ML20027E301
| ML20027E301 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 10/29/1982 |
| From: | Vassallo D Office of Nuclear Reactor Regulation |
| To: | Power Authority of the State of New York |
| Shared Package | |
| ML20027E302 | List: |
| References | |
| DPR-59-A-071 NUDOCS 8211120538 | |
| Download: ML20027E301 (4) | |
Text
,[
UNITE 3 STATES NUCLEAR REGULATORY COMMISSION y-I b
S WA5MINGTON, D. C. 20566
&s*.L?If,I POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Anendnent No. 71 License No. DPR-59 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by the Power Authority of the State of New York (the licensee) dated June 26, 1979 comp 1.ies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comissioit's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confamity-with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that de activities authorized by this amendment can be conducted withoct endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable mquirements have been satisfied.
8211120538 821029 j
PDR ADOCK 05000333 P
2 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 71, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing
Attachment:
T~
Changes to the Technical Specificctions Date of Issuance: October 29, 1982 l'
l l
l
~
~.....*
..L~.--n...
. _ _ ~.
_.,,"a^..,_..2__..
. ;; L..
,.y
~'
4 ATTACHMENT TO LICENSE AMENDMENT NO. 71 FACILITY OPERATING LICENSE NO. DPR-59 DOCKET NO. 50-333 Remove Insert
- p. 240
- p. 240 e
e o
e e
m* ~
i t
b.
l I
i l'
1 l
i t
l
3.11 (cont'd)
JAFNPP 4.11 (cont'd)
.i..
D.
-Emergency Servich Water system D.
Emergency Service Water System 1.
,To e'nsure the adequate 1.
Surveillance of the ESW system equipment and area cooling, shall be performed as follows:
operable when the requirements
,of. specification 3.5. A and Item Frequency 3.5 B must be satisfied, except as specified below in a.
Simulated Each specification 3.11.D.2.
Automatic operating Actuation cyc1'e Test b.
Flow Rate Once/
}
Test - ESW 3 months g,
pumps shall deliver at least.
l 3,250 gpm.
against a -
system head corresponding to a total pump head of 3,80 psi, as determined from the pump certifi-cation curve by measuring thc pump shutoff head which shall be 2,117 psi c.,
Pump Once/ month Operability i
d.
Motor Once/ month Operated valves 240
~
Amendment No. 71 s-