ML20027B759

From kanterella
Jump to navigation Jump to search
Forwards LER 82-059/01T-0
Date released: 02/10/2020 Download: ML20027B759


LER 82-059/01T-0:on 820909,setpoints for RHR Injection Valve Differential Pressure Switches Found High.Caused by Erroneous Procedure Listing Setpoint as 58 Psig Vs 43 Psig. Change Issued to Correct Procedures
ML20027B760
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/22/1982
From: Randy Patterson
MISSISSIPPI POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027B760 (2)
Forwards LER 82-059/01T-0
ML20027B758
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/22/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027B758 (1)