U 0 6 Ig**
Albert R. Chernoff, Projes.t Manager Uran.ium Mill Tailings Remedial Action Project Office U.S. Department of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerque, New Mexico 87115
Dear Mr. Chernoff:
SUBJECT:
MEXICAN HAT / MONUMENT VALLEY SITE VISIT On May 18, 1994, Daniel Rom and Ted Johnson of the Engineering and Geosciences Branch, and Robert Carlson of my staff, made a construction review visit to the Mexican Hat, Utah, and Monument Valley, Arizona, Uranium Mill Tailings Remedial Action Project sites.
The visits were routine and announced.
On May 18, 1994, the staff observed the construction of the radon barrier at Mexican Hat, and witnessed testing of the rock foundations for the toe of the coll.
Construction testing and inspection records were reviewed at the Remedial Action Contractor office.
Enclosed is the Mexican Hat on-site construction review report for your information.
No open issues were generated from the review, if you have any questions regarding the site visits or the attached report, please contact Robert Carlson at (301) 415-8165.
Sincerely, M/
Joseph J. Holonich, Chief High-level Waste and Uranium Recovery Projects Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards
Enclosures:
As stated cc:
R. Edge, DOE, AL C. Smythe, DOE, Al Q_ISTRIBUTION: Central File DWM r/f KMcConnell JAustin MFederline NMSS r/f TJohnson 94o711o180 940705 PDR WASTE
- See previous concurence WM-63 PDR Msrk/Small:BoxesPin ConcuFrence' Block to Define'Distributioh CopfPreferehee; In small'~ Box on~"0FC:" line enteri'C = Cover E = Cover &~ EnclosureN = No" Copy
~~
~
~
~
0FC HLUR E
ENGB e
ENGB HLUR HLUR, 4 _
h NAME RMb
- kob
- MBell
- DGillen JH$bch DATE 06/22/94 H
06Ao/94 06/ /94 06/ /94 OI///94 Path & File Name: S:\\HLUR\\RDC\\HATM01.SV 0FFICIAL RECORD COPY In small Box on "DATE:" line enter: M = E-Mail Distribution Copy H = Hard Copy
)
POR : YES X
NO Category:
Proprietary or CF Only ACNW: YES
.X_
N0 E.-
IG
- YES NO Y
Delete file after distribution:
Yes No
(. [ e L.,
I
l On-Site Construction Review Report facility Nai..
Mexican Hat, Utah, UMTRA Project Site Review Conducted: May 18, 1994 NRC Personnel:
Daniel Rom Ted Johnson Robert Carlson Review Summary:
Areas Reviewed:
The staging area for mixing of sand and bentonite for the radon barrier, the upper surface of the disposal cell, and the toe areas of the cell were observed by T. Johnson and D. Rom.
R. Carlson toured the Monument Valley site with representatives of Morrison-Knudsen (MK) and U.S. Department of Energy (00E).
A copy of the On-Site Construction Review Plan (0CRP) is attached.
Details:
1.
Persons Contacted:
Russell Edge - 00E Bob Myers - MK-ES Tim Swisse - MK-F Don Janz - MK-F Jose Cercone - MK-ES 2.
Eauipment at Mexican Hat Site:
09N Dozer with Ripper 631E Scraper (3)
Komatsu WA600 Loader Water Wagon Komatsu PC300 Trackhoe 631D Water Wagon Komatsu WA500 Loader (2) 825C Compactor Caterpillar 16G Blade Triple Deck Screen Caterpillar 16G Patrol Pugmill w/ Ripper Komatsu D65EX Dozer 140G Blade Ingersoll-Rand SD100 Roller Conveyor, 36" x 45' Tuthill Deutz Blower Conveyor, 30" x 62' John Deere Blower Conveyor, 36" x 80' Electric Blower 3.
Eautoment at Monument Valley Site None ENCLOSURE
4.
Site Review:
Proaress Update (OCRP ltem 1)
The reviewers met DOE and MK personnel on-site at the W office at 9:00 AM.
