ML20027D649

From kanterella
Jump to navigation Jump to search
Forwards LER 82-033/03L-0
Date released: 02/10/2020 Download: ML20027D649


LER 82-033/03L-0:on 820929,T-82B Safety Injection Tank Level Reached Limit of 198 Inches.Boron Concentration Fell Below Tech Spec on 820929-1022.Caused by Leakage Past Loop Check Valve & Safety Injection Tank Check Valve
ML20027D651
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/29/1982
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20027D651 (3)
Forwards LER 82-033/03L-0
ML20027D648
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/29/1982
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20027D648 (1)