July 1,
'993 Mr. Richard P. LaRhette Institute of Nuclear Power Operations 700 Galloria Parkway Atlanta, Georgia 30339-5957
Dear Mr. LaRhette:
I Enclosed for your information is our listing of generic communications being considered or under development by the NRC staff.
The list includes all Generic Letters (GL), Bulletins (BL), Information Notices (IN), and Temporary Instructions (TI) reported to us by July 1, 1993.
In addition, the list contains proposed documents designated as Administrative Letters (AL).
These proposed documents are being considered by the NRC to inform recipients of non-safety issues which are generic in nature.
Generic Letters will continue to be used to inform recipients of safety issues and regulatory matters.
New items on the list or changes in the status of previously listed items are identified by a notation in brackets.
Because the letter is currently being sent monthly, communications that have been issued or canceled will no longer be retained on the list for an additional cycle.
This change is being made in the interest of brevity and to improve overall clarity.
Sincerely, b:i 1cs1 cignez g,.
G Dil H.Ihret:;
Gail H. Marcus, Chief Generic Communications Branch Division of Operating Reactor Support Office of Nuclear Reactor Regulation
Enclosure:
As stated cc:
S.
D.
Richardson, Defense ProgrLns (Sava1>.h River), DOE R. W.
Barber, Safety and Quality Assurance, JOE S.
Scott, Office of Nuclear' Safety, NS-10, DC E khh"" f Q 'i}~
DISTRIBUTION w/ enclosure JTShedlosky, OCM JScarborough, 0 M KAConnaughton, OCM JGuttmann, OCM WHBateman, EDO JGPartlow, NRR All NRR' Division Directors All NRR Branch Chiefs f
All Regional Division Directors KGray, NRR e
RIngram, NRR CACarpenter,NRR g{
O RFraley, ACRS TMNovak, AEOD I
JERosenthal, AEOD PWBaranowsky, AEOD o
OGCB Members -
1700G5 pDR 1
Zw JCantraliFiles DORS R/F M
OGCB R/F JBirmingham R/F
(~jg>_' Q(r[,].f
- , g f g g.
g Document Name:
INPOLIST.LTR oeus OGCB: DORS:NRR C/OGCB: DORS:NRR y' gjji f, /'
V y[ N w.
s JBirming!am GHMarcu
.p 7// /93
^/j7 7/ //93
/
([,bh y AN, k (yl Q S h h D
1
( p-3 w
July 1, 1993 s
Mr. Richard P.
LaRhette Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957
Dear Mr. LaRhette:
Enclosed for your information is our listing of generic communications being considered or under development by the NRC staff.
The list includes all Generic Letters (GL), Bulletins (BL), Information Notices (IN), and Temporary Instructions (TI) reported to us by July 1, 1993.
In addition, the list contains proposed documents designated as Administrative Letters (AL).
These proposed documents are being considered by the NRC to inform recipients of non-safety issues which are generic in nature.
Generic Letters will continue to be used to inform recipients of r.afety issues and regulatory matters.
New items on the list or changes in the status of previously listed items are identified by a notation in brackets.
Because the letter is currently being sent monthly, communications that have been issued or canceled will no longer be retained on the list for an additional cycle.
This change is being made in the interest of brevity and to improve overall clarity.
Sincerely, Drigir.s1 Eicned 1; -
Gail R.Ihre a Gail H. Marcus, Chief Generic Communications Branch Division of Operating Reactor Support Office of Nuclear Reactor Regulation i
Enclosure:
As stated cc:
S.
D. Richardson, Defense Programs (Savannah River), DOE R.
W. Barber, Safety and Quality Assurance, DOE S.
Scott, Office of Nuclear Safety, NS-10, DOE DISTRIBUTION w/ enclosure JTShedlosky, OCM JScarborough, OCM KAConnaughton, OCM JGuttmann, OCM WHBateman, EDO JGPartlow, NRR All NRR Division Directors All NRR Branch Chiefs All Regional Division Directors KGray, NRR RIngram, NRR CACarpenter,NRR KRamsey, NMSS FCCombs, NMSS LCShao, RES WMinners, RES RFraley, ACRS TMNovak, AEOD JERosenthal, AEOD.
