ML20024J014
| ML20024J014 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 08/20/1993 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Stratman R CENTERIOR ENERGY |
| Shared Package | |
| ML20024J015 | List: |
| References | |
| NUDOCS 9308310152 | |
| Download: ML20024J014 (3) | |
See also: IR 05000440/1993014
Text
.
'
i
l*
,
l
'
AUG 2 0 dd
,
i
l
'
,
Docket No. 50-440
,
,
Centerior Service Company
ATTN: Mr. Robert A. Stratman
'
Vice president
Nuclear - Perry
P. O. Box 97, 5270
Perry, OH 4408]
Dear Mr. Stratman:
This refers to the inspection conducted by Messrs. E. Duncan, T. Tella,
R. Westberg, A. Vegel, J. Guzman, and D. Kosloff of this office, on June 23
through July 30, 1993. The inspection included a review of activities
'
authorized for your Perry Nuclear Power Plant, Unit 1, facility. At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed report.
,
Areas examined during the inspection are identified in the report.
Within
l
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
i
activities in progress.
ff? j
9
'
During this inspection, certain of your activities appeared to be in violation
of NRC requirements. However, as described in the enclosed inspection report,
l(
1
you identified these violations. Therefore, the violations will not be
subject to enforcement action because your efforts in identifying and
,
l
correcting the violations meet the criteria specified in Section VII.B.2 of
'
the " General Statement of Policy and Procedure for NRC Enforcement Actions,"
j
(Enforcement Policy, 10 CFR Part 2, Appendix C). Two of the non-cited
violations involved personnel errors, which are a continuing NRC concern at
Perry.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
,
l
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
l
1
1
9308310152 930820
ADOCK 05000440
<
O
!
!
i
'
i
l
l
- _
.
.
_ _ - _ _ _ _ _ _ . _ - .-
liUG 2 01933
-
Centerior Sesvice Company
2
-
We will gladly discuss any questions you have concerning this inspection.
j
'
Sincerely,
i
!
i
WWu I ciped by L.R. Ccq:.r u
L. Robert Greger, Chief
Reactor Projects Branch 3
i
l
Enclosure:
Inspection Report
No. 50-440/93014(DRP)
cc w/ enclosure:
R. W. Schrauder, Director, Nuclear
Support Department
Kevin P. Donovan, Manager,
Licensing and Compliance Section
N. L. Bonner, Director, Perry
'
Nuclear Engineering Dept.
H. Ray Caldwell, General
Superintendent Nuclear Operations
D. P. Igyarto, Plant Manager,
Terry J. Lodge, Esq.
James R. Williams, State of Ohio
Robert E. Owen, Ohio
Department of Health
A. Grandjean, State of Ohio
Public Utilities Commission
OC/LFDCB
j
Licensing Project Manager, NRR
Resident Inspector, RIII
bcc: PUBLIC
SEE ATTACHED CONCURRENCE
<
RIII
RIII
RIII
RIII
RIII
R
i
Duncan
Tella
Guzman
Lanksbury
Olteanu
Y
Bro
.
)
i
,
a
Centerior Service Company
2
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
Sincerely,
L. Robert Greger, Chief
Reactor Projects Branch 3
Enclosure:
Inspection Report
No. 50-440/93014(DRP)
cc w/ enclosure:
R. W. Schrauder, Director, Nuclear
Support Department
Kevin P. Donovan, Manager,
Licensing and Compliance Section
N. L. Bonner, Director, Perry
Nuclear Engineering Dept.
H. Ray Caldwell, General
Superintendent Nuclear Operations
D. P. Igyarto, Plant Manager,
Terry J. Lodge, Esq.
James R. Williams, State of Ohio
Robert E. Owen, Ohio
Department of Health
A. Grandjean, State of Ohio
Public Utilities Commission
OC/LFDCB
Licensing Project Manager, NRR
Resident Inspector, RIII
bcc:
PUBLIC
RIII
RIII
RIII
RIII
RIII
RII.
- W
JVJ
,JW
Duncan
j[t Tella
iGuzman
/glanksbury
Uk!93
01teanu
G
'r
t']>
f
[&3
tY2#3
- 5083
'
8
-__ _ ____