y _;
+,
~ _,.
,, _ ~.
tH :+
'lf&kygQ Q fi;
,h 333 PWmont Aves A
~ nant.a G00tuia 30308,
a 1Teeprohc 404 5N 7703
- OSing Adcress Post Of*(e Box 4545 --
p Anawa. Georgk 30M2 P
Georgia Pbwer a
- "" WT W" D. E. Dutton.
Vcc Ptesvaem.
p e
I-4 October 15, 1982 a
Director of Nuclear Reactor, Regulation 4
- Attention: Darrell G. Eisenhut, Director Division of Project. Management j
o
. U.1S. Nuclear Regulatory Comission
)
.D. C. -20555' I
.I l-l NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 t
V0GTLE ELECTRIC GENERATING PLANT POSTULATE MILLETT FAULT REPORT
Dear Mr. Eisenhut:
Enclosed are 20 copies of the report titled " Studies of Postulated Millett -
i Fault". prepared.in, response to the U.S.G.S. open-file report 82-156, which.
t postulates the existence of the Millett Fault near the Vogtle Plant Site.
l The results of these studies ~~ described in this report conclusively demon-l l
strate' that the Postulated Millett Fault is not capable. Therefore, it has r.o effect on the existing accepted seismic design bases of the Vogtle EIectrical. Generating Plant. The evidence suggests that~no fault is present' whhin the depth range of this' investigation 'which includes geological beds.
[
from 40.to 80 million years old. A second conclusion is that no capable fault exist'near the location of the Postulated Statesboro Fault.
We appreciate very much the support and cooperation given by the NRC's staff-l L
during this investigation. The coments and suggestions given were very =
r l
beneficial in allowing us to bring this investigation to a conclusion.-
We also would like to.thank your staff for agreeing to factor in' the expedient l,
review of this. report into their busy schedule in order that this issue can' a
l be resolved as soon as possible, t.
po p I9 c
r e
A POR
. r
r Mr. Darrell G. Eisenhut October 15, 1982
'Page 2 We will continue to stay in close contact with your Licensing Project Manager and the NRC staff involved :in this effort to expedite the completion 1
of this review and resolution of this issue.
Yours trul,
t 1
1 1 N
~1 -~9 ^
l 1
.Doug lAitton Vice President Generatt ng Plant Projscts sW cc:
R. A. Thomas D. O. Foster
- 0. Batum M. Malcom J. A. Bailey C. McClure G. F. Trowbridge J. M. Grant R. E. Jackson I. B. Alterman J. P. Knight i
R. H. Vollmer J. P. O'Reilly W. F. Sanders L. T. Gucwa l
1 i
R w.
- - - - - - - -