ML20024H622

From kanterella
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leak Rate Test (910202-0305) Braidwood Unit 1.
ML20024H622
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 05/31/1991
From: Checca A
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20024H623 List:
References
NUDOCS 9106070104
Download: ML20024H622 (1)


Text

-___

s 6 Commonwealth Edison o 1400 Opus Place OC7 Downers Grove, Illinois 60515 May 31,1991 Dr. Thomas E. Murley, Director Office Of Nucioar Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Document Control Desk

Subject:

Braldwood Station Unit 1 Reactor Containment Guilding Integrated Leak Rate Test NRO Docket No 50 450 _

Reference:

(a) August 19,1980 letter from 1.M. Johnson to H.R. Denton

Dear Dr. Murley:

Reference (a) provided the technical report of the Braldwood Unit 1 3reoperational reactor containment building integrated leak rate test conducted aetween May 21 and May 29,1986. Enclosed is the technical report of the Braidwood Unit 1 reactor containment building integrated leak rate test conducted between February 2 and March 5,1991. This is being submitted pursuant to the requirements of 10 CFR 50, Appendix J.Section V.

The enclosed report describes the type A containment leakage rate test conducted in accordance with the requirements of Appendix J and throu0 h the oorformance of 18wVG 6.1.2.a 1," Unit 1 Primary Containment Type A Integrated eakage Rate Test (ILRT)".

Please direct any questions you may have regarding this matter to this office, Very truly yours, M L Allen R. Checca Nuclear Licensing Administrator Attachment 1: Reactor Containment Building Integrated Leak Rate Test for Braldwood Unit 1 cc: R.M. Pulsifer Project Manager, NRR S. Dupont-Senior Resident inspector BW W. Shafer-Branch Chief, Rlll 9106070104 gion [jffI PR Anoa: osoooa; rrin s

(1-

, A g.s :lD767:33