ML20027D699

From kanterella
Jump to navigation Jump to search
Forwards LERs 82-104/03L-0,82-106/03L-0 & 82-062/03L-0
Date released: 02/10/2020 Download: ML20027D699


LER 82-062/03L-0:on 821002,at 100% Power,Periodic Test 2.9 Revealed That High Steam Flow Trip Setpoint for Comparator FC-2-494 (Steam Generator C) High & Could Not Be Adjusted. New Comparator Installed & Calibr
ML20027D706
Person / Time
Site: Surry 
Issue date: 10/29/1982
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027D706 (3)
LER 82-106/03L-0:on 821002,during Mode 5,w/overpressure Mitigating Sys in Enable,Both Pressurizer PORVs (PCV 1455C & 1456) Declared Inoperable.Caused by Leaking Diaphragm on PCV 1455C & Low Air Pressure on PCV 1456 Backup Air Supply
ML20027D703
Person / Time
Site: Surry 
Issue date: 10/29/1982
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027D703 (2)
LER 82-104/03L-0:on 820929,at Full Power,Performance of PT-24.2A Revealed That High Pressure Cardox Sys for Fuel Oil Pump Houses Inoperable.Caused by Zone Discharge Solenoid Valve Stuck Open Due to Scale & Corrosion Products
ML20027D700
Person / Time
Site: Surry 
Issue date: 10/29/1982
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027D700 (2)
Forwards LERs 82-104/03L-0,82-106/03L-0 & 82-062/03L-0
ML20027D698
Person / Time
Site: Surry 
Issue date: 10/29/1982
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027D698 (1)