Forwards Studies of Postulated Millett Fault, Vols 1 & 2, in Response to USGS Open File Rept 82-156,which Postulates Existence of Fault Near Facility.Postulated Fault Not Capable
ML20027C361
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/15/1982
From: Dutton D
GEORGIA POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20027C362 List:
References
NUDOCS 8210150362
Download: ML20027C361 (2)


Text

y _;

+,

~ _,.

,, _ ~.

tH :+

'lf&kygQ Q fi;

,h 333 PWmont Aves A

~ nant.a G00tuia 30308,

a 1Teeprohc 404 5N 7703

- OSing Adcress Post Of*(e Box 4545 --

p Anawa. Georgk 30M2 P

Georgia Pbwer a

    • "" WT W" D. E. Dutton.

Vcc Ptesvaem.

p e

I-4 October 15, 1982 a

Director of Nuclear Reactor, Regulation 4

- Attention: Darrell G. Eisenhut, Director Division of Project. Management j

o

. U.1S. Nuclear Regulatory Comission

)

Washington

.D. C. -20555' I

.I l-l NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 t

V0GTLE ELECTRIC GENERATING PLANT POSTULATE MILLETT FAULT REPORT

Dear Mr. Eisenhut:

Enclosed are 20 copies of the report titled " Studies of Postulated Millett -

i Fault". prepared.in, response to the U.S.G.S. open-file report 82-156, which.

t postulates the existence of the Millett Fault near the Vogtle Plant Site.

l The results of these studies ~~ described in this report conclusively demon-l l

strate' that the Postulated Millett Fault is not capable. Therefore, it has r.o effect on the existing accepted seismic design bases of the Vogtle EIectrical. Generating Plant. The evidence suggests that~no fault is present' whhin the depth range of this' investigation 'which includes geological beds.

[

from 40.to 80 million years old. A second conclusion is that no capable fault exist'near the location of the Postulated Statesboro Fault.

We appreciate very much the support and cooperation given by the NRC's staff-l L

during this investigation. The coments and suggestions given were very =

r l

beneficial in allowing us to bring this investigation to a conclusion.-

We also would like to.thank your staff for agreeing to factor in' the expedient l,

review of this. report into their busy schedule in order that this issue can' a

l be resolved as soon as possible, t.

po p I9 c

r e

A POR

. r

r Mr. Darrell G. Eisenhut October 15, 1982

'Page 2 We will continue to stay in close contact with your Licensing Project Manager and the NRC staff involved :in this effort to expedite the completion 1

of this review and resolution of this issue.

Yours trul,

t 1

1 1 N

~1 -~9 ^

l 1

.Doug lAitton Vice President Generatt ng Plant Projscts sW cc:

R. A. Thomas D. O. Foster

0. Batum M. Malcom J. A. Bailey C. McClure G. F. Trowbridge J. M. Grant R. E. Jackson I. B. Alterman J. P. Knight i

R. H. Vollmer J. P. O'Reilly W. F. Sanders L. T. Gucwa l

1 i

R w.

- - - - - - - -