ML20027C094

From kanterella
Jump to navigation Jump to search
Notification of Contract Execution,Mod 5 to Sheffield Trench Cap Study. Contractor:Univ of Il
ML20027C094
Person / Time
Site: 02700039
Issue date: 09/28/1982
From: Fleenor C
NRC OFFICE OF ADMINISTRATION (ADM)
To: Jennifer Davis, Siefken D
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20027C095 List:
References
CON-FIN-B-6965-2, CON-NRC-02-80-074, CON-NRC-2-80-74 NUDOCS 8210120411
Download: ML20027C094 (1)


Text

' I gi;C i eg'.* 255-

...__. _ _ ___ N,_

N.--._.__

t

' s 1 "^;1 **

tH (O 7M NRC-02-80-074 DivtS10N OF CONT H ACTS MODiflCAf SON NtiMBE R U s. NUCLE AR M GUL ATORY CCMM:L$ ION Five(5)

WASHINGTON, D.C. 70555 O NEW DC MODIFICATION OTHER t$swt41 NOTIFICATION OF CONTRACT EXECUTION CONTR AC1 BASE D ON; To:

John Davis, Director Auf sOniz AiiON NUMBE R

, g,,,,

NMS-80-074 Office of Nuclear Material Safety and Safeguards DATE 4/22/82 8/19/82 i s-

+,/

' J 'I'*M f 0 " '

CONTRACT CH ANGES PER THIS ACTION m

FROM:

Cindyifi. Fleenor

. -,()

J'm-roa,,;

1.

Revise task reports delivery schedu'te.

2.

Attend Low-Level Waste

~

Workshop in Denver.

3.

Increase estimated cost.

Technical Assistance Contracts Branch 4.

Revise voucher submittal in's Division of Contracts, ADM 5

Rubstitute_updtd Mr un?

CONT R ACTCR IName & L ocar,on1 EXECUTION D ATE 9/28/82 The Board of Trustees University of Illinois, Urbana Tvec Or CDP.T H ACT Champaign, IL 61820 Cost Sharing PROJECT TITLE PERIOD OF FIRF ORMANCE 9/30/80 - 11/30/83 "Sheffield Trench Cap Study" PRINCIP AL l?iVESTIG AT OR Keros Cartwright NRC AUTHORIZED REPRESLNTATIVE David Siefken B&R NUMBER FIN NUMBER 50-19-03-02 B-6965-2 AMOUNT NEW NRC FUNDS S.

3,000.00 FUNDING '

TOTAL FY 82 CUNDING s'

6.000.00 TOTAL NRC OBLIGATIONS S258,274.00 GOVERNMENT PROPERTY.

ATT ACHME fells);

CONTR ACT 00~UME NT (

)

s

- NRC FORM 255 5'

(10 76)-

g..-.

' g 0g 04g1 820928 J5tC. 074. PDR w

.