ML20024J228
| ML20024J228 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 10/05/1994 |
| From: | Wiggins J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| GL-89-10, NUDOCS 9410130011 | |
| Download: ML20024J228 (3) | |
Text
.
- ~.
October 5, 1994 Docket Nos. 50-352 50-353 Mr. D. M. Smith Senior Vice President -
Nuclear PECO Energy Nuclear Group Headquarters i
Correspondence Control Desk P. O. Box 195 Wayne, PA 19087-0195
Dear Mr. Smith:
SUBJECT:
MOTOR-0PERATED VALVE ISSUES WITH SPECIAL EMPHASIS ON THE PROCESS FOR CLOSING OUT GENERIC LETTER 89-10 I am extending an invitation to Region I licensees to participate with the Office of Nuclear Reactor Regulation (NRR) and Region I representatives in a discussion of Generic Letter (GL) 89-10 motor-operated valve programs.
Special emphasis will be placed on the NRC's expectations for completion of GL 89-10 programs, and on our intended closure process for that Generic Letter.
The meeting will be held on Wednesday, October 26, 1994, from 8:00 a.m. to 4:30 p.m., at the Park Ridge Hotel, King of Prussia, Pennsylvania (610-337-1800). The meeting is open for public observation and will be attended by NRC Region I and NRR staff.
We request that you consider sending 2 to 3 members of your staff and management associated with the GL 89-10 program.
To make the meeting as productive as possible, please provide a preliminary list of questions / issues, and indicate who will represent you at the meeting by October 18, 1994.
Those questions and issues will form the bases for additional discussions.
We also intend to present overviews by both NRC and utility managers, presenting their perspective on GL 89-10 issues. An agenda for the meeting is attached for your information.
9410130011 941005 DR
/ ')DCK 0500 2
d I
October 5,-1994 s
Mr. D. M. Smith 2
Questions regarding the meeting details and feedback on questions and
}
attendess may be directed to Gene Kelly of my staff at (610) 337-5111.
I look forward to our meeting.
Sincerely, ORIGINAL SIGNED BY:
JAMES T. WIGGINS James T. Wiggins, Director Division of Reactor Safety i
Attachments:
- 1. Meeting Notice
- 2. Agenda
\\
cc w/ encl:
J. Doering, Chairman, Nuclear Review Board 1
D. R. Helwig, Vice President - Limerick Generating Station G. A. Hunger, Jr., Director - Licensing J. L. Kantner, Regulatory Engineer - Limerick Generating Station Secretary, Nuclear Committee of the Board i
Public Document Room (PDR) local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PA0 (20) SALP Reports, AIT, Special Insp. Rpts, and (2) Insp.
Rpts.
NRC Resident Inspector l
Commonwealth of Pennsylvania bec w/ encl:
Region I Docket Room (with concurrences) l K. Gallagher, DRP W. Dean, OED0 F. Rinaldi, NRR M. Thadani, Acting PDI-2, NRR
{
M. Shannon, ILPB i
DRS Fi'les (2)
DOCUMENT NAME: A: LIM To tweive a cory of this document. indicate io-the box: *C" = Copy without attachment / enclosure
'E' = Copy with attachment / enclosure
'N' = No copy
{
OFFICE RI/DRS A
/ / RI/DRS N RI/
l RI/
l RI/
s NAME KELLY W 46/l WIGGINS(% W DATE 10/04/94
~ ~/
10/ Q /94 10/
/94 10/
/94 10/
/94 i
/
OFFICIAL RECORD COPY
i U.S. NUCLEAR REGULATORY COMMISSION RI 94-119 REGION I l
NOTICE OF SIGNIFICANT LICENSEE MEETING Licensees; Baltimore Gas and Electric, Calvert Cliffs (50-317; 50-318)
Facilities; Boston Edison, Pilgrim (50-293) i Docket Nos.
Connecticut Yankee Atomic Power, Haddam Neck (50-213)
Consolidated Edison, Indian Point 2 (50-247)
Duquesne Light Company, Beaver Valley 1&2 (50-334; 50-412)
GPU Nuclear Corporation, Three Mile Island 1&2 (50-289; 50-320),
Oyster Creek (50-219)
Niagara Mohawk Power Corp, Nine Mile Point 1&2 (50-220; 50-410)
Northeast Nuclear Energy Co., Millstone 1,2&3 (50-245; 50-336; 50-423)
North Atlantic Energy Service Corp., Seabrook (50-443) t PECO Energy, Limerick 1&2 (50-352; 50-353)
Pennsylvania Power & Light, Susquehanna 1&2 (50-387; 50-388)
New York Power Authority, Indian Point 3 (50-286),
J.A. FitzPatrick (50-333) i Public Service Electric & Gas, Salem 1&2 (50-272; 50-311),
j Hope Creek (50-354) i Rochester Gas & Electric, Ginna (50-244) l Vermont Yankee Nuclear Power Corp., Vermont Yankee (50-029)
Time and Date:
Wednesday, October 26, 1994, 8:00 a.m. to 4:30 p.m.
Location:
Park Ridge Hotel King of Prussia, Pennsylvania (610) 337-1800
Purpose:
Discussion of motor-operated valve issues with Region I licensees.
l Special emphasis will be placed on the principal technical issues,-
expectations for completion of programs, and the process for closure of Generic Letter 89-10, " Safety-Related Motor-0perated Valve Testing and Surveillance."
i NRC Attendees:
W. Kane, Deputy Regional Administrator J. Wiggins, Director, Division of Reactor Safety (DRS)
R. Wessman, Chief, NRR, Mechanical Engineering Branch (MEB)
E. Kelly, Chief, DRS Systems Section T. Scarbrough, Senior Mechanical Engineer, NRR, MEB NOTE:
(1)
Attendance by NRC personnel at the NRC/ Licensee meeting should be made known by i
October 17, 1994, via telephone call to E. Kelly (610) 337-5111.
(2)
Due to the subject matter and nature of this meeting, this meeting is open for observation by members of the general public.
i b
Approved By:
74' E. N. Ke y, Chief System / ection Divisi n of Reactor S ety t
i f
9 r "" -
'-P
I AGENDA MOTOR-0PERATED VALVE MEETING 26 0CTOBER 1994 8:00 A.M.
Welcome and Opening Remarks by William Kane, Deputy Regional Administrator, NRC Region I 8:15 A.M.
Keynote:
" Expectations for Completion" by James Wiggins, Director, Division of Reactor Safety, NRC Region I 8:30 A.M.
" Utility Perspective" by James Riedel, MOV Project Manager, Baltimore, Gas & Electric Co. (BG&E) 9:00 A.M.
" Process for Closure and Periodic Verification" by Richard Wessman, Chief, NRR, Mechanical Engineering Branch (MEB) Division of Engineering 9:30-10:30 A.M.
Breakout Sessions i
1 10:30-10:45 A.M.
Break 10:45-11:30 A.M.
Feedback 11:30-1:00 P.M.
Lunch 1:00-1:30 P.M.
" Examples of GL 89-10 Closure" by Thomas Scarbrough, Senior Engineer, NRR, MEB 1:30-2:00 P.M.
" Utility Perspective" by Steven Maginnis, MOV Project Manager, Public Service Electric & Gas Co. (PSE&G) 2:00-2:15 P.M.
Break 2:15-4:15 P.M.
Questions and Answers Panel Session 4:15-4:30 P.M.
Closing Remarks by Eugene Kelly, Chief, Systems Section, Division of Reactor Safety
_ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _