Forwards Special Rept 31, 1982 Reactor Containment Bldg Integrated Leakage Rate Test. Next Rept Tentatively Scheduled for 1985 Outage
ML20027B860
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 09/16/1982
From: Vandewalle D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20027B861 List:
References
NUDOCS 8209300227
Download: ML20027B860 (1)


Text

.

C011 Sum 0rS Power m y.,,,,,

f Nuclear licenssng Adnesnt'.strator General Offices: 1945 West Pamall Road, Jackson, MI 49201 * (517) 788-1636 PRINCIPAL STAFF

']tgry (]l September 16, 1982 M

[g e OfRA A/M l g-i?f f- ---

0LUjid M3I?

v SMEC.} _

lTh-~i DESTP j[ Q

-[

James G Keppler, Administrator ML I

Region III OL jFiLE f4g'g US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - SPECIAL REPORT NO 31: REACTOR CONTAINMENT BUILDING INTEGRATED LEAKAGE RATE TEST - 1982 Special Report No 31 entitled " Reactor Containment Building Integrated Leakage Rate Test" is attached. This report is submitted in accordance with 10 CFR 50, Appendix J.Section V.B.

Although Section V.B states that this report should be submitted approximately 3 months after the completion of the test, additional time was needed for caapiling the previous Local Leakage Rate Test data, and for constructing and reviewing this report.

The next Containment Integrated Leakage Rate Test has been tentatively scheduled for the 1985 refueling outage.

h)]'Ch Lvddh0lk David J Va,ndeWalle Nuclear Licensing Administrator CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Big Rock Point Plant 6 Pages 8209300227 820916 f

DR ADOCK 05000155 PDR b