ML20027D513

From kanterella
Jump to navigation Jump to search
Forwards LER 82-096/03L-0
Date released: 02/10/2020 Download: ML20027D513


LER 82-096/03L-0:on 820920,during RHR Torus Spray Mode Procedure,Torus Water Temp Exceeded Tech Spec Limit.Caused by Procedural Error.Spray Valve Shut & Cooling Continued to 94 F & Decreasing.Procedure Revision Initiated
ML20027D514
Person / Time
Site: Hatch 
Issue date: 10/19/1982
From: Tipps S
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027D514 (1)
Forwards LER 82-096/03L-0
ML20027D512
Person / Time
Site: Hatch 
Issue date: 10/19/1982
From: Nix H
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027D512 (1)