Application for Amend to Licenses NPF-2 & NPF-8,revising Tech Specs to Require Audit on Emergency Preparedness Program Every 12 Months,Per 10CFR50.54(t) & Generic Ltr 82-17.No Amend Fee Required.Ser Encl
ML20027C999
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/25/1982
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20027D000 List:
References
GL-82-17, NUDOCS 8210280158
Download: ML20027C999 (2)


Text

Malling Address f

6 Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

2l:'#C%7"'

AlabamaPbwer October 25, 1982 tre sourtwm etectre system Docket Nos. 50-348 bjpp e 50-364 Ap'r -b Director, Nuclear Reactor Regulation U. - S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. S. A. Varga Farley Nuclear Plant - Units 1 and 2 Emergency Preparedness Program Audit Technical Specification Change Request (Generic Letter No. 82-17)

Gentlemen:

In accordance with Generic Letter No. 82-17, Alabama Power Company requests that the Joseph M. Farley Technical Specifications be changed to require an audit on the emergency preparedness program every 12 months vice every 24 months.

This change will bring the technical specifications intc agreement with the requirements of 10CFR50.54(t).

Alabama Power Company's Plant Operations Review Committee has reviewed this proposed change to the technical specification and has determined that no unreviewed safety question is involved as shown in the enclosed safety evaluation.

The Nuclear Operations Review Board will review this proposed change at the next scheduled meeting.

In accordance with Generic Letter No. 82-17, this proposed change is made at the request of the Commission and does not require submittal of a license fee.

In accordance with 10CFR50.30(c)(1)(1), three signed originals and forty (40) additional copies of these proposed changes are enclosed.

Yours very truly,

/

F.L.Clayton,Jd F LCJ r/GGY : l s h-D9 SWORN TO AN SUBSCRIB ORE ME Attachments THIS DAY OF 1982 cc:

Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly J

Mr. E. A. Reeves ho,cy f///b Mr. W. H. Bradford 6' / Notary' Public ~'

~

My Commission Expires 8210280158 821025

  1. ~ M,EI PDR ADOCK 05000348 P

PDR

a ATTACHMENT 1 SAFETY EVALUATION FOR UNIT 1 AND 2 TECHNICAL SPECIFICATION CHANGE TO SECTION 6.5.2.8.e BACKGROUND:

The existing Joseph M. Farley Technical Specifications, in conformance with the NRC Standard Technical Specifications, require an audit of the emergency preparedness program every 24 months.

Subsequent to the issuance of the technical specifications,10CFR50.54(t) was issued which required that an audit of the emergency preparedness program be conducted every 12 months.

Based on NRC's recognition of this condition af fecting a number of utilities, Generic Letter 82-17 was issued requesting that the licensees submit a request for a technical specification change which would ensure compliance with 10CFR50.54(t).

REFERENCES:

1.

Joseph M. Farley Nuclear Plant Unit 1 Technical Specification Section 6.5.2.8.e 2.

Joseph M. Farley Nuclear Plant Unit 2 Technical Specification Section 6.5.2.8.e PROPOSED CHANGE:

It is proposed that Section 6.5.2.8.e of the Unit 1 and 2 Technical Specifications be changed to provide for an audit of the emergency preparedness program every 12 months vice every 24 months.

CONCLUSION:

l This proposed change is for clarification and at the request of the i

Commi ssi on.

It does not involve an unreviewed safety question as defined by 10CFR50.59.

1

-