September 23, 1994
Georgia Power Company
ATTN:
Mr. J. T. Beckham, Jr.
Vice President, Plant Hatch
Nuclear Operations
P. O. Box 1295
Birmingham, AL 35201
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-321/94-17 AND 50-366/94-17)
Gentlemen:
This refers to the inspection conducted by James H. Moorman, III, of this
!
office on August 15 - September 2, 1994.
The inspection included a review of
activities authorized for your Edwin I. Hatch Nuclear Plant Units 1 and 2.
At
the conclusion of the inspection, the findings were discussed with those
members of your staff identified in the NRC Inspection Report, Enclosure 2.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
The violations are of concern because complete, accurate
records ensure reliability of the feedback process, which is an integral part
of the systems approach to training. Also, ensuring access to locked panels
is important to the implementation of an alternate safe-shutdown procedure.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparino your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to take to prevent recurrence. After reviewing your response
to this Notice, including your proposed corrective actions and the results of
future inspections, the NRC will determine whether further NRC enforcement
action is necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No/ 96-511.
9410130149 940923
ADOCK 05000321
i
i
G
j
'
t
I
.IEol
.
.
.
.
.
GPC
2
Should you have any questions concerning this inspection, please contact us.
,
Sincerely,
ORIGINAL SIGNED BY T. A. PEEBLES
Thomas A. Peebles, Chief
Operations Branch
Division of Reactor Safety
Docket Nos. 50-321, 50-366
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
J. D. Woodard
Harold Reheis, Director
Senior Vice President
Department of Natural Resources
Georgia Power Company
205 Butler Street, SE, Suite 1252
Nuclear Operations
Atlanta, GA 30334
P. O. Box 1295
Birmingham, AL 35201
Thomas Hill, Manager
Radioactive Materials Program
H. L. Sumner, Jr.
Department of Natural Resources
General Manager, Plant Hatch
4244 International Parkway
Georgia Power Company
Suite 114
Route 1, Box 439
Atlanta, GA 30354
Baxley, GA 31513
Chairman
S. J. Bethay
Appling County Commissioners
Manager Licensing - Hatch
County Courthouse
Georgia Power Company
Baxley, GA 31513
P. O. Box 1295
Birmingham, AL 35201
Ernie Toupin
Manager of Nuclear Operations
Ernest L. Blake, Esq.
Oglethorpe Power Corporation
Shaw, Pittman, Potts and
2100 E. Exchange Place
Trowbridge
Tucker, GA 30085-1349
2300 N Street, NW
Washington, D. C.
20037
Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker
Charles H. Badger
12th Floor
Office of Planning and Budget
1050 Connecticut Avenue, NW
Room 610
Washington, D. C.
20036
270 Washington Street, SW
Atlanta, GA 30334
4
. .
.
4
GPC
3
Curtis Coggin, Training and
Emergency Preparedness Manager
E.1. llatch Nuclear Plant
P. O.
Box 439
Baxley, GA 31513
Distribution w/encls:
K. N. Jabbour, NRR
P. H. Skinner, Ril
M. V. Sinkule. Ril
G. A. Itallstrom, Ril
B. T. Michael, Rll
l
Document Control Desk
NRC Senior Resident Inspector
U.S. Nuclear Regulatory Commission
11030 Hatch Parkway North
Baxley, GA 31513
l
i
- FOR PREVIOUS LIST OF CONCURRENCES, SEE ATTACHED
SEND
OFC
Rll:DRS
R!l:DRS
Rll:DRP
R!l:DRS
i
10
NAME
.!Moorman:jhm/fr
Llewyer
PSkinner **
1Peebles **
PDR7
4 ATE
09/
/94
09/
/94
09/
/94
09/
/94
/
/94
Yes
ho
COPY?
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Of f lCI AL RE CORD col'Y
DOCUMLN1 NAME: G:\\RPIS\\HA19417.JHM
.
.
Georgia Power Company
3
Distribution w/encls:
K. N. Jabbour, NRR
P. H. Skinner, RII
M. V. Sinkule, RII
G. A. Hallstrom, RII
Document Control Desk
NRC Senior Resident Inspector
U.S. Nuclear Regulatory Commission
11030 Hatch Parkway North
Baxley, GA 31513
SEND
OFC
RII:DRS
RII:DRS
Rll:DRP
RII:DRS
b
TO
NAME
JMoorman:jhm/f
Llewyer
PSkinner
TPeebles
PDR7
DATE
09/ Y /94
09/@\\ /94
09/ W /94
09 ' M/94
/
/94
h
No
4
ido
Yes
No
Yes
o
Yes
No
Yes
No
COPY 7
0FFICIAL RECORD COPY
DbCUMENT NAME: G: \\F.PT S\\HA19417.J HPa