PWBaranowsky, AEOD OGCB Members PDR Central Files DORS R/F OGCB R/F JBirmingham R/F Document Name:
INPOLIST.LTR OGCB: DORS:NRR C/OGCB: DORS:HRR JBirmin am GHMarcuy,7.
7/J /93
}//>
7/ )/93 74 t
$go ac c %,
o bQ g
UNITED STATES
[ w[L[, t]
NUCLEAR REGULATORY COMMISSION y
.i
- g g ^ ~
e y
WASHINGTON, D.C. 20 % 5 0001 July 1, 1993 Mr. Richard P.
LaRhette Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957
Dear Mr. LaRhette:
Enclosed for your information is our listing of generic communications being considered or under development by the NRC staff.
The list includes all Generic Letters (GL), Bulletins (BL), Information Notices (IN), and Temporary Instructions (TI) reported to us by July 1, 1993.
In addition, the list contains proposed documents designated as Administrative Letters (AL).
These proposed documents are being considered by the NRC to inform recipients of non-safety issues which are generic in nature.
Generic Letters will continue to be used to inform recipients of safety issues and regulatory matters.
New items on the list or changes in the status of previously listed items are identified by a notation in brackets.
Because the letter is currently being sent monthly, communications that have been issued or canceled will no longer be retained on the list for an additional cycle.
This change is being made in the interest of brevity and to improve overall clarity.
Sincerely,
/w Gail H. Marcus, Chief Generic Communications Branch Division of Operating Reactor Support Office of Nuclear Reactor Regulation
Enclosure:
As stated cc:
S.
D. Richardson, Defense Programs (Savannah River), DOE R.
W.
Barber, Safety and Quality Assurance, DOE S.
Scott, Office of Nuclear Safety, NS-10, DOE l
/
w PDge No.
1 07/01/93 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE No GL ISI OF MARK I & II STEEL NRR DE Chen P Tan (301)
CONTAINMENTS, REFUEL CAVITIES, &
ESGB 504-3315 DRAINAGE SYSTEMS GL TS IMPROVEMENT, ACCELERATED EDG NRR DORS Om Chopra (301)
TESTING OTSB Tom Dunning 504-3150 GL INST OF MICROPROCESSORS IN SAFETY NRR DRCH Paul Loeser (301)
SYSTEMS VIA 10 CFR 50.59 HICB 504-2825 GL GROUNDS IN DIRECT CURRENT NRR DE F Burrows (301)
DISTRIBUTION SYSTEMS EELB 504-2901 GL UTILITY IMPLEMENTATION OF ACCIDENT NRR DSSA Robert (301)
MANAGEMENT PLANS SPSB Palla 504-1095 GL TS MODIFICATION FOR EMERGENCY &
NRR DORS Tom Dunning (301)
SECURITY PLANS OTSB 504-1189 GL TS IMPROVEMENT, REDUCED TESTING NRR DORS Tom Dunning (301)
{
DURING POWER OPERATION OTSB 504-1189 GL TS MODIFICATION, REQUIREMENTS FOR NRR DORS Bob Tjader (301)
MOVABLE CONTROL ASSEMBLIES OTSB 504-1187 GL REMOVAL OF TS TABLES FOR RESPONSE NRR DORS Tom Dunning (301)
TIME LIMITS OTSB 504-1189 IN RVW OF MFR's INFO ON COMPUTERIZED NMSS IMNS Cathy Haney (301)
THERAPY PLANNING SYSs IMOB 504-2628 GL INSERVICE LEAK AND HYDROSTATIC NRR DORS Carl S (301)
TESTING TS BACKFIT APPEAL OTSB Schulten 504-1192 IN LATE ENTRY [IN 93-25, 4/1/93)
NRR DORS Vern Hodge (301)
ELECTRICAL PENETRATION ASSEMBLY OGCB 504-1861 DEGRADATION GL INTERFACING SYSTEMS LOCA IN LIGHT RES RPSIB Gary (310)
WATER REACTORS Burdick 492-3812 TI REPORTING LOSS OF CRITICALITY SAFETY NMSS IMNS A T Clark (301)
CONTROLS IMSB 504-3424 GL NRC POSITION ON EPRI OBE CRITERIA AND NRR DE Goutam (301)
EPRI GUIDE FOR EARTHQUAKES ECGB Bagchi 504-2733 GL EMERGENCY CLASSIFICATION DURING NRR DRSS Scott (301)
CONTAINMENT VENTING PEPB Boynton 504-2919 i
+-
i.'