The staff was briefed on the project status, and orientation was provided to Mr. Carlson.
Messrs. Rom and Johnson then performed a walking tour of the toe of the disposal cell foundation area, and observed rock capability testing operations. A power auger and power excavator were being used by DOE to evaluate rock capability and continuity.
Mr. Rom observed the bentonite mixing operations at the pugmill and radon barrier placement operations on the cell.
Disposal Cell at Mexican Hat (0CRP ltem 1)
The tailings haul to the cell from Monument Valley was complete. Motorized equipment were in the process of placing blended sand-bentonite radon barrier material on the cell. Records indicated that the required minimum 10 percent bentonite was being added to the sand.
The blended cover material a)peared uniform and easy for equipment to place and compact.
The radon aarrier surface was rolled until satisfactory densities were attained.
A small test pad for bedding material had been constructed.
The contractor expressed some concern regarding the ability of the bedding to withstand repeated traffic loadings during the course of placement. Various approaches to controlling such problems, should they occur, were discussed.
Processina Site at Monument Vallev (OCRP ltem II)
R.
Carlson toured the Monument Valley site with DOE and MK personnel.
Remedial action was complete at Monument Valley, and no construction activity was observed.
The perimeter fence around the site was checked and found to be in good condition. The purpose of the fence is to prevent animal grazing while revegetation is occuring. Vegetation was beginning to grow within the fenced-in area at the site.
DOE's mitigation plan for site restoration of wetlands adjacent to the site was accepted by the Corps of Engineers, and the wetlands appeared to be in good condition.
5.
Records Review (OCRP ltem III):
The construction records generated since the time of the last visit were reviewed at Mexican Mat.
The records were found to be complete and up-to-j date, with the minimum test frequency requirements met.
New Proctor test forms were in use. The new forms were computer-generated and included zero-air voids curves.
The new forms correct a potential deficiency, since the l
zero-air -voids and specific gravity information is shown.
Informal interviews were conducted with MK personnel.
i 1
2
9 4
6.
Exit Interview (OCRP ltem til-C):
At the close of the review the staff met with DOE and MX representatives. It was determined that the field procedures were satisfactory, and that no open issues were identified.
l 3
l
~ _.
ON-SITE CONSTRUCTION REVIEW PLAN MEXICAN HAT / MONUMENT VALLEY UMTRA PROJECT SITE, 5-18-94 CONTACT:
Russell Edge, DOE Site Manager 505-845-6130 DATE:
May 18, 1994 (Announced)
TEAM MEMBER, ASSIGNMENTS:
Daniel Rom - Geotechnical Engineering Ted Johnson - Surface Water Engineering Robert Carlson - Project Manager PURPOSE:
Rock durability verification; Routine observation of construction operations; Construction records review SCOPE:
I.
Mexican Ha': Disposal Site A.
Meet R.
Edge (DOE) at Project Office 0 8:30 AM.
Discuss rock durability issues, construction progress, and any other issues pertaining to current on-site activities.
B.
Observe material placement operations at disposal site, if any.
C.
Review results of rock durability and gradation testing.
D.
Observe rock capability testing in toe areas.
E.
Take photographs of construction activity.
II.
Monument vallev Site A.
Tour site for familiarization (Carlson).
B.
Observe any radiological testing which may be underway.
C.
Observe nearby surface water features.
III.
MK Mexican Hat Office A.
Review written records of construction activity B.
Discucs implications of new cell design with respect to differential settlement and cover cracking C.
Conduct informal interviews with personnel D.
Conduct Exit Interview
e i
REVIEW SCHEDULE AND ROUTINE:
Entrance meeting:
8:30 A.M.,
May 18, 1994 Exit Meeting:
2:30 P.M.,
May 18, 1994 Normal hours:
assumed 7:00 A.M.
- 4:00 P.M.
Motel:
Monticello Best Western Confirmation # "Vicki S-11" l
801-587-2261 Government rate $40 l
i l
l l