ML20027B039

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 70-1151/82-15 on 820816-19.No Noncompliance Noted.Major Areas Inspected:Verification of Export Shipment of Snm,Including License Review & Fuel Rod Loading.Details Withheld (Ref 10CFR2.790)
ML20027B039
Person / Time
Site: Westinghouse
Issue date: 09/01/1982
From: Bates J, Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19289B136 List:
References
70-1151-82-16, NUDOCS 8209160291
Download: ML20027B039 (1)


Text

/ "-

A' ATIF;At TRAt6MITTTD H7r.Wid coNIA.NS 2J90 shiOLVADON

  1. t' c,,'o.,

o UNITED STATES NUCLEAR REGULATORY COMMISSION 8

",'n REGION 11 I

e 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 os

/

September 2, 1982 Report No. 70-1151/82-16 Docket No. 70-1151 License No. SNM-1107 Safeguards Group No. III Licensee: Westinghouse Electric Corporation Nuclear Fuel Division Columbia, SC 29250 Date of Inspection: August 16-19, 1982 Type of Inspection: Unannounced Material Control and Accountability

//

fu[

  1. A

_ g'htes, Senior Safeguards Chemist

_%'DateSigned Inspector:

.B Approved by:

8 Pf0 M 1ps.v 9[l/32_

'E. J. McAlp'ine, Chief Material Control and Date Signed Accountability Section Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Inspected:

Verification of export shipment of SNM including:

license review; fuel rod loading; SNM verification and followup on previous identified inspection findings.

The inspection involved 30 inspector nours on site by one NRC inspector and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspection.

h

. /IO 3,g Copy 7

-C Pa ".c 3 Q3 nocmont ic not to be rouroduce 1 withSut specif10 approval of IE:Il A%TERIAL TRAN5YlTTED HEREWIIN CONTAINS 21'vJ IMORMAllON G209160291 820902 PDR ADOCK 07001151 C

PDR