Responds to NRC Re Violations Noted in IE Insp Rept 50-460/82-07.Corrective Actions:Qcrfi Sys Deleted & Insp Repts Will Be Written When Question as to Validity/ Accuracy of Requirements of Item Occurs
ML20027D137
Person / Time
Site: Washington Public Power Supply System
Issue date: 10/12/1982
From: Root R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20027D129 List:
References
GO1-82-0717, GO1-82-717, NUDOCS 8210280297
Download: ML20027D137 (3)


Text

,

~

1: ~D Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 I~9, Docket Nos. 50-460 & 50-513

's N October 12, 1982 G01-82-0717 Nuclear Regulatory Commision Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Attention:

Mr. D. M. Sternberg, Chief, Reactor Construction Projects Branch No. 1

Subject:

NUCLEAR PROJECT NOS 1 & 4 NRC INSPECTION WNP-1 DATE OF INSPECTION APRIL 5-9, 1982 CONSTRUCTION PERMIT NO. CPPR-134

Reference:

1) Ltr. T.W. Bishop to R.W. Root dated 5/3/82, "NRC Inspection of Washington Nuclear Project 1" 2)

Ltr. G01-82-0415, dated 7/82, "NRC Inspection WNP-1, Dates of Inspection April 5-9, 1982"

3) Ltr, T.W. Bishop to R.W. Root dated 8/4/82.

As requested by you in reference three (3), the following additional information is provided in response to your comments for the corrective actions for noncompliance Findings A.

Due to differences which exist between certain items related to Finding B of Reference three (3) and the Supply System's response, t

which was provided in Reference two (2), it is requested that a meeting be held at our mutual convenience to resolve these issues.

The finding A additional information regarding actions taken to ensure nonconformances are documented and reviewed in accordance with prescribed procedures is as follows:

The QCRFI system is being deleted. When any question as to the validity / accuracy of requirements or acceptability of an item occurs, an inspection report will be written by the QC inspector and dispositioned in accordance with QCP/CP 10, Nonconforming Items, Materials, Parts & Components.

I In addition, the CM0 will perform ongoing surveillances of the contractor's responses to IR's in the future to ensure adequacy of disposition and that Contractor Non-Conformance l

Reports (CNCRs) are written when appropriate.

8210280297 821012 1

PDR ADOCK 05000460 l

G PM L

~

> e

-i D.M. Sternberg Page 2 October 12, 1982 G01-82-0717 As is stated above, it is requested that we meet to discuss Finding B.

Please contact us when it may be possible to have this meeting.

8// o R. W. Root, Acting Program Director WNP-1/4 (821)

RWR:CRE:pp cc:

JD Bateman, UE&C (895)

JP Laspa, Bechtel (861)

V Mani, UE&C (897)

V Stello, NRC A Toth, NRC G Valentenyi, UE8C, PA (08U6) a I

l

)

,,,r-,

,-~ _. -, - -. ---..--, -,,

,w.,,

,.e, m-._ex.

oo STATE OF WASHINGTON COUNTY OF BENTON

)

R. W. Root, being first duly sworn, deposes and says: That he is the Acting Program Director, WNP-1/4, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the foregoing on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.

i b1 / b, 1982 DATE b

8b

' ~

R. f. Root On this day personally appeared before me R. W. ROOT to me known to be the individu.'l who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this

/o2 N day of

///)

, 1982

/litkfJ Y.

6dY N6t,a;Fy Public in and for the State of Washington Residing at

/