ML20027B274

From kanterella
Jump to navigation Jump to search
Significant Const Deficiency Rept 61 Re Linear Crack in Stainless Steel Tubing.Review of Metallurgical Analysis & Nondestructive Exam at Sandvik Facilities Not Completed. Final Rept Will Be Submitted on 830307
ML20027B274
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/31/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
W3I82-0021, W3I82-21, NUDOCS 8209160600
Download: ML20027B274 (1)


Text

LOUISIANA 24a ouAnoNoE swa POWER & LlGHT P O box 6008

  • NEW CALEANS. LOUISIANA 70174 * (504) 366 a345

$i0$??s4l0 L. V. MAURIN August 31, 1982 Vice President Nudear Operations W3I82-0021 Q3-A35.07.61 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission '

611 Ryan Plaza Drive, Suite 1000 [Ej @ f d[l\V/f f '

Arlington, Texas 76012 r-- - - -

! > l

Subject:

Waterford SES Unit No. 3 ;E @ d l982 Docket No. 50-382 Significant Conctruction Deficiency Report Nc l\

.' b, i -

" Linear Crack in Stainless Steel Tubing"

Reference:

1) LP&L Letter W3K-82-0474

Dear Mr. Collins:

At the present time, the review and evaluation of the metallurgical entlysis of the tube defect and the NDE failure rate at Sandvik's facilities s described in I t'6L letter W3K-82-0474 has not been completed.

A final report will be submitted on March 7, 1983.

Very truly yours, v

b L. V. Maurin Vice-President cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 fY Y

8209160600 820031 PDR ADOCK 050003G2 S PDR