Interim Deficiency Rept Re Inadequate Installation of Gamma Plugs.Initially Reported on 820804.Approx 190 of 420 Installations Reviewed.Corrective Actions Will Be Completed & Final Rept Submitted by 830115
ML20027D387
Person / Time
Site: Zimmer
Issue date: 10/25/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-2076, NUDOCS 8211040228
Download: ML20027D387 (2)


Text

.

o_

THE CINCINNATI GAS & ELECTRIC COMPANY sg CINCINN ATI. OHIO 452OI EL A. BORGMANN schion vict PaCsIDENT October 25, 1982 QA-2076 U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J. G. Keppler Regional Administrator RE: WM. H. ZIMMER NUCLEAR POWER STATION UNIT I 10CFR50.55(e), ITEM M-56 INADEQUATE INSTALLATION OF GAMMA PLUGS, DOCKET NO.

50-358, CONSTRUCTION PERMIT N0. CPPR-88, W.0. #57300, JOB E-5590, FILE N0. NRC-8 ITEM M-56 Gentlemen:

This letter constitutes an interim report concerning the subject condition, initially reported to the Commission on August 4,1982, as a potentially reportable deficiency under 10CFR50.55(e).

As stated in our previous report, QA-1953, dated September 2,1982, Sargent & Lundy Engineers (S&L) was requested to provide an engineering evaluation of the safety significance of gamma plugs not meeting full thread engagement as required by S&L Design Specification H-2256. This original evaluation was initiated upon the discovery of three (3) plugs which were improperly installed. In order for S&L to develop revised minimum installation criteria to accept or reject generic groupings of installation problems, the Zimmer Quality Confirmation Program (QCP) is utilizing NDE inspection techniques and documentation reviews to provide a more accurate basis for evaluation. To date, QCP has re-viewed approximately 190 of 420 installations; this additional data is being forwarded to S&L.

These actions are expected to be completed and a report submitted addressing the significance and safety impact of this condition by January 15, 1983.

N.D MI$N23 821025cK05000g s NOV 1 1982

Mr. J. G. Keppler

~ Region III October 25,1982 - QA-2076 We trust.the above will be found acceptable as an interim report under 10CFR50 55(e).

j Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY i

By

-j SENbR RESIDENT i FKP:ec cc: NRC Office of Inspection & Enforcement i

Washington, D.C. 20555 i NRC Senior Resident Inspector Attn: W. F. Christianson Zimmer Project Inspector Region III i