ML20024J219

From kanterella
Jump to navigation Jump to search
Mod 1,revising SOW to Reflect within Scope Change Increase Contract Ceiling Amount & Obligated Amount & Transfer Government Equipment To,Operation & Maint of Radiation Exposure Info Reporting Sys (REIRS) Database
ML20024J219
Person / Time
Issue date: 08/17/1994
From: Mace M, Young B
NRC OFFICE OF ADMINISTRATION (ADM), SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
To:
References
CON-FIN-W-6358, CON-NRC-04-94-053, CON-NRC-4-94-53 NUDOCS 9410120215
Download: ML20024J219 (7)


Text

.

+

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT SF30, Page 1 of 2 Pages

" MIRACT ID CCCE

.FFFECTIVE DATE A?*NDMENT/ MODIFICATION NO.

d 2

8/8/94 4

REQUISITION / PURCHASE REQ. NO.

fr PROJECT NO.

(If applicable)

RES-94-053 NRC-04-94-053 6.

ISSUED BY Code 7.

ADMINISTERED BY Code (If other than Item 6)

U.S.

Nuclear Regulatory Commission Division of Contracts & Property Mgmt.

Technical Acquistion Br. #1 Washington, D.C.

20555 I

E NAME AND ADDRESS OF CONTRACTOR (No.

[

9A. AMENDMENT OF SOLICITATION NO s.reet, County, State and ZIP Code)

. DATED (See Item 11) 9-ience Applications International

)

CcrporaL:on l_

R.: search and Development (Company 1:

~X 20A. _ _ MOD. OF CONTRACT / ORDER NO.

1G2CO Campus Point Drive NRC-04-94-053 San Diego, California 92121 10B. DATED (See Item 13)

Principal Investigator / Technical 9/5/94 Cantact: Brenda Young Tolephone No: (615) 482-9031

~~

11. THIS ITEM ONLY APPLIES TO AMERDMENTS OF SOLICITATIONS

( ) The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [

is extended, [ ] is not extended. Offerors must acknowledge receipt of :.his amendment prior to the i

hour and date specified in the solicitation or as amended by one of the following methods:

(a' By completing Items 9 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a refe ance to the solicitation and amendment numbers.

FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FCR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already i

submitted, such change may be made by telegram or letter, provided each j

telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

)

12. ACCOUNTING AND APPROPRIATION DATA (If requi red)

APPN No.

31X0200.460 B&R No.: 4606080100 BOC: 252A Job Code: W6358 OBLIGATED AMOUNT: $164,806.00 EXCEPTION TO STANDARD FORM 30 STANDARD FORM 30(REV 10-83)

APPROVED BY GSA/IRMS 9-87 FAR(48 CFR) 53.243 9410120215 940817 L

(Q PDR CONTR NRC-04-94-053 ppg

)

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT SF30, Page 2 of 2 Pages i

1

il s ITEM APPLIES 'NLY TO MODIFICATICW JF CONTRACTS / ORDERS. IT MODIFIES Ti CtN:'RACT/ ORDER NO. AS DESCRIBED I N Il ' :4.

i j A.THIS CHANGE ORDER IS ISSUED PURSUANT TU: (Specif y authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT / ORDER NO. IN ITEM 10A.

i ) B.THE ABOVE NUMBERED CONTRACT / ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data,etc.) SET FORTH IN ITEM 14, PURSUIJJT TO THE AUTHORITY OF FAR 43.103 (b).

[ X '!

C.THIS SUPPLEMENTAL AGREEMENT IS ENTEREE INTO PURSUANT TO AUTHORITY OF-Changes -Cost Reimbursement, ALT 1 (FAR 52.243-2)

{ ] D.OTHER (Specify type of modification and authority) i E.

IMPORTANT: Contractor { j is not, {X) is required to sign this document and return 2 copies to the issuin- : ; ice.

14.

3ESCR I PTION OF AMENPGNT/MODIF1 CAT"!

r,anized ny UCF section headings,

~

ncluding solicitation / contract eubj.

m:itter where feasible) i r

Sa Continuation Sheetis) r Except ar provided herein, all terms and conditions of the document referenced in Item 9A cv 10A, as heretofore changed, t'emain unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

O. N7LME IdJD TITLE OF CONTRACTING (Type or print)

OFFICER (rype or print)

Tmrn J. Lug, Senior 0:Pm1 Itpnrmtative Mary H.

Mace frimae tfpliatias Intenuticrwl Cttpratim Contracting Officer 15B. CO' TRACTOR / OFFEROR

~

33. UN 7ED STAT S OF sMERICA J!,Nflbu

!lh l

Jhm (Signature of ;e rsc 2 authorized to sign)

[Si at 'ie o'f' Cont scting Of ficer) 15C. DATE SIGNED oC. DATE SI NEI)/

Atxpst 25,19X

_f

,// - tf -

EXCEPTION TO STANDARD FORM 30 t

APPROVED BY GSA/IRMS 9-87 f

e i

I I

h

=-

l h

I NRC-04-94-053 i

Modification No. 1 i

Page 3 (>f J l

l The purpose of this modification is to:

(1) revise the statement of work to reflect a within scope change. (2) increase the contract ceiling amount by 5595.159.00 from 5555.683.00 to 51.150.842.00. (3) increase the obligated dmount by 5164.806.00 from 5300.000 to 5464.806.00. and (4) transfer government equipment accuired from NRC-04-91-054 with SAIC, for the use under i

this contract, in accorcance with your letter request dated August 12. 1994.

Accordingly, the contract is hereby modified as follows:

j 1

The attached " Statement of Work. Modification No.1" is hereby incorporated into and made a part of Section C.1 of the contract.

