August 11, 1993 Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 Georgia Power Company ATTN: Mr. J. T. Beckham, Jr.
Vice President. Plant Hatch Nuclear Operations P. O. Box 1295 Birmingham, AL 35201 l
Gentlemen:
SUBJECT:
ACCEPTANCE OF CHANGES TO THE OPERATIONAL QUALITY ASSURANCE PROGRAM FOR EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 l
We have reviewed your request, dated May 28, 1993, to revise the biennial l
review of procedures. The proposed changes to Section 13.5.1 for Unit 2, and l
Section 13.7 for Unit 1 of your FSAR would replace the commitment to review l
procedures on a two year cycle as stai.ed in ANSI Standard N18.7-1972 with a l
commitment to perform biennial Quality Assurance Audits of the administrative controls for procedures utilizing a representative sampling process. We have reviewed this change and agree that it provides an acceptable alternative and that your program will continue to meet the requirements of 10 CFR 50 Appendix B.
Based on our review of your submittal, we understand that your administrative controls for plant procedures contain elements for a review when a procedure is affected by other changes in the plant. The controls contain elements to ensure that affected procedures are revised when necessary.
In addition, you have committed to institute a sampling of procedures for added assurance of timely revision of procedures.
Further, you have committed to maintain a review of A0Ps and E0Ps to ensure that these procedures are maintained up to date. The periodic review of security procedures and emergency preparedness procedures are not affected by this change.
With the above sampling provision we believe that the change is an acceptable I
alternative commitment and that your program as revised will continue to meet the requirements of 10 CFR Part 50, Appendix B.
Please contact Mr. Frank Jape of my staff on 404-331-4182 if you have any questions regarding this matter.
Sincerely, (0RIGINAL SIGNED BY T. A. PEEBLES FOR) l i
Albert F. Gibson, Director i
i Division of Reactor Safety l
(cc w/ encl - See page 2) l
[]
i 9308310171 930811 PDR ADDCK 05000321 p
PDR IE43
Georgia Power Company 2
August 11, 1993 cc:
J. D. Woodard Senior Vice President Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 H. L. Sumner General Manager, Plant Hatch Georgia Power Company Route 1, Box 439 Baxley, GA 31513 S. J. Bethay Manager Licensing - Hatch Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 Ernest L. Blake, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, NW Washington, D. C.
20037 Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, SW Atlanta, GA 30334 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Thomas Hill, Manager Radioactive Materials Program Department of Natural Resources 4244 International Parkway Suite 114 Atlanta, GA 30354 Chairman Appling County Commissioners County Courthouse Baxley, GA 31513 (cc cont'd - See page 3) 1 j
i l
l Georgia Power Company 3
August 11, 1993 l
l (cc cont'd) i Dan H. Smith l
Vice President Power Supply Operations Oglethorpe Power Corporation 2100 E. Exchange Place Tucker, GA 30085-1349 Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker 12th Floor 1050 Connecticut Avenue, NW l
Washington, D. C.
20036 bcc: K. N. Jabbour, NRR A. R. Herdt, RII P. H. Skinner, RII B. Gramm, NRR F. Jape, RII Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Box 725 Baxley, GA 31513 l
DOCUMENT NAME: HATCH.0QSP RII:DRS RII:DRS RP.
A[/[Wy Y
W rh FJapeO?
C til fan frJi r e i d i
7 g f7 08/ /93 8/q/93 08/ p /93 I