Forwards LER 78-112/03L-0
Date released: 02/10/2020 Download: ML20027A507


LER 78-112/03L-0:on 781109,ST 5011.01, Boron Injection Flowpath Test Performed 7.5-h Later than Allowed.Caused by Sys Design Requiring Frequent Additions of Water.Facility Change Request Prepared