ML20027B049
| ML20027B049 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 08/31/1982 |
| From: | Morisi A BOSTON EDISON CO. |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20027B050 | List: |
| References | |
| 82-238, NUDOCS 8209160298 | |
| Download: ML20027B049 (1) | |
Text
\\
BOSTON EclanN COMPANY GENERAL Omcts 500 BovLaTON STREET BasTON. MASSACHUSETTS 02199 A. V. M O RISI MANAGER NUCLEAR OPERATIONS SUPPORT DEPARTMENT August 31, 1982 BECo. Ltr. #82-238 Mr. Ronald C. Haynes Office of Inspection and Enforcement Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA.
19606 License No. DPR-35 Docket No. 50-293 Radioactive Effluent Release Report January 1 through June 30, 1982
Dear Sir:
In accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.C.1, Boston Edison Company hereby submits 2 copies of the Pilgrim Nuclear Power Station Radioactive Effluent Release Report. The reporting period is from January 1, 1982 through June 30, 1982.
The report format and content are in accordance with NRC Regulatory Guide 1.21:
MEASURING, EVALUATING, AND REPORTING RADIOACTIVITY IN SOLID WASTES AND RELEASES OF RADI0 ACTIVE MATERIALS IN LIQUID AND GASEOUS EFFLUENTS FROM LIGHT-WATER COOLED NUCLEAR POWER PLANTS, Revision 1, Tables 1A, 1B, 1C, 2A, 2B, 3, 4A 4A-2 and Supplemental Information.
Very truly yours, (2 copies) cc:
Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Operating Reactors Office of Nuclear "eactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 (6 copies) l Commonwealth of Massachusetts Director, Executive' Office of Manpower Affairs Dept. of Labor and Industries Division of Occupational Hygiene 39 Boylston Street (9th floor)
Boston, MA.
02116 (1 copy) 8209160298 820831 y,d i
PDR ADOCK 05000293 sf R
-