Page No.
2 07/01/93 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE NO GL LONG TERM ACTIONS FOR THERMAL NRR DSSA Laurence E (301)
HYDRAULIC STABILITY SRXB Phillips 504-3232 GL TS MODIFICATION, REQUIREMENTS FOR NRR DORS Tom Dunning (301)
ACCIDENT MONITORING INSTRUMENTATION OTSB 504-1189 GL [ REMOVED] TS MODIFICATION, NRR DORS Tom Dunning (301)
REQUIREMENTS FOR CYCLIC / TRANSIENT OTSB 504-1189 LIMITS IN APPLICABILITY OF 10 CFR 70.24, NRR D.'PW L Kokajko (301)
" CRITICALITY ACCIDENTS,"
PD5 504-1369 IN NON-POWER REACTOR SOFTWARE NRR DORS Marvin (301)
VERIFICATION AND VALIDATION ONDB Mendonca 504-1128 REGULATORY EXPERIENCE IN REPORTING FUEL CYCLE AND MATERIALS NMSS IMNS Kevin (301)
INCIDENTS TO THE NRC OPS CENTER IMOB Ramsey 504-2534 IN EXTENDED STORAGE OF GREATER-THAN-NMSS IMNS Kevin.
(301)
CLASS-C SEALED SOURCES IMOB Ramsey 504-2534 GL MODEL TECHNICAL SPECIFIr\\TIONS TO NRR DRSS SP (301)
INCORPORATE THE REVISEL 10 CFR PART PRPB Klementowic 504-1084 20 z
IN IN 92-51 SUP: MISAPPLICATION AND NRR RVIB Steve (301)
INADEQUATE TESTING OF MCCBs DRIL Alexander 504-2995 TI SHUTDOWN RISK AND OUTAGE MANAGEMENT NRR DRIL Don Norkin (301)
INSPECTION RSIB 504-2954 GL AVAILABILITY AND ADEQUACY OF DESIGN NRR DRIL Eugene (301)
BASES INFORMATION RSIB Imbro 504-2967 GL PLANT OPERATION DURING SHUTDOWN AND NRR DSSA Mark Caruso (301)
LOWPOWER SRXB 504-3235 IN MAIN STEAMLINE BREAK ANALYSIS REGION II Nancy (301)
INDICATES PROBLEMS IN VALVE VAULTS Campbell 504-2836 IN FAILURES OF WESTINGHOUSE 7300 PROCESS REGION II T J Kim (301)
CARDS FROM-INCORRECT FUSING 504-2841 GL (GL 89-10 SUP 5] INACCURACY OF NRR DE Dick (301)
MOTOR-OPERATED VALVE DIAGNOSTIC EMEB Kiessel 504-2840 EQUIPMENT
O O
Page No.
