Text
N Commonwrith Edison one First National Plaza. Chicago. Illinois (Q Chicago,1;hnois 60690 C
7 Address Reply to: Post Othce Box 767 September 2, 1982 Mr. Harold R.
Denton, Director Office of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission Washington, DC 20555
Subject:
Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 FSAR Amendment No. 39 NRC Docke t No s. 50-45 4, 50-455, 50-456 and 50-457
Dear Mr. Denton:
The application for construction permits and operating licenses for Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2, docketed September 20, 1973, are hereby amended by submittal of Amendment 39 pursuant to 10 CFR 50.34.
Amendment No. 39 to the Byron /Braidwood FSAR consists o f responses to questions from the Auxiliary Systems Brsnch (010.0 series), Mechanical Engineering Branch (110.0 series), Structural Engineering Branch (130.0 series), Reactor Systems Branch (212.0 series), and the Ef fluent Tre.atment Systems Branch (321.0 series).
Also included are revised responses to Questions 010.39, 010.40, 010.47, 022.23, 022.24, 022.25, 022.35, 022.47, 022.54, 022.74, 031.42, 040.182, 110.37, 121.1, 121.3, 212.90, 221.3, 321.15, 331.3, 331.15, 423.12, and 423.33, and voluntary text changes.
Attachment A to this letter lists the questions answered in this amendment.
At tachment B lists the questions that will be answered in future amendments.
Three signed originals and fifty-seven copies o f this amendment are submitted for your review and approval.
Please direct questions regarding this amendment to this office.
Very truly yours, ff W
8209160144 820902 PDR ADOCK 05000454 T. R.
Tramm K
PDR Nuclear Licensing Administrator SUBSCRIBED and SWORN to befo me this JAsl day of 1 % )ui > 1982
}
n s
k
~ ' Notary Public h
go\\
i 4936N
e-NRC Docket Nos. 50-454/455 50-456/457 Attachment A List of Round One and Round Two Questions Answered in Byron /
Braidwood FSAR Amendment No. 39 I.
Auxiliary Systems Branch (Series 010.55 - 010.59)
The following questions have been responded to in this amendment:
010.55 through 010.59 II.
Mechanical Engineering Branch (Series 110.71, 110.72)
The following questions have been responded to in this amendment:
110.71 110.72 III.
Structural Engineering Branch (Series 130.18 - 130.54)
The following question has been responded to in this amendment:
130.52 IV.
Reactor Systems Branch (Series 212.153 - 212.159).
The following question has been responded to in this amendment:
1 212.154 i
V.
Effluent Treatment Systems Branch (Series 321.15 - 321.43 and 321.44 - 321.52)
The following questions have been responded to in this amendment:
r I
321.42 l
321.44 through 321.52 l
t l
t-
NRC Docket Nos. 50-454/455 50-456/457 Attachment B List of Round One and Round Two Questions Not Answered in Byron /
Braidwood FSAR Amendment No. 39 I.
Auxiliary Systems Branch (Series 010.0)
The following questions will be answered in future FSAR Amendments:
010.57 parts c, d, and e 010.58 II.
Power Systems Branch (Series 040.0)
The following question will be ansered in a future FSAR Amendment:
040.188 III.
Reactor Systems Branch (Series 212.0)
The following question will be answered in a future FSAR Amendment:
212.157 i
IV.
Equipment Qualification Branch (Series 271.0) l The following three questions will be answered in a i
future FSAR Amendment:
1 i
271.1 through 271.3 1
V.
Hydrologic and Geotechnical Engineering Branch (Series 362.0) i The following question will be answered in a future FSAR Amendment:
l 362.1 l
l l