ML20027D415

From kanterella
Jump to navigation Jump to search
Forwards LER 82-093/03L-0
Date released: 02/10/2020 Download: ML20027D415


LER 82-093/03L-0:on 820929,routine Surveillance Procedure 06-OP-1T42-Q-0001 Revealed Fuel Handling Area Vent Supply Isolation Damper Failed to Cycle Closed in Less than 5-s. Caused by Cup Seal Being Stretched Oversize.Seal Repaired
ML20027D419
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/28/1982
From: Chenault W
MISSISSIPPI POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027D419 (1)
Forwards LER 82-093/03L-0
ML20027D414
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/28/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027D414 (1)