3 07/01/93 4
PROPOSED GENERIC COMMUNICATIONS i
IN PREPARATION WITHIN THE NRC 3
TP SUBJECT SOURCE CONTACT PHONE NO IN POTENTIAL FAILURES OF EDGs CAUSED BY REGION 1 Vern Hodge (301) l COLD FUEL OIL 504-1861 i
IN INDETERMINATE SOLENOIDS IN THE MSIV NRR DRIL Kamal Naidu (301)
.l AIR-MANIFOLD OPERATORS RVIB 504-2980
{
IN WESTINGHOUSE RFACTOR COOLANT. PUMP REGION III Rick Roton (815) f SHUTDOWN PROCEDURES FOR NO. 1 SEALS 458-2852 IN NRC STUDY ON PRESSURE LOCKING &
THERMAL BINDING OF GATE VALVES EMEB Scarbrough 504-2794 IN [IN 93-43, 4/10/93) USE OF REGION II T J Kim (301)
INAPPRCPRIATE LUBRICATION OILS IN 504-2841 i
SAFETY-RELATED APPLICATIONS
-l IN [IN 93-47, 6/18/93] UNRECOGNIZED LOSS REGION III B Bartlett (314)
OF CONTROL ROOM ANNUNCIATORS 676-3181 GL VERIFICATION OF PLANT RECORDS NRR DRCH Vern Hodge (301)
HOLB 504-1861 GL RESOLUTION OF GSI 106 PIPING & USE OF RESEARCH Vern Hodge (301)
COMBUSTIBLE GASES IN VITAL AREA 504-1861 IN_ TASK GROUP REPORT, VOLTAGE BASED NRR DSSA Bill Long (301)
PLUGGING CRITERIA FOR SG TUBES SCSB 504-3026 GL RVW GUIDANCE ON TEMP CORRECTIVE NRR DE Don (301)
MEASURES FOR MEDIUM FNERGY ASME-3 EMEB Kirkpatrick 504-1849 PIPE IN TEMPER EMBRITTLEMENT OF BYRON JACKSON NRR DE 7 Davis (301)
PUMP COUPLINGS EMCB 504-2713
-t IN (IN 93-44, 6/15/93) OPERATIONAL REGION II G MacDonald (404)
CHALLENGES DURING A DUAL UNIT 331-5576 TRANSIENT IN DUAL UNIT REACTOR TRIP DURING-REGION II G MacDonald (404)
' SWITCHYARD BREAKER TESTING 331-5576 4
IN TESTING OF BACKUP EMERGENCY RESPONSE NRR DRSS Edwin F Fox (301)
FACILITIES PEPB 504-2908 IN DEGRADATION OF SR SYSTEMS DURING REGION II P Kim (704).
VALVE STROKE SURVEILLANCE TESTING VanDoorn 875-1681 AL PROPOSED, NRC TO USE ADMIN' LETTERS NRR DORS- -Dick (301)
RATHER THAN GLs FOR NONSAFETY ISSUES OGCB Kiessel 504-2840
(
i L
i
a w
Page No.
4 07/01/93 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE NO IN QA ACTIVITIES RELATED TO AMSAC NRR DORS Eric Benner (301)
EAB 504-1171 IN NONCONSERVATISMS IN LOW-TEMPERATURE NRR DORS Thomas (301)
OVER PRESSURE PROTECTION EAB Koshy 504-1176 FORPRESSURIZED-WATER REACTORS IN DIRTY OIL IN TD OIL PUMP CONTROLS NRR DORS Thomas (301)
DEFEATS RV OVERFILL PROTECTION EAB Greene 504-1175 IN THERMAL STRATIFICATION IN A BWR NRR DORS Jerry (301)
REACTOR VESSEL EAB Carter 504-1153 IN IN SUP: FALSIFICATION OF PLANT NRR DORS Tom Greene (301)
RECORDS EAB 504-1175 IN IIN 93-45, 6/16/93] DEGRADATION OF REGION I Peter Wen (301)
SHUTDOWN COOLING SYSTEM PERFORMANCE 504-2832 GL USE OF THERMOLAG 331 FIRE-SYSTEM NRR DES Dick (301)
SPLB Kiessel 504-2840 IN UNEXPECTED OPENING OF BOTH DOORS OF NRR DORS Jerry (301)
CONTAINMENT AIRLOCK EAS Carter 504-1153 TI INSPECTION OF IMPLEMENTATION OF NRR DE Amar Pal (301)
STATION BLACKOUT RULE EELB 504-2760 IN POTENTIAL BREACH OF PRIMARY NRR DORS Tom Greene (301)
CONTAINMENT EAB 504-1175 IN TURBINE OVERSPEED & RCS COOLDOWN DUE NRR DORS Eric Ber.ner (301)
TO RELATCHING OF MAIN TURBINE EAB 504-1171 IN COMPUTER AND SOFTWARE DEFICIENCIES NRR DORS Eric Benner (301)
EAB 504-1171 IN [IN 03-42, 6/9/93] FAILURES OF NRR DE Dave (301)
ANTI-ROTATION KEYS IN MOTOR-OPERATED EMEB Fischer 504-2728 VALVES MANUFACTURED BY VELAN GL THERMAL GROWTH AND STRUCTURAL DESIGN NRR DE Vern Hodge (301)
ECGB 504-1861 IN WEAKNESS IN EOPS TO FOUND DURING REGION V Dennis (510)
STEAM GENERATOR TUBE RUPTURE Kirsch 975-0290 IN TIME DELAYS NOT INCLUDED IN TS TIME REGION IV Bill (817)
RESPONSE LIMITS Johnson 360-8148
~
/
O Page No.
