u August 31, 1982 L V. MAURIN Vice President Nuclear Operations W3182-0022 Q3-A35.07.52 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission p
g7
~g};
611 Ryan Plaza Drive, Suite 1000 g
Arlington, Texas 76012 4
lll SEP A w
3 f,, k i
Subject:
Waterford SES Unit No. 3 Docket No. 50-382 p
Significant Construction Deficiency Report No. 52 "Bi-Metallic Penetration Welds, No Stress Relief"
Reference:
1)
LP&L Letter W3K-82-0275
Dear Mr. Collins:
At the present time, the corrective action as described in LP&L letter W3K-82-0275 has not been completed by Associate Piping and Engineering.
A final report will therefore be submitted on November 5, 1982.
Very truly yours, L. V. Maurin Vice-President cc:
- 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- 2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission h
Washington, D. C.
20555 fw 8209160583 820831 DR ADOCK 05000382 PDR
>