Forwards Insp Repts 50-277/93-15 & 50-278/93-15 on 930615-0802.Violations Noted
ML20024J024
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/23/1993
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20024J025 List:
References
NUDOCS 9308310163
Download: ML20024J024 (3)


See also: IR 05000277/1993015

Text

-

..

,

,

,

,

g,

M,

.

hug 2 31993

l

Docket / License No. 50-277/DPR-44

50-278/DPR-56

,

Mr. D. M. Smith

Senior Vice President-Nuclear

Philadelphia Electric Company

Correspondence Control Desk

P. O. Box 195

!

Wayne, PA 19087-0195

Dear Mr. Smith:

SUBJECT:

COMBINED INSPECTION 50-277/93-15 AND 50-278/93-15

l

This letter transmits the findings of the resident safety inspection conducted by Messrs. B. S.

j

Norris, F. P. Bonnett, and R. K. Imrson from June 15 through August 2,1993, at the Peach

'

Bottom Atomic Power Station, Delta, Pennsylvania. The inspectors based these findings on

observation of activities, interviews, and document reviews. The results of the inspection were

discussed with D. Miller and others of your staff.

l

Our observation of Unit 3 outage activities indicated excellent planning and coordination between

l

working groups. The backfill, on several occasions, of the Unit 2, reactor vessel water level

l

instrument reference leg was well planned and executed. The two Unit 3 start-ups that occurred

this period were well controlled.

Based on the results of this inspection, cenain of your activities appeared to be in violation of

NRC requirements, as specified in the enclosed Notice of Violation (Notice). In three separate

areas the plant staff failed to follow procedures. Specifically, the control room staff did not

effectively control a Unit 2 power restoration resulting in a mispositioned control rod; there were

multiple examples of failure to adhere to radiation worker procedures; and procedural

noncompliances were observed during performance of a Unit 3 hydraulic accumulator level

switch surveillance. The failure to properly implement procedures in three diverse areas is of

concern to the NRC, and could be indicative of less than adequate attention to detail in these

areas.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. In your response, you should document the

!

specific actions taken and any additional actions you plan to prevent recurrence. Additionally,

!

you are requested to address the specific actions taken in response to each example in the

)

enclosed Notice separately.

l

9308310163 930823

PDR

ADOCK 05000277

i

G

PDR

l

,

i

i

..

-

-

.-

nim 9 91993

.

_-

Philadelphia Electric Company

2

-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

.

The responses directed by this letter and the enclosed Notice are not suaject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork Reduction

Act of 1980, Pub. L. No. 96.511.

We appreciate your cooperation.

l

Sincerely,

0310):.713m;;;p gy

EDWARD C. WEHlihCER

'

,

l

Edward C. Wenzinger, Chief

Projects Branch 2

Division of Reactor Projects

Enclosure:

j

1. Appendix A, Notice of Violation

2. NRC Region I Combined Inspection Report 50-277/93-15 u.d 50-278/93-15

cc w/ encl:

.

J. Doering, Chairman, Nuclear Review Board

t

D. B. Miller, Vice President, Peach Bottom Atomic Power Station

G. Rainey, Vice President, Nuclear Services Department

G. Cranston, General Manager, Nuclear Engineering Division

C. Schaefer, External Operations-Nuclear, Delmarva Power & Light Co.

G. Edwards, Plant Manager, Peach Bottom Atomic Power Station

A. J. Wasong, Manager Experience Assessment, Peach Bottom Atemic Power Station

i

G. A. Hunger, Jr., Manager, Licensing Section

J. W. Durham, Sr., Senior Vice President and General Counsel

J. A. Isabella, Director, Generation Projects Department, Atlantic Electric

B. German, Manager, External Affairs

R. McLean, Power Plant Siting, Nuclear Evaluations

D. Poulson, Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

,

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Pennsylvania

TMI- Alert (TMIA)

-

-

..

Al]G 2 a 1993

l

~

Philadelphia Electric Company

3

l-

bec w/ encl:

Region I Doc'ket Room (with concurrences)

bec w/enci via E-Mail:

l

D. Wheeler, OEDO

l

J. Shea, NRR

l

A. Cubbage, NRR

R. Woodruff, NRR

M. Boyle, PDI-2, NRR

D. Holody, EO

l

l

!

!

l

l

l

l

l

l

!

!

I

!

I

Concurrences:

-

h

/-

,[. s

!

RI/DRP

RI/DRP

RppRP

Norris

Anderson

Wenzinger

8/C/93

8/16/93

8//f /93

4

OFFICIAL RECORD COPY

l

l