5 07/01/93 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE NO IN FIRE EVENT AT CHERNOBYL PLANT NRR DORS Eric Benner (301)
OEAB 504-1151 IN [ CANCELED] UNDETECTED LEAKAGE THRU REGION II Peter Wen (301)
DOUBLE O-RING FLANGE CONNECTIONS 504-2832 IN PROBLEMS WITH TESTING OF TURBINE REGION IV Peter Wen (301)
DRIVEN AFW PUMPS 504-2832 IN POTENTIAL CHARGING PUMP MALFUNCTIONS NRR DSSA Don (301)
SRXB Kirkpatrick 504-1849 IN PROBLEMS WITH SWITCHOVER TO HOTLEG NRR Nancy (301)
INJECTION AFTER A LOCA Campbell 504-2836 IN 1E BUS AND LOAD VULNERABILITY TO NRR DE C Morris (301)
UNEXPECTED BUS TRANSFER EELB SO4-2778 IN CERTIFYING OFFICIALS ON NRC FORM 313, NMSS IMNS Scott W (301)
" APPLICATION FOR MATERIAL LICENSE" IMOB Moore 504-2514 IN UNDERVOLTAGE RELAY SETTINGS NRR DSSA Nancy (301)
EELB Campbell 504-2836 IN [NEW] SHUTDOWN EVENTS, RCS NRR DORS Eric Benner (301)
CONFIGURATION CONTROL EAB 504-1171 IN [NEW] GUNK ON RELAYS AT ST LUCIE NRR DORS Thomas (301)
EAB Koshy 504 1176 IN [NEW] MISAPPLICATION OF FUSES IN NRR DORS Nick Fields (301)
SAFETY RELATED SYSTEMS (STP)
EAB 504-1173 IN [NEW] MATERIAL CONTROL NRR DORS Eric Benner (301)
EAB 504-1171 IN [IN 93-46, 6/9/93] POTENTIAL PROBLEM NRR DSSA Margaret (301)
WITH WESTINGHOUSE ROD CONTROL SYSTEM SRXB Chatterton 504-2889 AND INADVERTENT WITHDRAWAL OF A SINGLE ROD CONTROL CLUSTER 1
IN [IN 92-06S1, 7/1/93] RELIABILITY OF NRR DORS Eric Benner (301)
ATWS MITIGATION SYSTEMS AND OTHER NRC OEAB 504-1171 REQUIRED EQUIPMENT NOT CONTROLLED BY TECHNICAL SPECIFICATIONS GL [NEW) LOW-TEMPERATURE OVER PRESSURE NRR Tony Gody, (301)
SETPOINT METHODOLOGY PDIII-3 Jr 504-1387
)
l J
g v
w Page No.
6 07/01/93 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE NO IN [NEW) POTENTIAL FAILURE OF LONG-TERM NRR DSSA David Shum (301)
N2 SUPPLY FOR ADS AT FITZPATRICK SPLB 504-2860 IN [NEW) COMMON DEPENDENCIES IN CCW REGION II JL (401)
SYSTEMS Shackelford 331-0338 IN [ HEW] TURKEY POINT HURRICANE LESSONS REGION II Marc Harper (301)
LEARNED 504-2915 IN [NEW) QUAD CITIES HPCI RUPTURE DISC NRR DORS Peter Wen (301)
FAILURE OEAB 504-2832 IN [NEW) POTENTIAL PROBLEMS WITH FIRE REGION I Dick (301)
BARRIER PENETRATIONS Kiessel 504-2840 GL [GL 93-04, 6/21/93] ROD CONTROL NRR DSSA Margaret (301)
SYSTEM FAILURE AND WITHDRAWAL OF ROD SRXB Chatterton 504-2889 CONTROL CLUSTER ASSEMBLIES I