CORSum8lS F
power James W Cook Vice President - Projects, Engineering and Construction General offices: 1945 West Parnall Road, Jackson, MI 49201 + (517) 788 0453 July 16, 1982 Mr J G Keppler, Regional Administrator U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND PROJECT -
INSPECTION REPORT MO 50-329/82-05 (DETP) & 50-330/82-08 (DETP)
File :
0.4.2 Serial
18355
Reference:
NRC letter, W S Little to J W Cook, dated June 16,1982 (Transmittal of Inspection Report 82-08)
The subject Inspection Report (82-08) provided the results of an inspection of the Preoperational Testing Program. This letter provides the status of actions taken pn the three open items identified in the inspection report.
Open Item 330/82-08-01: Review of Recent Preoperational Test Problems The summary of recent preoperational test problems encountered at other plants is currently being reviewed by our Technical Department staff.
The review is scheduled to be complete by July 21, 1982. Any additional administrative controls, if required, will be implemented after the review is completed.
Open Item 330/82-08-02:
Chapter 14 FSAR Change We have reviewed Chapter 14 of the FSAR and compared it to the Testing Program Manual and recent licensing commitments. The required changes in Chapter 14 were submitted on June 7, 1982 for inclusion in the next revision to the FSAR. This completed our action on this open item.
JUL 22 iggy 8209300204 820716 PDR ADOCK 05000329
((d '/
G PDR
l P ge 2
' Mr J G Keppler File: 0.4.2 Serial: 18355 July _16, 1982
'Open Item 330/82-08-03: Review ~ of ' Comments on ' the Testing ~ Program Manual The inspector's comments on the wording and content of selected Testing Program Manual-(TPM) Procedures have been reviewed. The appropriate revisions to the TPM. Procedures are now being prepared to incorporate the necessary changes.
h$