

Browns Ferry -2 3"1Y 1981

2. Reportmg Period:

3.1.icensed 1 hermal Pow er (.\\1Wt 1:

3293 1152

4. Nameplate Rating (Gross StWe):

1065

5. Design Electrical Rating (Net S!We):

1098.4

6. Staximum Dependable Capacity (Gross 51We):

1065 7 51aximum Dependable Capacity (Net 51We):

S. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since Last Report.Gise Reasons:

NA NA

9. Power Lesel To which Restricted. lf Any (Net 51We):

NA

10. Reasons l'or Restrictions. If Any:

This 51onth Yr..:o.Date Cumulatise 744 5,087 56,280 i1. liours in Reporting Period

12. Number Of Ilours Reactur Was Cr;tical 702.92 4,460.53 35,204.14
13. Reactor Resene Shutdown !!ours 41.08 598.10 13,051.58
14. Ilours Generator On-Line 634.72 4294.51 34,035.47 ye g 0 g(</f 760 0

0

15. Unit Resene Shutdown llours 9
16. Grow Thermal Energy Generated (N1Wil) 1,966,354

-1$,10;,11S-5,750,761-17 Gross Electrical Energy Generated (N!Wil) 654,140 4,402,870 32,140,058 '

631,506 4,273,003 31,223,310 IS. Net Electrical Enct;;y Generated (A!Wil) 85.3 84.4-60.5

19. Unit Senice Factor 85.3 84.4 60.5
20. Unit Auitability Factor 79 7 78.9 52.1
21. Unit Capacity Factor (Using 51DC Net) 79.7 78.9 52.1
22. Unit Capacit3 Factor (Usmg DFR Net) 14.7 6.3 30.3
23. Unit Forced Ontage Rate
24. Shutdowns Scheduled Oser Next 6 Stonths (Type. Date.and Duratum of I ach).

25 If Shut Dow n -\\t End Of l'eport Period. Estimated Date of Startup:

8-18-81 2 r>

Units in lest Status (Prior io Comm.,cial Operation):

Forecast A chies ed INill \\ L CRillCAllTY INITI \\L LLI:C1RICilY CO\\1\\ll'RCl \\L OPI'R ATION 3

,c~

,<z Pl/77 )

s.

.r*

!/

./

OPERATING DATA REPORT 50-260 DOCKET NO.

DATE 9-1-81 COSIPLETED BY T. Thom Tl LEPilONE 205-729-6846 OPERATING STAT US N"

1. Unit Name:

Browns Ferry - 2

2. Reporting Period:

August 1981 3293

3. Licensed Thennal Power (5 thal:

1152

4. Nameplate Ratine (Gross alwe):

1065

5. Design Electrical Rating (Net 51Wel:.

1098.4

6. Stasimum Dependable Capacity (Gross StWel:

106s

7. Stasimum Dependable Capacity (Net atWe):
h. If Cha es Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gis e Reasons:

NA

9. Power Lesello Which Restricted. lf Any (Net 51We):

NA

10. Reasons for Restrictions,if Any:

This 51onth Yr.o Date Cumulatise 744 5831 57,024

11. llours in Reporting Period 402.15 4,862.68 35,606.29 12 Number Of li.mrs Reactor was critical 341.85 939.95 13,393.43
13. Reanor Resene Shutdown llours 1/

14 Ilours Generator On Lme 4,620.68_

34,361.64 0

0

.0 15 Unit Revne Shutdown llours 929,335 14,118,753 ;mh;mtga52(9J48f,3g(

16 Grow Thermal Energv Generated (51Will 17 Gios, Electrical Energy Generated (51Will 299,25_0,_,

4,702,120 32,439,308 15 Net Electrical Energy Generated 151Wil) 285,490 4.558.493 31.508.800 43.8 79.2 60.3

19. Unit Senice Factor 43.8 79.2 60.3
20. Unit Asailabihty Factor 36.0 73.4 51.9 21 Unit Capacity Factor (lising 51DC Net 1 36.0 73.4 51.9 22 Unit Capacity Factor (U>ing DER Net!

56.2 13.3 30.7 23 Unit Forced Outage Rate 24 Shutdowns Scheduled Oser Nest 6 51onths (Type.Date.and Duration of Facht 25 If Shut Down At l'nd Of Report Period. Estimated Date of Startup:

2 s, 1: nits in les Status a Prior in Commercial Operation L Forecast Achiesed INITI A L CRillCA LITY INI l~l \\ L l't.ECl RICITY TO\\1\\1ERCl\\L OPER ATION es Ts