ML20027B511

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Aug 1982
ML20027B511
Person / Time
Site: Farley 
Issue date: 09/14/1982
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20027B512 List:
References
NUDOCS 8209210171
Download: ML20027B511 (1)


Text

, _ _ _ - - _ _ _ - - - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Milling Addriss Alabama Power Company 600 North 18th Street Post Office Dor 2641 Bumingham. Alabama 35291 Telephone 205 7834081 F. L. Cla yton, Jr.

%";,'n'farfg*"'

AlabamaPower d

tre souttwYn electic sysiten September 14, 1982 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Pegulatory Commission Washington, D.C.

20555

Dear Si r:

RE: Joseph M. Farley Muclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the August, 1982 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Specifi-cations.

As requested by letter from Mr. John F. Stol z to Mr. Al a n R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, F. L. Cl ayton Jr.

FLCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

"(flI Director, RII (1 copy) 8209210l7j)(

i