Forwards Insp Repts 50-352/93-15 & 50-353/93-15 on 930628- 0702.No Violations Noted
ML20024H984
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/24/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20024H985 List:
References
NUDOCS 9308310088
Download: ML20024H984 (3)


See also: IR 05000352/1993015

Text

_

h

i j

-

1

'

l

I

'

AUG 211933

!

.

Docket Nos. 50-352

50-353

5

f

Mr. D. M. Smith

l

Senior Vice President -

Nuclear

Philadelphia Electric Company

Nuclear Group Headquarters

Correspondence Control Desk

l

P. O. Box 195

i

Wayne, PA 19087-0195

'

Dear Mr. Smith:

i

SUBJECT: INSPECTION REPORT NOS. 50-352/93-15 AND 50-353/93-15

l

!

This letter refers to the announced inspection conducted by Mr. J. Carrasco and

Mr. A. Lohmeier of this office on June 28,1993, to July 2,1993, at the Chesterbrook office

and the Limerick Generating Station, Units 1 and 2, in Sanatoga, Pennsylvania. The

i

inspector discussed the results of the inspection with Mr. G. V. Cranston and other members

-

of your staff at the conclusion of the inspection.

This inspection focused on activities important to the pnblic health and safety and was

,

l

directed towards engineering and technical support with emphasis on the adequacy of selected

,

programs for plant operations including management support, interfaces with other internal

and external organizations, design modifications, experience and professional proficiency of

!

l

the engineering staff engaged in the design modifications. We also reviewed the results of

,

!

l

your NEEDS program.

,

Details on the areas examined during the inspection are described in the NRC Region I

inspection report, which is enclosed with this letter. Within these areas, the inspection

i

consisted of selected examinations of procedures and representative records, interviews with

!

personnel, and observation by the inspector.

!

.

l

l

3500C5

OFFICIAL RECORD COPY

A:LM9315. INS

I

i

9308310088 930824

i

PDR

ADOCK 05000352

f

-

.

.

.

,

.

I

I

AUG S 41993

l 'l-

t

j

Mr. D. Af. Smith

2

,

'

Within the scope of this inspection, no violations were observed. The NEEDS program was

found to be well planned and timed to minimize any adverse impact on plant operations and

plant outage activities. We noted that under your reorganized NED and Site Engineering,

.

'

the staff has sufficient technical expertise and project management skills to provide technical

leadership and operational support to the plant.

t

No reply to this letter is required. Your cooperation in this matter is appreciated.

l

Sincerely,

,

Jacque P. Durr, Chief

.

Engineering Branch

.

Division of Reactor Safety

i

Enclosure: NRC Region I Inspection Report Nos.

50-352/93-15 and 50-353/93-15

i

!

cc w/ encl-

i

J. Doering, Chairman, Nuclear Review Board

i

D. R. Helwig, Vice President - Limerick Generating Station

G. A. Hunger, Jr., Manager - Licensing Section

l

J. L. Kantner, Regulatory Engineer - Limerick Generating Station

,

Secretary, Nuclear Committee of the Board

l

'

Public Document Room (PDR)

'

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

i

l

Commonwealth of Pennsylvania

!

!

!

l

l

1

OFFICIAL RECORD COPY

A:LM9315. INS

j

!

.

.

. -

-.-., .---..-

...

,

t.

AUG 2 4 gg3

'

.

Mr. D. M. Smith

3

!

bec w/ encl:

l

Region I Docket Room (with concurrences)

bec w/ encl: (Via E-Mail)

V. McCree, OEDO

i

F. Rinaldi, NRR

l

M. Boyle, Acting PDI-2, NRR

!

l

i

!

!

l

l

l

l

!

l

i

,

'

l

C

N

.,

RI:DRS

RI:DRS

RI:DRS

Gray

Durr

i

f(A.

8 /9

8M/93

8/893

OFFICIAL RECORD COPY A: LM9315. INS