Forwards Insp Repts 50-321/94-17 & 50-366/94-17 on 940815- 0902 & Notice of Violation.Violations of Concern Because Complete & Accurate Info Required to Ensure Reliability of Feedback Process,Being Integral Part of Sys Training
ML20024J278
Person / Time
Site: Point Beach, Hatch  NextEra Energy icon.png
Issue date: 09/23/1994
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Beckham J
GEORGIA POWER CO.
Shared Package
ML20024J279 List:
References
NUDOCS 9410130149
Download: ML20024J278 (4)


See also: IR 05000321/1994017

Text

,

,

.

September 23, 1994

Georgia Power Company

ATTN:

Mr. J. T. Beckham, Jr.

Vice President, Plant Hatch

Nuclear Operations

P. O. Box 1295

Birmingham, AL 35201

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-321/94-17 AND 50-366/94-17)

Gentlemen:

This refers to the inspection conducted by James H. Moorman, III, of this

!

office on August 15 - September 2, 1994.

The inspection included a review of

activities authorized for your Edwin I. Hatch Nuclear Plant Units 1 and 2.

At

the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the NRC Inspection Report, Enclosure 2.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

The violations are of concern because complete, accurate

records ensure reliability of the feedback process, which is an integral part

of the systems approach to training. Also, ensuring access to locked panels

is important to the implementation of an alternate safe-shutdown procedure.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparino your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to take to prevent recurrence. After reviewing your response

to this Notice, including your proposed corrective actions and the results of

future inspections, the NRC will determine whether further NRC enforcement

action is necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No/ 96-511.

9410130149 940923

PDR

ADOCK 05000321

i

i

G

PDR

j

'

t

I

.IEol

.

.

.

.

.

GPC

2

Should you have any questions concerning this inspection, please contact us.

,

Sincerely,

ORIGINAL SIGNED BY T. A. PEEBLES

Thomas A. Peebles, Chief

Operations Branch

Division of Reactor Safety

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encls:

J. D. Woodard

Harold Reheis, Director

Senior Vice President

Department of Natural Resources

Georgia Power Company

205 Butler Street, SE, Suite 1252

Nuclear Operations

Atlanta, GA 30334

P. O. Box 1295

Birmingham, AL 35201

Thomas Hill, Manager

Radioactive Materials Program

H. L. Sumner, Jr.

Department of Natural Resources

General Manager, Plant Hatch

4244 International Parkway

Georgia Power Company

Suite 114

Route 1, Box 439

Atlanta, GA 30354

Baxley, GA 31513

Chairman

S. J. Bethay

Appling County Commissioners

Manager Licensing - Hatch

County Courthouse

Georgia Power Company

Baxley, GA 31513

P. O. Box 1295

Birmingham, AL 35201

Ernie Toupin

Manager of Nuclear Operations

Ernest L. Blake, Esq.

Oglethorpe Power Corporation

Shaw, Pittman, Potts and

2100 E. Exchange Place

Trowbridge

Tucker, GA 30085-1349

2300 N Street, NW

Washington, D. C.

20037

Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker

Charles H. Badger

12th Floor

Office of Planning and Budget

1050 Connecticut Avenue, NW

Room 610

Washington, D. C.

20036

270 Washington Street, SW

Atlanta, GA 30334

4

. .

.

4

GPC

3

Curtis Coggin, Training and

Emergency Preparedness Manager

E.1. llatch Nuclear Plant

P. O.

Box 439

Baxley, GA 31513

Distribution w/encls:

K. N. Jabbour, NRR

P. H. Skinner, Ril

M. V. Sinkule. Ril

G. A. Itallstrom, Ril

B. T. Michael, Rll

l

Document Control Desk

NRC Senior Resident Inspector

U.S. Nuclear Regulatory Commission

11030 Hatch Parkway North

Baxley, GA 31513

l

i

    • FOR PREVIOUS LIST OF CONCURRENCES, SEE ATTACHED

SEND

OFC

Rll:DRS

R!l:DRS

Rll:DRP

R!l:DRS

i

10

NAME

.!Moorman:jhm/fr

Llewyer

PSkinner **

1Peebles **

PDR7

4 ATE

09/

/94

09/

/94

09/

/94

09/

/94

/

/94

Yes

ho

COPY?

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Of f lCI AL RE CORD col'Y

DOCUMLN1 NAME: G:\\RPIS\\HA19417.JHM

.

.

Georgia Power Company

3

Distribution w/encls:

K. N. Jabbour, NRR

P. H. Skinner, RII

M. V. Sinkule, RII

G. A. Hallstrom, RII

Document Control Desk

NRC Senior Resident Inspector

U.S. Nuclear Regulatory Commission

11030 Hatch Parkway North

Baxley, GA 31513

SEND

OFC

RII:DRS

RII:DRS

Rll:DRP

RII:DRS

b

TO

NAME

JMoorman:jhm/f

Llewyer

PSkinner

TPeebles

PDR7

DATE

09/ Y /94

09/@\\ /94

09/ W /94

09 ' M/94

/

/94

h

No

4

ido

Yes

No

Yes

o

Yes

No

Yes

No

COPY 7

0FFICIAL RECORD COPY

DbCUMENT NAME: G: \\F.PT S\\HA19417.J HPa