a DUKE POWER Goniwxy I'.O. ISOX 33180 CIIAllLOTTE. N.C. 28242 II AL II. TUCKEH TFLEPHOW
, u, n.
.,m (704) a73-4Siti ef tL F.am PeoptTTIon October 11, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attuntion:
Ms. E. G. Adensam, Chief Licensirig Branch No. 4
Subject:
McGuire Nuclear Station - Unit 2 Docket No. 50-370
Dear Mr. Denten:
In order to support your review for the proposed facility operating license for McGuire Unit 2, the important differences in design features between McGuire Units 1 and 2 are identified on the attached page. Please contact R. E. Harris (704-373-8771) if you have any questions.
Very truly yours, Hal B. Tucker REH:jfw Attachment cc: James P. O'Reilly, Regional Administrator P. R. Bemis U. S. Nuclear Regulatory Commission Senior Resident Inspector Region II McGuire Nuclear Station 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 O D 8210180128 821011 PDR ALOCK 05000370 A
McGuire Unit 1 - Unit 2 Significant Differences 1.
B C control rods on Unit 2 (Re: FSAR Section 4).
4 2.
No Boron Injection Tank (BIT) for Unit 2.
3.
Offsite power distribution voltages.
(Re: FSAR Section 8.1) 4 Live thermocouples in upper reactor head not installed on Unit 2.
5.
Steam Generator preheater instrumentation not installed on Unit 2.
(Re: FSAR Table 14.1.4-3) 6.
Tests not required for Unit 2 such as UllI high-pressure blowdown test, steam generator water hammer test, and special low power tests (natural circulation verification, etc.)
.