ML20024J088

From kanterella
Jump to navigation Jump to search
Notification of 940815 Amended Meeting W/Nei in Rockville,Md to Prevent Draft Guidance Document on Integrated Safety Analysis of Nuclear Fuel Cycle Facilities
ML20024J088
Person / Time
Issue date: 09/15/1994
From: Sherr T
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20024J089 List:
References
NUDOCS 9409270285
Download: ML20024J088 (3)


Text

,.-

b MEETING NOTICE - AMENDED Sjteper15,19 j

l FXPANDED AGENDA AND LOCATION CHANGE i

Date and Time:

Wednesday, September 21, 1994 8:30 a.m.

l Location:

U.S. Nuclear Regulatory Commission Two White Flint North ASLBP Hearing Room, Room T3-845 11545 Rockville Pike Rockville, Maryland Purpose of Meeting:

As published in the Monday, August 15, 1994, Federal j

Reaister (FR59/41800), the Nuclear Regulatory Commission will hold a workshop to present a draft guidance document on Integrated Safety Analysis of nuclear fuel cycle faclities.

The agenda for this workshop has been expanded to include a presentat;on by the facilit) Operations Committee, Nuclear Ene gy institute (NEI), on their proposed Quality Assurance I

and Self-Assessment Programs for fuel fabrication and enrichment faclities.

The location of the meeting has been changed to the ASLBP Hearing Room as indicated above.

NRC

Participants:

T. Sherr, FRIB

{

(Preliminary list)

B. Mendelsohn, FRIB R. Milstein, FRIB l

Other

Participants:

F. Killar, Director, Material Licensees Programs (Preliminary list)

Facility Operations Committee, NEI t

Contact:

Elizabeth Suarez, 301-415-8094.

l

!s/ B.T Men 4/s4 hheodoreS.Sherr, Chief j

y Regulatory and International l

Safeguards Branch 1

Division of Fuel Cycle Safety and Safeguards k 4,0 9

((Mc Office of Nuclear Material Safety PDR and Safeguards l

cc:

Participants R. F. Burnett, FCSS E. Q. Ten Eyck, FCSS 2(j[j Distribution:

Participants FRIB r/f

(}{lej(jtj g PDR (PLEASE POST)

Section r/f Central Files

_p

,i 0FC FRIlh 0 C

FRIB8,-/EC FRI# A C

.v v.

/va NAME ES BMendelsohn 24T4 herr DATE 9/15/94 9//f/94 9/ /[/94 C= COPY E = COVER & ENCLOSURE N = NO COPY Ocm #lcc rt r5-s 0FFICIAL RECORD COPY

>' - " " N ^ ~ ~ #

  • C

.. _ ~. - -.. -

c

~

1

.\\

l

]

g,

_-; p. +

I I

TICKET l

l DATE RECEIVED: 09/09/94 ORIGINAL DUE DT: 09/26/94 CONTROL NO: 9400411 DIVISION DATE: 09/26/94 DOC DT: 09/08/94 FROM:

TIME: 00:00 COMP DT:

/

/

L nehan/Dattilo

/

TO:

Division Directors FOR SIGNATURE OF :

    • BLUE **

SECY NO:

ASSIGNED TO:

CONTACT:

[

DWM

//

IMNS fj gjg,;

T SS DESC:

ROUTING:

EDO PROGRAM REVIEW Arlotto l

Linehan Dattilo Poland SPECIAL INSTRUCTIONS OR REMARKS:

EACH DIVISION RECEIVED A COPY OF THE ATTACHED MEMO YESTERDAY WITH AN ATTACHMENT BUT WITHOUT A TICKET.

ATTACHED IS A COPY OF THE MEMO ONLY WITH A TICKET FOR ACTION.

7 ff)pgkWL6 /1AG( f// FLY g,na; led h

  • I';/ 9 99' ccRFJ Apa pbI

-)/4j

~,;

r y

(

k&

f J!!

~ ll'!l -

~

,y, o

n l

(

p*

7 )J

[,,$ y

{

y

/

p, f

j.

A TICKET r"

(*

DATE RECEIVED: 09/09/94 ORIGINAL DUE DT: 09/30/94 CONTROL NO: 9400414

]

DIVISION DATE: 09/27/94 DOC DT: 09/08/94

~'

FROM:

TIME: 00:00 COMP DT:

/

/

1 Richard Bangart h.

/

b Director, OSP TO:

Bernero FOR SIGNATURE OF :

    • BLUE **

SECY NO:

[ / ghg ASSIGNED TO:

CONTACT:

IMNS Combs 1

DWM

EdSS ~

h f((

~

DESC:

ROUTING:

REGUEST FOR COMMENTS ON MANAGEMENT DIRECTIVE 5.7 Bernero

" TECHNICAL ASSISTANCE TO AGREEMENT STATES" Arlotto Linehan l

Poland l

l SPECIAL INSTRUCTIONS OR REMARKS:

IMNS (Combs) has the lead.

DWM/FCSS - Please provide input to IMNS by 9/27/94.

IMNS will consolidate input and provide a final response for Bernero's signature by 9/30/94.

Final response is due to OSP by 10/3/94.

l fj Q

f(

l h j7)d hf P}

4p /t

.