ML20027A371

From kanterella
Jump to navigation Jump to search
Forwards LERs 78-044/03L-1,77-089/03L-0,NP-33-77-64 & 77-097/03L-1
Date released: 02/10/2020 Download: ML20027A371


RO NP-33-77-64 on 770827:reactor Coolant Pump 1-1-2 Tripped Removing One of Two Reactor Coolant Pumps of Loop from Operation.B&C Phase Surge Capacitors Were Discovered to Be Damaged Due to Design Deficiency
ML20027A375
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/22/1978
From: Beeler T, Lingenfelter J
TOLEDO EDISON CO.
To:
References
Download: ML20027A375 (2)
LER 77-089/03L-1:on 771107,radiation Monitor RIS 2007 Was Showing Erratic Readings.Caused by Victoreen Low Range Amplifier Board 847-1-20 Failure.Board Replaced
ML20027A374
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/01/1978
From: Nelson J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20027A374 (3)
LER 78-044/03L-1:on 780430 & 0501,containment Atmosphere Gaseous Radioactivity Monitor Re 5030 Indicated Low Flow W/ Redundant Monitor Re 5029 Out of Svc,Placing Unit in Action Statement of Tech Spec 3.4.6.1
ML20027A373
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/24/1978
From: Kovach S
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20027A373 (3)
Forwards LERs 78-044/03L-1,77-089/03L-0,NP-33-77-64 & 77-097/03L-1
ML20027A370
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/14/1978
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20027A370 (1)