This

+

effort shall be performed in accordance with the contractor's i.echnical i

propesal dated August 1. 1994.

2.

Under Section B.3. " Items and Prices" line item nos. I and 2 are deleted l

in their entirety and the followina is substituted in lieu thereof:

l i

" Item Supplies / Services Quantity Unit Evt enced No Price fear 1709.197.00 1.

Year 1 (Base Year 1) i 2.

Year 2 (Base Year 2)

Year 5441.645.00" 3.

Under B.4. " Consideration and Obilgation, paragraphs a. and c. are deleted in their entirety and the fNlowing paragraphs are substituted in lieu thereof:

"a.

The total estimated cost to the Government for full performance of this contract is 51.150.842.00 of which the sum of 51.082.859.00' represents the estimated relmbursable cost and of which j

567.983.00 represents the fixed fee.

i c.

The amount currently ob'igated by the Government with respect to this contract is $464.806,00."

A summary of obligations under this contract from date of award through the effective date of this modification are as follows:

l Total FY 94 Obligations:

5300.000.00 Total FY 94 Reimbusable DOE Obligations:

5164.806.00 Cumulative Obligations:

5464.806.00 j

This modification obligations DOE funds in the amount of $164.806.00.

NRC-04-94-053 Modification No.1 5

Page 3 of 4 i

4.

Under Section H.3. Government furnishec Equ13 ment / Property (JUNE 1988).

the following items are included in paragrap1 a.

"One (1) Laser Jet IV HP (Serial No. VSTC036829) i Five (5) 386 PC (Serial Nos. NRC054-1. 2. 3. 4, 5) l One (1) Print Sharing Device (Serial No. 472880) 1 One (1) Disk Drive (Serial No. AB13702008)

One (1) Microvax (Serial No. KA138H3008) i' One (1) 8MM Tape Drive Subsystem (Serial No 570009-001)"

All other terms and conditions of the subject contract remain unchanged.

l 5

i l

l i

i i

l l

h i

t STATEMENT OF WORK MODIFICATION NO. 1 RADIATION EXPOSURE MONITORING SYSTEM 1-BACKGROUND i

The purpose of this effort is to assist the DOE Office of Health Physics l

and Industrial Hygiene in: (1) The development of health surveillance support systems: (2) the innovative application of lessons learned from related experiences: and (3) the sharing and transfer of technology currently used by the NRC to support DOE's programs.

2 SCOPE OF WORK The contractor shall develop a prototype system to collect, maintain, and report radiation exposures of DOE employees. DOE contractors, and t

visitors to DOE facilities.

This shall be conducted in accordance with the tasks described below.

Task 1: Radiation Exposure Monitoring System (REMS) Design and Prototype Demonstration 6.

Develop a conceptual design for the system.

b.

Prepare a draft system design report for DOE review and comment.

c.

Develop a prototype demonstration of the system.

d.

Complete a final system design report incorporating DOE comments, NOTE:

The design shall satisfy requirements and objectives identified previously in a system evaluatinn cf the DOE Radiation Exposure Module.

the prototype shall demonstrate the transfer of technologies currently deployed by the NRC integrated into the DOE environment.

Task 2:

System Implementation a.

Test and deploy the system for DOE review.

b.

Prepare a user training plan.

c.

Compile program documentation into a reference manual.

d.

Develop user documentation including user guides and manuals.

Task 3:

Enhancement to the System a.

Implement connectivity capability for data exchange with sites to collect and share information on line.

b.

Migrate to full client server technology, c.

Transport Radiation Exposure Monitoring System (REMS) to other hardware platform, upon request of DOE.

.~.

l

' L 3-QUAL.FICATIONS l

The personnel assigned to this work shall have the following i

qualifications:

a.

Experience in database design and implementation on open systems using Relational Data Base Management System. Fourth Generation Language, and Graphical User Interface technology.

b.

Knowledge of. and experience in. collection, maintenance.

analysis. and reporting of radiation exposure to personnel.

c.

Knowledge of DOE radiation protection directives, mission. and requirements d.

Knowledge and experience of working with radiation exposure and demographic information.

4.

DELIVERABLES TASK 1.

o A draft system design report hall be prov10ed to the NRC and DOE Project Officer for revie'./ and comments by August 31. 1994 o

A prototype demonstration shall be provided to the NRC and DOE September 15. 1994.

t o

DOE and NRC comments on the draft design report will be provided to the contractor by September 30. 1994.

i o

A final system design report incorporating DOE and NRC comments, shall be provided to DOE and NRC by October 15. 1994.

TASK 2:

o A working system shall be delivered to DOE by December 1. 1994.

o A user training plan shall be provided to DOE and NRC by December i

1. 1994.

o Program documentation shall be organized and compiled into a reference manual and provided to DOE and NRC by December 15. 1994.

o User documentation including user guides and manual shall be provided to DOE and NRC by January 1. 1995.

o A systems operations manual shall be provided to DOE and NRC by f

January 1. 1995.

i o

A system shall be piloted at one pilot site by January 1. 1995.

L L

I/M 3:

tuA 5.

MEET]NGS NJD TRAVEL It is estimated that there will be ten (10) trips three days each, for l

2 people to Washington, D.C., and six (6) trips. three days each to 4 00E sites.

6.

PERIOD OF PERFORMANCE lhe period of performance shall commence on August 8. 1994 and continue thrnugh December 31. 1995.

/

ESTIMATED LEVEL OF EFFORT The est 1 mated level of ef fort i s 8.32E siaff nours.

o l

t i

b i

i h

i c

=

, +.. -

--. - ~

-v

-~

-