r s-A TennetseA2$y Au' hon'y. I101 Mwhet bt'eet Ch#arooga iewwee 3N02 M4nf 141991 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter or
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - UNITS 1 AND 2 - LOOK-BACK REVIEW OF CABLE ISSUES (TAC-No. 77129/77130)
Reference:
TVA letter to NRC dated January 25, 1991, "Sequoyah Nuclear Plant (SQN) - Units 1 and 2 - Look-Back Review of Cable issues ' TAC No. 77129/77130)"
By the referenced letter, TVA supplied NRC with the TVA report summarizing.the look-back review of cable issues performed by the Nuclear Quality Audit and Evaluation Organization.
Subsequent to issuance of this report, additional information was obtained that revealed minor discrepancies in the report. TVA is providing these corrections to NRC to supplement the docketed report in the referenced letter. The changes are being made to ensure accuracy, but are not considered to alter the report conclusions'in any substantive manner. The enclosure provides the corrections to the look-back review report.
Please direct questions concerning this issue to Keith C. Weller at (615) 843-7527.
Very truly yours, TENNESSEE VALLEY AUTHORITY GW E. G. Wallace, Manager
-Nuclear Licensing-and Regulatory Affairs l
Enclosure cc: See page 2 l
Ah. f i
9105210467 910514 PDR ADOCK 05000327 P
PDR f
f L
I
2 U.S. Nuclear Regulatory Commicolon hi40f 141391 cc (Enclosure):
Ms. S. C. Black, Deputy Director Project Directorate 11-4 U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. D. E. LaBargo, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 373/9 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Coorgia 30323
. ~ -
,.. +
ENCLOSURE 1
Supplement to hook-Back Review of Cable lorran This enclosure supplemento TVA's report summarizing tho io, onck review of cable issues performed by the Nuclear Quality Audit and Evaluation (NQA&E)
Organization, The original look-back review report indicated that in Nuclear Engineering procedure (NEP)-3.1, Revision 0, " Calculations," the manager responsible for initiating electrical calculations was the lead electrical engineer for project calculations and the accistant branch chief for branch calculations.
NEp-3.1, Revision 0, actually assigned responsibility to the lead cicctrical engineer or group head for electrical calculations.
(Revision 1 of NEp-3.1, in general, substituted " Assistant Branch Chief" for group head whero it appeared in Revision 0.)
Subsequent to the referenced report, NQA&E was made aware of another procedure Procedure Mothod 81-27, Revision 2. " Delegation of Signaturo Authority and Conduct of Specialipto Reviews." This procedure delegated the responsibility of signature authority to the anoistant branch chief for branch calculations and to the lead engineer for project calculat. ions.
It is apparent from the interviews of the Sequoyah Nucicar plant lead j
electrical enginecro and the former asciutant branch chief, documented in paragraph V.D. of the referenced report, that there was not a clear understanding as to whether the subject calculations were " project initiated" or " branch initiated." Accordingly, based on those interviews and review of the above procedural controls, the conclusions reached in paragraph V.A.-7, page 7 of the referenced report, remair unchanged.
One additional minor report correction in that in the referenced report, all references to calculation SQN-CSTF-008 should read EEB-CSTF-0008,