Forwards Insp Repts 50-313/94-07 & 50-368/94-07 on 940724-0903 & Notice of Violation
ML20024J261
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/05/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Yelverton J
ENTERGY OPERATIONS, INC.
Shared Package
ML20024J262 List:
References
NUDOCS 9410130106
Download: ML20024J261 (5)


See also: IR 05000313/1994007

Text

-

. _ - _ _ _ _ _ _ - _ - _ _ - _ _ .

________ - ____ - _ - -____

_____

_____-

_

p Hew

ONIT E D ST AT t'S

p

f

(

NUCLEAR REGULATORY COMMISSION

f

,

REGION IV

.

$

,f

611 R Y AN PL AZA DRIV E, SUITE 400

+

AR LINGTON TEXAS 76011 8064

OCT - 5 1994

Dockets:

50-313

50-368

Licenses:

DPR-51

NPF-6

Entergy Operations, Inc.

ATTN:

J. W. Yelverton, Vice President

i

'

Operations, Arkansas Nuclear One

1448 S.R. 333

Russellville, Arkansas 72801

SUBJECT:

NRC INSPECTION REPORT 50-313/94-07; 50-368/94-07 (NOTICE OF

VIOLATION)

This refers to the inspection conducted by Ms. L. J. Smith and other

inspectors of this office on July 24 through September 3,1994.

The

inspection included a review of activities authorized for your Arkansas

Nuclear One, Units 1 and 2, facility.

At the conclusion of the inspection,

the findings were discussed with you and those members of your staff

identified in the enclosed report.

i

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

I

activities in progress.

The purpose of the inspection was to determine

I

whether activities authorized by the license were conducted safely and in

accordance with NRC requirements.

Based on the results of this inspection, certain licensed activities appeared

f

to be in violation of NRC requirements as specified in the enclosed Notice of

l

Violation (Notice).

The first violation involves two examples of:

(1) the

failure to lock Unit I feedwater line vent valves which are manual reactor

building isolation valves, and (2) the failure to include the same valves in

the procedure used to check valve positions prior to criticality.

While the

failure of these valves to be correctly positioned during power operations

would quickly be detected, the violation is still of concern because your

staff has incorrectly interpreted that manual reactor building isolation vent

and drain valves on lines which fall undr - the scope of 10 CFR Part 50,

Appendix A, General Design Criteria 57, " Closed System Isolation Valves," do

not have to be locked.

The second violation involving the inadvertent omission of a change to a

maintenance procedure is not being cited because the criteria in

paragraph Vll.B.1 of Appendix C to 10 CFR Part 2 of the NRC's " Rules of

Practice" were satisfied.

&$Y?

9410130106 941005

PDR

ADOCK 05000313

G

PDR

hI

!

-

- - - -

--

.

.

Entergy Operations, Inc.

-2-

The inspection also identified an unre',olved item concerning the low pressure

safety injection motor-operated valves which would not close to a leak tight

configuration in the presence of a design basis check valve leakage.

This

matter is discussed in Section 7 of the enclosed inspection report.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions ycu plan to prevent recurrence. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NP.C Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

i

I

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

-

A. Bill Beach, Director

Division of Reactor Projects

v

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-313/94-07; 50-368/94-07

cc w/ enclosures:

Entergy Operations, Inc.

ATTN:

Harry W. Keiser, Executive

Vice President & Chief Operating Officer

D.O.

Box 31995

Jackson, Mississippi

39286-1995

Entergy Operations, Inc.

ATTN:

Jerrold G. Dewease, Vice President

Operations Support

P.O. Box 31995

Jackson, Mississippi

39286

__

-

-.. .

.

.

.-

-

- - .

..

.

. _ _

...

.

.

Entergy Operations, Inc.

-3-

Wise, Carter, Child & Caraway

ATTN:

Robert B. McGehee, Esq.

P.O. Box 651

Jackson, Mississippi

39205

,

Honorable C. Doug Luningham

County Judge of Pope County

Pope County Courthouse

Russellville, Arkansas 72801

Winston & Strawn

j

ATTN: Nicholas S. Reynolds, Esq.

i

1400 L Street, N.W.

Washington, D.C.

20005-3502

Arkansas Department of Health

ATTN:

Ms. Greta Dicus, Director

Division of Radiation Control and

Emergency Management

4815 West Markham Street

Little Rock, Arkansas 72201-3867

,

i

B&W Nuclear Technologies

ATTN:

Robert B. Borsum

Licensing Representative

1700 Rockville Pike, Suite 525

Rockville, Maryland 20852

Admiral Kinnaird R. McKee, USN (Ret)

214 South Morris Street

Oxford, Maryland 21654

i

ABB Combustion Engineering

Nuclear Power

ATTN:

Charles B. Brinkman

Manager, Washington

i

Nuclear Operations

12300 Twinbrook Parkway, Suite 330

!

Rockville, Maryland 20852

I

. _ . , _ . _ , . _ . . _

_

.

.

OCT - 51994

Entergy Operations, Inc.

-4-

E-Mail report to D. Sullivan (DJS)

bcc to DMB (IE01)

.

bcc distrib. by RIV:

L. J. Callan

Resident Inspector

'

Branch Chief (DRP/D)

Leah Tremper, OC/LFDCB, MS: MNBB 4503

MIS System

DRSS-FIPB

i

RIV file

Branch Chief (DRP\\TSS)

i

Project Engineer (DRP/D)

A. B. Beach, D:DRP

i

,

SRI:DRP/D

C:DRP/Dr-Qf

D

RP l

,

LJSmith

CAVanDenahgh

ABdifl[

9/13/94

10/^9/94

10/5/94

,

\\

1

-

OCT - 5 1994

Entergy Operations, Inc.

-4-

E-Mail report to D. Sullivan (DJS)

bec to DMB (IE01)

bcc distrib. by RIV:

L. J. Callan

Residentinspebtor

Branch Chief (DRP/D)

Leah Tremper, OC/LfDCB, MS: MNBB 4503

MIS System

DRSS-FIPB

RIV file

Branch Chief (DRP\\TSS)

Project Engineer (DRP/D)

A. B. Beach, D:DRP

SRl:DRP/D

C : DRP / Dr-\\\\(

D hRP }s

CAVanDenNgh

A!lB)P3

LJSmith

9/13/94

10/1 /94

10/5/94

jl