Part 21 Rept Re Monel Replacement Shafts Mfg for Facility. Initially Reported on 820513.NRC Will Be Advised After Determination of Best Method of Testing Shafts for Any Metallurgical Anomoly Resulting from heat-straightening
ML20027D320
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/19/1982
From: Parrin R
HAYWARD TYLER PUMP CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-82-726-000 PT21-82-726, PT21-82-726-000, NUDOCS 8211040116
Download: ML20027D320 (1)


Text

__ _r LI P. O. Box 492 80 Industrial Parkway Burlington, Vt. 05402 (802) 863-2351 October 19, 1982 Mr. Richard C. DeYoung Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission East-West Building 3rd Floor, Room E-322A 4350 East-West Highway Bethesda, Maryland

Dear Mr. DeYoung:

This letter constitutes a follow-on report concerning the Part 21 notification sent to you by the Hayward Tyler Pump Company (HTPC) on May 13, 1982. Pursuant to HTPC's request, a copy of which was attached to the May 13 notification, Texas Utility Services, Inc. has returned to HTPC's plant in Burlington, Vermont, the four Monel replacement shafts manufactured by HTPC for use at the Comanche Peak power station. These shafts arrived in Burlington from Texas Utilities on October 11 and are now in HTPC's physical possession.

HTPC is considering the best means of testing these shafts for any metallurg. al anamoly which may have resulted from the use of heat-straightening. When HTPC has determined how to proceed with its testing program, the Company will advise you further.

Very truly yours, HAYWARD TYLER PUMP COMPANY h_h8c:e Robert L. Parrin General Manager RLP/ gem cc: Mr. Roger Fortuna l

8211040116 B21019 DR ADOCK 05000 g/p