ML20024J011
| ML20024J011 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/25/1993 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20024J012 | List: |
| References | |
| NUDOCS 9308310150 | |
| Download: ML20024J011 (3) | |
See also: IR 05000483/1993010
Text
'
.s
s
.
.-.
AUG 2 51993
Docket No. 50-483
Union Electric Company
ATTN: Mr. Donald F. Schnell
Senior Vice President - Nuclear
Post Office Box 149 - Mail Code 400
St. Louis, MD 63166
Dear Mr. Schnell:
This refers to the routine safety inspection conducted by Mr. B. L. Bartlett,
Ms. D. R. Calhoun, and others of this office from June 1 through July 31,
1993, of activities at Callaway Plant, Unit 1, authorized by NRC Operating
License NPF-30, and to the discussion of our findings with Mr. J. D. Blosser
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). The violation involved the failure to properly control
the design process to ensure that a modification scheduled for the next
i
refueling outage was properly designed and implemented.
We are concerned that
the weaknesses identified with the performance of pipe support design
activities were identified by the NRC instead of by your management,
independent assessment, or quality assurance audits.
In your response to the
I
Notice please address this concern.
Y
st
You are required to respond to this letter and should. follow the instructions
k;i
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to the
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your responses to this letter will be placed
in the NRC Public Document Room.
9308310150 930825
ADDCK 05000483
O
i
'
s
~
\\
AUG 2 51993
'
lo'
Union Electric Company
2
i
I
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
!
,
,
- 0:lir;Trn1 signed by L.R. cm -
"
l
'
l
L. Robert Greger, Chief,
j
Reactor Projects Branch 3
Enclosures:
1.
2.
Inspection Report No. 50-483/93010(DRP)
i
cc w/ enclosure:
G. L. Randolph, Vice President,
Nuclear Operations
J. V. Laux, Manager Quality
Assurance
S. E. Sampson, Supervising
'
l
Engineer, Site Licensing
l
OC/LFDCB
l
Resident Inspector, Rlll
l
Region IV
Resident Inspector, Wolf Creek
K. Drey
'
C. John Renken, Engineer
Policy & Federal Dept.
Gerald Charnoff, Esq.
R. A. Kucera, Deputy Director,
Department of Natural Resources
Chairman, Illinois Commerce
Commission
bec: 70BLIC}.
l
SEE ATTACHED CONCURRENCE
!
M
l
RI 'I
RIII
RIII
11
j
g
Lco
/Q
!
'Ga
a
J
Olteanu
er
J
)
g,'g g3
gp q
>
.
l
t
'
!
'
.
Union Electric Company
2
1
,
e
I
!
We will gladly discuss any questions you have concerning this inspection.
j
Sincerely,
L. Robert Greger, Chief,
Reactor Projects Branch 3
Enclosures:
I.
fiotice of Violation
'
2.
Inspection Report tio. 50-483/93010(DRP)
cc w/ enclosure:
G. L. Randolph, Vice President,
14uclear Operations
J. V. Laux, tianager Quality
Assurance
S. E. Sampson, Supervising
Engineer, Site Licensing
'
OC/LFDCB
'
Resident Inspector, RIII
Region IV
>
Resident Inspector, Wolf Creek
K. Drey
C. John Renken, Engineer
Policy & Federal Dept.
j
'
(
Gerald Charnoff, Esq.
R. A. Kucera, Deputy Director,
,
'
Department of f4atural Resources
'
Chairman, Illinois Commerce
Commission
l
bcc: PUBLIC
i
RIII
AILL S
RIII
,fdh
RIII
RIII
7
J'JtcK1w3, JIbh
W4
j
l
Olteanu
Greger
!
a
fI
.
///i?
. f(t8(9 5
i
l
l
..