Forwards Insp Rept 50-445/91-17 & 50-446/91-17 on 910430-0503.No Violations or Deviations Noted
ML20024H558
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/31/1991
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20024H559 List:
References
NUDOCS 9106050025
Download: ML20024H558 (3)


See also: IR 05000445/1991017

Text

1

\\-

'

MAY 3 l 199l

Docket Nos. 50-445/91-17

50-446/91-17

License No. NPF-87

Construction Permit No. CPPR-127

TV Electric

ATTN:

W. J. Cahill, Jr., Executive

Vice President, Nuclear

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-445/91-17; 446/91-17

This refers to the inspection conducted by Ms. Linda McLean of this office

during the period April 30 through May 3, 1991, of activities authorized by NRC

Operating License NPF-87 for Comanche Peak Steam Electric Station (CFSES).

At

the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed report.

The area examined during the inspection was the implementation of your

fitness-for-duty (FFD) program. Within this area, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspector.

The inspection findings are

documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Based on the results of this inspection, NRC concluded that the development and

implementation of your FFD program were responsive to both the spirit and the

intent of the NRC FFD rule.

We also found that the professionalism of the

personnel involved in administering the program was ccmmendable.

As described in the enclosed report, we are pleased to note numerous program

strengths in your program;

management's strong support for the program; the

thorough and innovative quality assurance (QA) audit; and the interface with

corporate security in the FFD program, to name a few.

The strengths of your

program have contributed to meeting the objectives of the rule with an overall

goal to have reliable and trustworthy workers at CPSES.

There was one program weakness identified during the inspection:

the absence

l

of a clear procedure describing required training for designated contract

!

supervisors. A commitment was made during the inspection to revise this

procedure with an effective date of May 6, 1991.

RIV:NMSIS q b :NMSISt *

D:DRSS

D: }

-

'

MLMcLean:st

CLCain

ABBeat

S 6 ins

5 /4 /91

S/12/91

4/$o/91 n

o/o

}

s

1

7

!

9106050025 910531

7~ '

'/

<

m

PDR

ADOCK 05000445

"I- t - /

I

l

0

PDR

.,__.- _ _ _ _ _ . _ . _ _ . _ . _ _ . . _ _ _

._.._

.

.

TV Electric

-2-

In accordance.with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosure will be placed in the NRC Public Document Roori.

Sincerely,

Ori 'nM E.';lnmi Oy:

9

Samuci J. Cc!!ns

Samuel J. Collins, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-445/91-17

50-446/91-17

cc w/ enclosure:

TV Electric

ATTN:

Roger D. Walker, Manager

Nuclear. Licensing

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

Juanita Ellis

'

President - CASE

1426 South Polk Street

Dallas, Texas--75224

GDS Associates, Inc.

Suite 720

1850 Parkway Place

Marietta, Georgia 30067-8237-

- TU Electric

<

Bethesda Licensing

3 Metro Center, Suite 610'

,

l-

Bethesda, Maryland 20814.

Jorden, Schulte, and Burchette

-ATTN: _ William A. Burchette, Esq.

l-

Counsel for Tex-La Electric

'

Cooperative of Texas

1025 Thomas Jefferson St., N.W.

i

Washington, D.C.

20007

l

'

I

d Y

't#"

-

9

e& * - '

Y~"

'

" ' ' ' ' ' " ' '

W~

' ~*

  • "~'

'

" *

'

.

.

4

TU Electric

3--

-

a

Newman & Holtzinger, P.C.

ATTN: Jack R. Newman, Esq.

- 1615.L. Street, N.W.

Suite 1000

Washington, D.C.

20036

Texas Department of Labor & Standards

- ATIN:

G. R. Bynog, Program Manager /

-

Chief Inspector

Soiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

-

Honorable Dale McPherson

.

County Judge

P.O. Box 851 Glen Rose, Texas 76043

-Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

Owen L. Thern, President

Quality Technology Company

Oak Dale Park - Space 101

Box 1619

Glen Rose, Texas 76043

bec to DMB (IE04)

bec distrib. by RIV:

  • R. 0.- Martin
  • Resident Inspector (2)
  • DRP
  • DRS
  • Section Chief (DRP/B)
  • Project Engineer (DRP/B)
  • DRSS-RPEPS

Lisa Shea, RM/ALF

- * MIS System

  • RSTS Operator

-

  • RIV Files-
  • ABBeach
  • CLCain
  • MLMcLean
  • Security File

DMcGuire, RII

JCreed, RIII

MSchuster, RV

RKeimig,' RI

-

1

  • w/766-

e

i

w

  • -J

=,,---

m.--,

,,-m.

--

x+

c.---

---m-

~

tm