ML20027C650
| ML20027C650 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 09/22/1982 |
| From: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20027C649 | List: |
| References | |
| NUDOCS 8210260575 | |
| Download: ML20027C650 (2) | |
Text
-
. - ~
p1. s a].,O ', s 'n:t, it j
! 'l 1.31 l T] c
. 2 1.s t
) !,',
f _ 7 ') ! l_ _., d'- ].
7i'~
5 3
.. u si o1 -
s P.o. Box 5000 - CLEVELANo. ohio 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLOG. - $5 PUBLICSoVARE Serving The Best Location in the Nation Dilwyn R. Davidson j'ylr'"'c'A '~"e'enino ano consinuction September 22, 1982 C
u Mr. Harold R. Denton Office of Nuclear Reactor Regulauon U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Emergency Plan, Revision 0
Dear Mr. Denton:
Enclosed'are three (3) signed originals and forty (40) copies of the Perry Nuclear Power Plant Emergency Plan. This document is completely reissued as CEI Report No. OM-15A and supercedes the existing Appendix 13A to Chaptsr 13 of the Final Safety Analysis Report (FSAR). Amendment 9 of the FSAR deletes the plan in Appendix 13A. By this letter, the Emergency Plan is hereby submitted as a separate document entitled " Emergency Plan for Perry Nuclear Power Plant,"
Revision 0.
Very truly yours, i
&f L
Dalwy R. Davidson Vice President System Engineering and Construction DRD:mb Enclosure I
cc: Jay Silberg, Esq.
l John Stefano l
Max Gildner Falk Kanter qg Peter Bloch A
Daniel Wilt 1
1 o
l 8210260575 821008 PDR ADOCK 05000440 F
. _..__~
s s I
Dalwyn R. Davidson who, being duly sworn, deposed and said that (1) he is Vice President, System Engineering and Construction of The Cleveland Electric Illuminating Company, (2) he is duly authorized to execute and file this report on behalf of The Cleveland Electric Illuminating Company and as duly authorized agent for Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company and the Toledo Edison Company, and (3) the statements set forth therein are true and correct to the best of his knowledge, information and belief.
/)
V, bs/) -
~
Dal R. Davidson Sworn to and subscribed before me, this 2I day of h)T66)O@, bbb b1 C. biM_n t
ue oa JOSEPH C. SZWEROWSKI Metary Public, State of ONo - Cuya. Cty.
My Commission Expires July 14,19BS s
4