ML20024H854

From kanterella
Jump to navigation Jump to search
Informs That Triannual Plant Performance Review for Branch 4 Facilities Scheduled for 930817.Plant Status Repts & Master Insp Plans for Plants Encl.Evaluation of Licensee Performance in Assigned SALP Functional Area Required
ML20024H854
Person / Time
Site: Browns Ferry, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/05/1993
From: Crlenjak R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Cline W, Dan Collins, Hebdon F, Julian C, Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), Office of Nuclear Reactor Regulation
Shared Package
ML20024H855 List:
References
NUDOCS 9308260174
Download: ML20024H854 (3)


Text

__

46 AUG 5 1993 MEMORANDUM FOR: Caudie A. Julian, Chief, Engineering Branch Division of Reactor Safety Thomas A. Peebles, Chief, Operations Branch Division of Reactor Safety William E. Cline, Chief, Emergency Preparedness and Radiological Branch Division of Radiation Safety and Safeguards Douglas M. Collins, Chief, Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards Frederick J. Hebdon, Director Project Directorate II-4 Office of Nuclear Reactor Regulation FROM:

Richard V. Crlenjak, Chief, Reactor Projects Branch 4 Division of Reactor Itojects

SUBJECT:

TRIANNUAL PLANT PERFORMANCE REVIEW FOR BRANCH NO. 4 FROM APRIL 1993 THROUGH JULY 1993 The triannual plant performance review for Branch No. 4 facilities is scheduled for August 17, at 10:00 a.m., in the DRP Conference Room. The plant status reports and master inspection plans for each plant are enclosed.

Senior Resident Inspectors and NRR Project Managers for each facility should be available, by phone, to participate in this meeting. The order of plant discussion will be Sequoyah and Browns Ferry.

Each Division participant should be prepared to provide an evaluation of the licensee's performance in their assigned SALP functional area at each plant and to recommend required changes in the MIP program for the remainder of the SALP cycle.

In addition, participants should be prepared to discuss the status of their assigned inspection program.

Enclosure I contains the agenda for the meeting.

(Original signed by R. Crlenjak)

Richard Y Crlenjak

Enclosures:

(See page 2) i E3OB260 b4 930805 E

I DR ADDCK 0500 9

i l

a.

AUS 5 1993

' =

Multiple Addressees 2

Enclosures:

1.

Agenda 2.

Updated Plant Status Reports 3.

Master Inspection Plans cc w/encls:

S. D. Ebneter, RII L. A. Reyes, RII E. W. Merschoff, RII A. F. Gibson, RII J. P. Stohr, RII J. R. Johnson, RII P. J. Kellogg, RII W. E. Holland, (Sequoyah)

C. A. Patterson, (Browns Ferry)

S. E. Sparks, RII S. J. Vias, RII L. J. Watson, RII L.'R. Plisco, EDO D. E. LaBarge, NRR T. M. Ross, NRR DRPATI DRP/R I DRP I

SSpi(r pF s:vyg L

son PK ogg 08

/93 08/J/93 08}/93